H.B. 277 Enrolled
1
CONSTRUCTION AMENDMENTS
2
2007 GENERAL SESSION
3
STATE OF UTAH
4
Chief Sponsor: Michael T. Morley
5
Senate Sponsor:
Scott K. Jenkins
6
7
LONG TITLE
8
General Description:
9
This bill addresses construction related lien provisions.
10
Highlighted Provisions:
11
This bill:
12
. clarifies the time limits for filing a lien notice;
13
. addresses information and forms required to be provided to the owner of a residence
14
that is the subject of an action to enforce a lien;
15
. addresses the effect of a notice of commencement on earlier work;
16
. exempts wage laborers from filing a preliminary notice with the State Construction
17
Registry;
18
. addresses rights under Title 38, Chapter 11, Residence Lien Restriction and Lien
19
Recovery Fund Act; and
20
. makes technical changes.
21
Monies Appropriated in this Bill:
22
None
23
Other Special Clauses:
24
None
25
Utah Code Sections Affected:
26
AMENDS:
27
38-1-7, as last amended by Chapters 205 and 297, Laws of Utah 2006
28
38-1-11, as last amended by Chapter 297, Laws of Utah 2006
29
38-1-25, as last amended by Chapter 257, Laws of Utah 2001
30
38-1-31, as last amended by Chapter 297, Laws of Utah 2006
31
38-1-32, as last amended by Chapter 297, Laws of Utah 2006
32
38-1-33, as last amended by Chapter 297, Laws of Utah 2006
33
38-11-204, as last amended by Chapter 64, Laws of Utah 2005
34
35
Be it enacted by the Legislature of the state of Utah:
36
Section 1.
Section
38-1-7
is amended to read:
37
38-1-7. Notice of claim -- Contents -- Recording -- Service on owner of property.
38
(1) (a) (i) Except as modified in Section
38-1-27
, a person claiming benefits under this
39
chapter shall file for record with the county recorder of the county in which the property, or
40
some part of the property, is situated, a written notice to hold and claim a lien within [90]:
41
(A) 180 days after the [date of] day on which occurs final completion of the original
42
contract [under which the claimant claims a lien under this chapter.] if no notice of completion
43
is filed under Section
38-1-33
; or
44
(B) 90 days after the day on which a notice of completion is filed under Section
45
38-1-33
.
46
(ii) For purposes of this Subsection (1), final completion of the original contract, and
47
for purposes of Section
38-1-33
, final completion of the project, means:
48
(A) if as a result of work performed under the original contract a permanent certificate
49
of occupancy is required for the work, the date of issuance of a permanent certificate of
50
occupancy by the local government entity having jurisdiction over the construction project;
51
(B) if no certificate of occupancy is required by the local government entity having
52
jurisdiction over the construction project, but as a result of the work performed under the
53
original contract an inspection is required as per state-adopted building codes for the work, the
54
date of the final inspection for the work by the local government entity having jurisdiction over
55
the construction project; or
56
(C) if with regard to work performed under the original contract no certificate of
57
occupancy and no final inspection are required as per state-adopted building codes by the local
58
government entity having jurisdiction over the construction project, the date on which there
59
remains no substantial work to be completed to finish the work on the original contract.
60
(b) Notwithstanding Section
38-1-2
, where a subcontractor performs substantial work
61
after the applicable dates established by Subsections (1)(a)(ii)(A) and (B), that subcontractor's
62
subcontract shall be considered an original contract for the sole purpose of determining:
63
(i) the subcontractor's time frame to file a notice of intent to hold and claim a lien
64
under this Subsection (1); and
65
(ii) the original contractor's time frame to file a notice of intent to hold and claim a lien
66
under this Subsection (1) for that subcontractor's work.
67
(c) For purposes of this [section] chapter, the term "substantial work" does not include:
68
(i) repair work; or
69
(ii) warranty work.
70
(d) Notwithstanding Subsection (1)(a)(ii), final completion of the original contract does
71
not occur if work remains to be completed for which the owner is holding payment to ensure
72
completion of that work.
73
(2) (a) The notice required by Subsection (1) shall contain a statement setting forth:
74
(i) the name of the reputed owner if known or, if not known, the name of the record
75
owner;
76
(ii) the name of the person:
77
(A) by whom the lien claimant was employed; or
78
(B) to whom the lien claimant furnished the equipment or material;
79
(iii) the time when:
80
(A) the first and last labor or service was performed; or
81
(B) the first and last equipment or material was furnished;
82
(iv) a description of the property, sufficient for identification;
83
(v) the name, current address, and current phone number of the lien claimant;
84
(vi) the amount of the lien claim;
85
(vii) the signature of the lien claimant or the lien claimant's authorized agent;
86
(viii) an acknowledgment or certificate as required under Title 57, Chapter 3,
87
Recording of Documents; and
88
(ix) if the lien is on an owner-occupied residence, as defined in Section
38-11-102
, a
89
statement describing what steps an owner, as defined in Section
38-11-102
, may take to require
90
a lien claimant to remove the lien in accordance with Section
38-11-107
.
91
(b) Substantial compliance with the requirements of this chapter is sufficient to hold
92
and claim a lien.
93
(3) (a) Within 30 days after filing the notice of lien, the lien claimant shall deliver or
94
mail by certified mail a copy of the notice of lien to:
95
(i) the reputed owner of the real property; or
96
(ii) the record owner of the real property.
97
(b) If the record owner's current address is not readily available to the lien claimant, the
98
copy of the claim may be mailed to the last-known address of the record owner, using the
99
names and addresses appearing on the last completed real property assessment rolls of the
100
county where the affected property is located.
101
(c) Failure to deliver or mail the notice of lien to the reputed owner or record owner
102
precludes the lien claimant from an award of costs and attorneys' fees against the reputed
103
owner or record owner in an action to enforce the lien.
104
(4) The Division of Occupational and Professional Licensing shall make rules
105
governing the form of the statement required under Subsection (2)(a)(ix).
106
Section 2.
Section
38-1-11
is amended to read:
107
38-1-11. Enforcement -- Time for -- Lis pendens -- Action for debt not affected --
108
Instructions and form affidavit and motion.
109
(1) As used in this section:
110
(a) "Owner" is as defined in Section
38-11-102
.
111
(b) "Residence" is as defined in Section
38-11-102
.
112
[(1)] (2) A lien claimant shall file an action to enforce the lien filed under this chapter
113
within 180 days from the day on which the lien claimant filed a notice of claim under Section
114
38-1-7
.
115
[(2)] (3) (a) Within the time period provided for filing in Subsection [(1)] (2) the lien
116
claimant shall file for record with the county recorder of each county in which the lien is
117
recorded a notice of the pendency of the action, in the manner provided in actions affecting the
118
title or right to possession of real property, or the lien shall be void, except as to persons who
119
have been made parties to the action and persons having actual knowledge of the
120
commencement of the action.
121
(b) The burden of proof [shall be] is upon the lien claimant and those claiming under
122
the lien claimant to show actual knowledge under Subsection (3)(a).
123
[(3)] (4) (a) A lien filed under this chapter is automatically and immediately void if an
124
action to enforce the lien is not filed within the time required by this section [
38-1-11
].
125
(b) Notwithstanding Section
78-12-40
, a court has no subject matter jurisdiction to
126
adjudicate a lien that becomes void under Subsection [(3)] (4)(a).
127
[(4)] (5) This section may not be interpreted to impair or affect the right of any person
128
to whom a debt may be due for any work done or materials furnished to maintain a personal
129
action to recover the [same] debt.
130
[(5)] (6) (a) If a lien claimant files an action to enforce a lien filed under this chapter
131
involving a residence[, as defined in Section
38-11-102
], the lien claimant shall include with
132
the service of the complaint on the owner of the residence:
133
(i) instructions to the owner of the residence relating to the owner's rights under Title
134
38, Chapter 11, Residence Lien Restriction and Lien Recovery Fund Act; and
135
(ii) a form [affidavit] to enable the owner of the residence to specify the grounds upon
136
which the owner may exercise available rights under Title 38, Chapter 11, Residence Lien
137
Restriction and Lien Recovery Fund Act.
138
(b) The instructions and form [affidavit] required by Subsection [(5)] (6)(a) shall meet
139
the requirements established by rule by the Division of Occupational and Professional
140
Licensing in accordance with Title 63, Chapter 46a, Utah Administrative Rulemaking Act.
141
(c) If a lien claimant fails to provide to the owner of the residence the instructions and
142
form [affidavit] required by Subsection [(5)] (6)(a), the lien claimant shall be barred from
143
maintaining or enforcing the lien upon the residence.
144
(d) Judicial determination of the rights and liabilities of the owner of the residence
145
under this chapter and Title 38, [Chapters 1 and 11] Chapter 11, Residence Lien Restriction
146
and Lien Recovery Fund Act, and Title 14, Chapter 2, Private Contracts, shall be stayed until
147
after the owner [has been] is given a reasonable period of time to establish compliance with
148
Subsections
38-11-204
(4)(a) and (4)(b) through an informal proceeding, as set forth in Title 63,
149
Chapter 46b, Administrative Procedures Act, commenced within 30 days of the owner being
150
served summons in the foreclosure action, at the Division of Occupational and Professional
151
Licensing and obtain a certificate of compliance or denial of certificate of compliance, as
152
defined in Section
38-11-102
.
153
(e) An owner applying for a certificate of compliance under Subsection [(5)] (6)(d)
154
shall send by certified mail to all lien claimants:
155
(i) a copy of the application for a certificate of compliance; and
156
(ii) all materials filed in connection with the application.
157
(f) The Division of Occupational and Professional Licensing shall notify all lien
158
claimants listed in an owner's application for a certificate of compliance under Subsection [(5)]
159
(6)(d) of the issuance or denial of a certificate of compliance.
160
[(6)] (7) The written notice requirement applies to liens filed on or after July 1, 2004.
161
Section 3.
Section
38-1-25
is amended to read:
162
38-1-25. Abuse of lien right -- Penalty.
163
(1) Any person entitled to record or file a lien under Section
38-1-3
is guilty of a class
164
B misdemeanor who intentionally causes a claim of lien against any property[, which contains]
165
containing a greater demand than the sum due to be recorded or filed:
166
(a) with the intent to cloud the title;
167
(b) to exact from the owner or person liable by means of the excessive claim of lien
168
more than is due; or
169
(c) to procure any unjustified advantage or benefit.
170
(2) In addition to any criminal penalties under Subsection (1), a person who violates
171
Subsection (1) is liable to the owner of the property or an original contractor or subcontractor
172
who is affected by the lien for the greater of:
173
(a) twice the amount by which the [wrongful] abusive lien exceeds the amount actually
174
due; or
175
(b) the actual damages incurred by the owner of the property.
176
Section 4.
Section
38-1-31
is amended to read:
177
38-1-31. Building permit -- Construction -- Notice registry -- Notice of
178
commencement of work.
179
(1) (a) (i) (A) For a construction project where a building permit is issued to an original
180
contractor or owner-builder, within 15 days after the issuance of the building permit[,]:
181
(I) the local government entity issuing that building permit shall input the building
182
permit application and transmit the building permit information to the database electronically
183
by way of the Internet or computer modem or by any other means [and such]; and
184
(II) the original contractor or owner-builder may file a notice of commencement based
185
on the building permit issued by the local government entity.
186
(B) The information [shall form] submitted under Subsection (1)(a)(i)(A) forms the
187
basis of a notice of commencement.
188
(ii) The person to whom a building permit, filed under Subsection (1)(a)(i), is issued is
189
responsible for the accuracy of the information in the building permit.
190
(iii) For the purposes of classifying a record under Title 63, Chapter 2, Government
191
Records Access and Management Act, building permit information transmitted from a local
192
governmental entity to the database shall be classified in the database by the division
193
notwithstanding the local governmental entity's classification of the building permit
194
information.
195
(b) [For a construction project where a building permit is not issued, within] Within 15
196
days after commencement of physical construction work at the project site, the original
197
contractor or owner-builder may file a notice of commencement with the database whether or
198
not a building permit is issued or a notice of commencement is filed under Subsection (1)(a).
199
(c) An owner of construction or an original contractor may file a notice of
200
commencement with the designated agent within the time prescribed by Subsections (1)(a) and
201
(b).
202
(d) (i) If duplicate notices of commencement are filed, they shall be combined into one
203
notice for each project and any notices filed relate back to the date of the earliest-filed notice of
204
commencement for the project.
205
(ii) A duplicate notice of commencement that is untimely filed relates back under
206
Subsection (1)(d)(i) if the earlier filed notice of commencement is timely filed.
207
(iii) [On January 1, 2007 and thereafter, duplicate] Duplicate notices of
208
commencement shall be automatically linked by the designated agent.
209
(e) The designated agent shall assign each construction project a unique project number
210
that:
211
(i) identifies each construction project; and
212
(ii) can be associated with all notices of commencement, preliminary notices, and
213
notices of completion.
214
(f) A notice of commencement is effective only as to any labor, service, equipment,
215
and material furnished to the construction project that is furnished subsequent to the filing of
216
the notice of commencement.
217
(2) (a) [The content of a] A notice of commencement shall include the following:
218
(i) the name and address of the owner of the project;
219
(ii) the name and address of the:
220
(A) original contractor; and
221
(B) surety providing any payment bond for the project, or if none exists, a statement
222
that a payment bond was not required for the work being performed; and
223
(iii) (A) the project address if the project can be reasonably identified by an address; or
224
(B) the name and general description of the location of the project if the project cannot
225
be reasonably identified by an address.
226
(b) A notice of commencement may include:
227
(i) a general description of the project; or
228
(ii) the lot or parcel number, and any subdivision, development, or other project name,
229
of the real property upon which the project is to be constructed if the project is subject to
230
mechanics' liens.
231
(c) [The content of a] A notice of commencement need not include all of the items
232
listed in Subsection (2)(a) if:
233
(i) a building permit is issued for the project; and
234
(ii) all items listed in Subsection (2)(a) that are available on the building permit are
235
included in the notice of commencement.
236
(3) If a notice of commencement for a construction project is not filed within the time
237
set forth in Subsections [
38-1-31
](1)(a) and (b), the following do not apply:
238
(a) Section
38-1-32
; and
239
(b) Section
38-1-33
.
240
(4) (a) Unless a person indicates to the division or designated agent that the person
241
does not wish to receive a notice under this section, electronic notice of the filing of a notice of
242
commencement or alternate notice as prescribed in Subsection (1), shall be provided to:
243
(i) all persons who have filed notices of commencement for the project; and
244
(ii) all interested persons who have requested [such notice for] notices concerning the
245
project.
246
(b) (i) A person to whom notice is required under Subsection (4)(a) is responsible for:
247
(A) providing an e-mail address, mailing address, or telefax number to which a notice
248
required by Subsection (4)(a) is to be sent; and
249
(B) the accuracy of any e-mail address, mailing address, or telefax number to which
250
notice is to be sent.
251
(ii) The designated agent fulfills the notice requirement of Subsection (4)(a) when it
252
sends the notice to the e-mail address, mailing address, or telefax number provided to the
253
designated agent whether or not the notice is actually received.
254
(5) (a) The burden is upon any person seeking to enforce a notice of commencement to
255
verify the accuracy of information in the notice of commencement and prove that the notice of
256
commencement is filed timely and meets all of the requirements in this section.
257
(b) A substantial inaccuracy in a notice of commencement renders the notice of
258
commencement unenforceable.
259
(c) A person filing a notice of commencement by alternate filing is responsible for
260
verifying and changing any incorrect information in the notice of commencement before the
261
expiration of the time period during which the notice is required to be filed.
262
(6) At the time a building permit is obtained, each original contractor shall
263
conspicuously post at the project site a copy of the building permit obtained for the project.
264
Section 5.
Section
38-1-32
is amended to read:
265
38-1-32. Preliminary notice by subcontractor.
266
(1) (a) (i) Except for a person who has a contract with an owner or an owner-builder or
267
a laborer compensated with wages, a subcontractor shall file a preliminary notice with the
268
database within the later of:
269
(A) 20 days after commencement of its own work or the commencement of furnishing
270
labor, service, equipment, and material to a construction project; or
271
(B) 20 days after the filing of a notice of commencement.
272
(ii) A preliminary notice filed within the period described in Subsection (1)(a)(i) is
273
effective as to all labor, service, equipment, and material furnished to the construction project,
274
including labor, service, equipment, and material provided to more than one contractor or
275
subcontractor.
276
(iii) (A) If more than one notice of commencement is filed for a project, a person may
277
attach a preliminary notice to any of the notices of commencement filed for the project.
278
(B) A preliminary notice attached to an untimely notice of commencement is valid if
279
there is also a valid and timely notice of commencement for the project to which the
280
preliminary notice may attach.
281
(b) If a person files a preliminary notice after the period prescribed by Subsection
282
(1)(a), the preliminary notice becomes effective five days after the day on which the
283
preliminary notice is filed.
284
(c) [Failure] Except as provided in Subsection (1)(e), failure to file a preliminary notice
285
within the period required by Subsection (1)(a) precludes a person from maintaining any claim
286
for compensation earned for performance of labor or service or supply of materials or
287
equipment furnished to the construction project before the expiration of five days after the late
288
filing of a preliminary notice, except as against the person with whom the person contracted.
289
(d) (i) (A) If a person who is required to file a preliminary notice under this chapter
290
fails to file the preliminary notice, that person may not hold a valid lien under this chapter.
291
(B) A county recorder need not verify that a valid preliminary notice is filed when a
292
person files a notice to hold and claim a lien under Section [
38-1-17
]
38-1-7
.
293
(ii) The content of a preliminary notice shall include:
294
(A) the building permit number for the project, or the number assigned to the project
295
by the designated agent;
296
(B) the name, address, and telephone number of the person furnishing the labor,
297
service, equipment, or material;
298
(C) the name and address of the person who contracted with the claimant for the
299
furnishing of the labor, service, equipment, or material;
300
(D) the name of the record or reputed owner of the project;
301
(E) the name of the original contractor under which the claimant is performing or will
302
perform its work; and
303
(F) the address of the project or a description of the location of the project.
304
(iii) Upon request by person identified in Subsection (1)(a)(i), an original contractor
305
shall provide the person with the building permit number for the project, or the number
306
assigned to the project by the designated agent.
307
(e) If a person provides labor, service, equipment, or material before the filing of a
308
notice of commencement and the notice of commencement is filed more than 15 days after the
309
day on which the person providing labor, service, equipment, or material begins work on the
310
project, the person providing labor, service, equipment, or material need not file a preliminary
311
notice to maintain the person's right to hold a lien under this chapter or any other right,
312
including a right referenced under Subsection (1)(c).
313
(2) (a) (i) Unless a person indicates to the division or designated agent that the person
314
does not wish to receive a notice under this section, electronic notification of the filing of a
315
preliminary notice or alternate notice as prescribed in Subsection (1), shall be provided to:
316
(A) the person filing the preliminary notice;
317
(B) each person that filed a notice of commencement for the project; and
318
(C) all interested persons who have requested [such notice for] notices concerning the
319
project.
320
(ii) A person to whom notice is required under Subsection (2)(a)(i) is responsible for:
321
(A) providing an e-mail address, mailing address, or telefax number to which a notice
322
required by Subsection (2)(a) is to be sent; and
323
(B) the accuracy of any e-mail address, mailing address, or telefax number to which
324
notice is to be sent.
325
(iii) The designated agent fulfills the notice requirement of Subsection (2)(a)(i) when it
326
sends the notice to the e-mail address, mailing address, or telefax number provided to the
327
designated agent whether or not the notice is actually received.
328
(b) The burden is upon the person filing the preliminary notice to prove that the person
329
has substantially complied with the requirements of this section.
330
(c) Subject to Subsection (1)(d), a person required by this section to give preliminary
331
notice is only required to give one notice for each project.
332
(d) If the labor, service, equipment, or material is furnished pursuant to contracts under
333
more than one original contract, the notice requirements must be met with respect to the labor,
334
service, equipment, or material furnished under each original contract.
335
(3) (a) If a construction project owner, original contractor, subcontractor, or other
336
interested person believes that a preliminary notice has been filed erroneously, that owner,
337
original contractor, subcontractor, or other interested person can request from the person who
338
filed the preliminary notice evidence establishing the validity of the preliminary notice.
339
(b) Within ten days after the request described in Subsection (3)(a), the person or entity
340
that filed the preliminary notice shall provide the requesting person or entity proof that the
341
preliminary notice is valid.
342
(c) If the person or entity that filed the preliminary notice does not provide proof of the
343
validity of the preliminary notice, that person or entity shall immediately cancel the preliminary
344
notice from the database in any manner prescribed by the division pursuant to rule.
345
(4) A person filing a preliminary notice by alternate filing is responsible for verifying
346
and changing any incorrect information in the preliminary notice before the expiration of the
347
time period during which the notice is required to be filed.
348
(5) Until June 1, 2008, nothing in this section affects a person's rights under Title 38,
349
Chapter 11, Residence Lien Restriction and Lien Recovery Fund Act.
350
Section 6.
Section
38-1-33
is amended to read:
351
38-1-33. Notice of completion.
352
(1) (a) [(i)] Upon final completion of a construction project:
353
[(A)] (i) an owner of a construction project or an original contractor may file a notice
354
of completion with the database; and
355
[(B)] (ii) a lender that has provided financing for the construction project, a surety that
356
has provided bonding for the construction project, or a title company issuing a title insurance
357
policy on the construction project, may file a notice of completion.
358
[(ii) Final completion, for purposes of this Subsection (1), shall mean:]
359
[(A) if as a result of work performed under the original contract a permanent certificate
360
of occupancy is required for such work, the date of issuance of a permanent certificate of
361
occupancy by the local government entity having jurisdiction over the construction project;]
362
[(B) if no certificate of occupancy is required by the local government entity having
363
jurisdiction over the construction project, but as a result of the work performed under the
364
original contract an inspection is required for such work, the date of the final inspection for
365
such work by the local government entity having jurisdiction over the construction project; or]
366
[(C) if with regard to the work performed under the original contract no certificate of
367
occupancy and no final inspection are required by the local government entity having
368
jurisdiction over the construction project, the date on which there remains no substantial work
369
to be completed to finish such work on the original contract.]
370
(b) Notwithstanding Section
38-1-2
, [where] if a subcontractor performs substantial
371
work after the applicable dates established by Subsections (1)(a)(i) and (ii), that subcontractor's
372
subcontract [shall be] is considered an original contract for the sole purpose of determining:
373
(i) the subcontractor's time frame to file a notice to hold and claim a lien under
374
Subsection
38-1-7
(1); and
375
(ii) the original contractor's time frame to file a notice to hold and claim a lien under
376
Subsection
38-1-7
(1) for that subcontractor's work.
377
[(c) For purposes of this section, the term "substantial work" does not include:]
378
[(i) repair work; or]
379
[(ii) warranty work.]
380
[(d)] (c) A notice of completion shall include:
381
(i) the building permit number for the project, or the number assigned to the project by
382
the designated agent;
383
(ii) the name, address, and telephone number of the person filing the notice of
384
completion;
385
(iii) the name of the original contractor for the project;
386
(iv) the address of the project or a description of the location of the project;
387
(v) the date on which final completion is alleged to have occurred; and
388
(vi) the method used to determine final completion.
389
[(e)] (d) [Notwithstanding Subsection (1)(a)(ii)] For purposes of this section, final
390
completion of the original contract does not occur if work remains to be completed for which
391
the owner is holding payment to ensure completion of the work.
392
[(f)] (e) (i) Unless a person indicates to the division or designated agent that the person
393
does not wish to receive a notice under this section, electronic notification of the filing of a
394
notice of completion or alternate notice as prescribed in Subsection (1)(a), shall be provided to:
395
(A) each person that filed a notice of commencement for the project;
396
(B) each person that filed preliminary notice for the project; and
397
(C) all interested persons who have requested [notice for] notices concerning the
398
project.
399
(ii) A person to whom notice is required under this Subsection (1)[(f)] (e) is
400
responsible for:
401
(A) providing an e-mail address, mailing address, or telefax number to which a notice
402
required by this Subsection (1)[(f)] (e) is to be sent; and
403
(B) the accuracy of any e-mail address, mailing address, or telefax number to which
404
notice is to be sent.
405
(iii) The designated agent fulfills the notice requirement of Subsection (1)[(f)] (e)(i)
406
when it sends the notice to the e-mail address, mailing address, or telefax number provided to
407
the designated agent, whether or not the notice is actually received.
408
(iv) Upon the filing of a notice of completion, the time periods for filing preliminary
409
notices stated in Section
38-1-27
are modified such that all preliminary notices shall be filed
410
subsequent to the notice of completion and within ten days from the day on which the notice of
411
completion is filed.
412
[(g)] (f) A subcontract that is considered an original contract for purposes of this
413
section [shall] does not create a requirement for an additional preliminary notice if a
414
preliminary notice has already been given for the labor, service, equipment, and material
415
furnished to the subcontractor who performs substantial work.
416
(2) (a) If a construction project owner, original contractor, subcontractor, or other
417
interested person believes that a notice of completion has been filed erroneously, that owner,
418
original contractor, subcontractor, or other interested person can request from the person who
419
filed the notice of completion evidence establishing the validity of the notice of completion.
420
(b) Within ten days after the request described in Subsection (2)(a), the person [that]
421
who filed the notice of completion shall provide the requesting person proof that the notice of
422
completion is valid.
423
(c) If the person that filed the notice of completion does not provide proof of the
424
validity of the notice of completion, that person shall immediately cancel the notice of
425
completion from the database in any manner prescribed by the division pursuant to rule.
426
[(3) Notwithstanding Subsection
38-1-7
(1)(a)(i), a person claiming benefits under this
427
chapter shall file for record with the county recorder of the county in which the property, or
428
some part of the property is situated, a written notice to hold and claim a lien within:]
429
[(a) 90 days after the day on which a notice of completion is filed under this section;
430
or]
431
[(b) 180 days after the day on which occurs final completion, if no notice of
432
completion is filed under this section.]
433
[(4)] (3) A person filing a notice of completion by alternate filing is responsible for
434
verifying and changing any incorrect information in the notice of completion before the
435
expiration of the time period during which the notice is required to be filed.
436
Section 7.
Section
38-11-204
is amended to read:
437
38-11-204. Claims against the fund -- Requirement to make a claim --
438
Qualifications to receive compensation -- Qualifications to receive a certificate of
439
compliance.
440
(1) To claim recovery from the fund a person shall:
441
(a) meet the requirements of either Subsection (4) or (7);
442
(b) pay an application fee determined by the division under Section
63-38-3.2
; and
443
(c) file with the division a completed application on a form provided by the division
444
accompanied by supporting documents establishing:
445
(i) that the person meets the requirements of either Subsection (4) or (7);
446
(ii) that the person was a qualified beneficiary or laborer during the construction on the
447
owner-occupied residence; and
448
(iii) the basis for the claim.
449
(2) To recover from the fund, the application required by Subsection (1) shall be filed
450
no later than one year:
451
(a) from the date the judgment required by Subsection (4)(d) is entered;
452
(b) from the date the nonpaying party filed bankruptcy, if the claimant is precluded
453
from obtaining a judgment or from satisfying the requirements of Subsection (4)(d) because the
454
nonpaying party filed bankruptcy within one year after the entry of judgment; or
455
(c) from the date the laborer, trying to recover from the fund, completed the laborer's
456
qualified services.
457
(3) To obtain a certificate of compliance an owner or agent of the owner shall establish
458
with the division that the owner meets the requirements of Subsections (4)(a) and (4)(b).
459
(4) To recover from the fund, regardless of whether the residence is occupied by the
460
owner, a subsequent owner, or the owner or subsequent owner's tenant or lessee, a qualified
461
beneficiary shall establish that:
462
(a) (i) the owner of the owner-occupied residence or the owner's agent entered into a
463
written contract with an original contractor licensed or exempt from licensure under Title 58,
464
Chapter 55, Utah Construction Trades Licensing Act:
465
(A) for the performance of qualified services;
466
(B) to obtain the performance of qualified services by others; or
467
(C) for the supervision of the performance by others of qualified services in
468
construction on that residence;
469
(ii) the owner of the owner-occupied residence or the owner's agent entered into a
470
written contract with a real estate developer for the purchase of an owner-occupied residence;
471
or
472
(iii) the owner of the owner-occupied residence or the owner's agent entered into a
473
written contract with a factory built housing retailer for the purchase of an owner-occupied
474
residence;
475
(b) the owner has paid in full the original contractor, licensed or exempt from licensure
476
under Title 58, Chapter 55, Utah Construction Trades Licensing Act, real estate developer, or
477
factory built housing retailer under Subsection (4)(a) with whom the owner has a written
478
contract in accordance with the written contract and any amendments to the contract;
479
(c) (i) the original contractor, licensed or exempt from licensure under Title 58,
480
Chapter 55, Utah Construction Trades Licensing Act, the real estate developer, or the factory
481
built housing retailer subsequently failed to pay a qualified beneficiary who is entitled to
482
payment under an agreement with that original contractor or real estate developer licensed or
483
exempt from licensure under Title 58, Chapter 55, Utah Construction Trades Licensing Act, for
484
services performed or materials supplied by the qualified beneficiary;
485
(ii) a subcontractor who contracts with the original contractor, licensed or exempt from
486
licensure under Title 58, Chapter 55, Utah Construction Trades Licensing Act, the real estate
487
developer, or the factory built housing retailer failed to pay a qualified beneficiary who is
488
entitled to payment under an agreement with that subcontractor or supplier; or
489
(iii) a subcontractor who contracts with a subcontractor or supplier failed to pay a
490
qualified beneficiary who is entitled to payment under an agreement with that subcontractor or
491
supplier;
492
(d) (i) unless precluded from doing so by the nonpaying party's bankruptcy filing
493
within the applicable time, the qualified beneficiary filed an action against the nonpaying party
494
to recover monies owed to the qualified beneficiary within the earlier of:
495
(A) 180 days from the date the qualified beneficiary filed a notice of claim under
496
Section
38-1-7
; or
497
(B) 270 days from the completion of the original contract pursuant to Subsection
498
38-1-7
(1);
499
(ii) the qualified beneficiary has obtained a judgment against the nonpaying party who
500
failed to pay the qualified beneficiary under an agreement to provide qualified services for
501
construction of that owner-occupied residence;
502
(iii) (A) the qualified beneficiary has:
503
(I) obtained from a court of competent jurisdiction the issuance of an order requiring
504
the judgment debtor, or if a corporation any officer of the corporation, to appear before the
505
court at a specified time and place to answer concerning the debtor's or corporation's property;
506
(II) received return of service of the order from a person qualified to serve documents
507
under the Utah Rules of Civil Procedure, Rule 4(b); and
508
(III) made reasonable efforts to obtain asset information from the supplemental
509
proceedings; and
510
(B) if assets subject to execution are discovered as a result of the order required under
511
Subsection (4)(d)(iii)(A) or for any other reason, to obtain the issuance of a writ of execution
512
from a court of competent jurisdiction; or
513
(iv) the qualified beneficiary timely filed a proof of claim where permitted in the
514
bankruptcy action, if the nonpaying party has filed bankruptcy;
515
(e) the qualified beneficiary is not entitled to reimbursement from any other person;
516
and
517
(f) the qualified beneficiary provided qualified services to a contractor, licensed or
518
exempt from licensure under Title 58, Chapter 55, Utah Construction Trades Licensing Act.
519
(5) The requirements of Subsections (4)(d)[(i),] (ii)[,] and (iii) need not be met if the
520
qualified beneficiary [has been precluded from obtaining a judgment against the nonpaying
521
party or from satisfying the requirements of Subsections (4)(d)(i), (ii), and (iii)] is prevented
522
from compliance because the nonpaying party [filed] files bankruptcy.
523
(6) To recover from the fund a laborer shall:
524
(a) establish that the laborer has not been paid wages due for the work performed at the
525
site of a construction on an owner-occupied residence; and
526
(b) provide any supporting documents or information required by rule by the division.
527
(7) A fee determined by the division under Section
63-38-3.2
shall be deducted from
528
any recovery from the fund received by a laborer.
529
(8) The requirements of Subsections (4)(a) and (4)(b) may be satisfied if an owner or
530
agent of the owner establishes to the satisfaction of the director that the owner of the
531
owner-occupied residence or the owner's agent entered into a written contract with an original
532
contractor who:
533
(a) was a business entity that was not licensed under Title 58, Chapter 55, Utah
534
Construction Trades Licensing Act, but was solely or partly owned by an individual who was
535
licensed under Title 58, Chapter 55, Utah Construction Trades Licensing Act; or
536
(b) was a natural person who was not licensed under Title 58, Chapter 55, Utah
537
Construction Trades Licensing Act, but who was the sole or partial owner and qualifier of a
538
business entity that was licensed under Title 58, Chapter 55, Utah Construction Trades
539
Licensing Act.
540
(9) The director shall have equitable power to determine if the requirements of
541
Subsections (4)(a) and (4)(b) have been met, but any decision by the director under this chapter
542
shall not alter or have any effect on any other decision by the division under Title 58,
543
Occupations and Professions.