S.B. 84 Enrolled
1
NET METERING PROGRAMS
2
2008 GENERAL SESSION
3
STATE OF UTAH
4
Chief Sponsor: Kevin T. VanTassell
5
House Sponsor:
Roger E. Barrus
6
7
LONG TITLE
8
General Description:
9
This bill addresses provisions allowing the net metering of electricity for an electrical
10
corporation's customers.
11
Highlighted Provisions:
12
This bill:
13
. defines terms;
14
. expands the type of eligible facilities that may qualify for a net metering program;
15
. changes the circumstances under which an electric corporation's discontinuance of a
16
net metering program is allowed;
17
. allows various decisions to be made by a governing authority instead of solely by the
18
Public Service Commission;
19
. provides methods for a governing authority's determination of the value of excess
20
customer-generated electricity;
21
. requires that a customer generation system not compromise the quality of service for
22
an electrical corporation's other customers;
23
. addresses the applicability of net metering provisions to a small electrical corporation
24
headquartered in another state; and
25
. makes technical changes.
26
Monies Appropriated in this Bill:
27
None
28
Other Special Clauses:
29
None
30
Utah Code Sections Affected:
31
AMENDS:
32
54-15-102, as enacted by Laws of Utah 2002, Chapter 6
33
54-15-103, as enacted by Laws of Utah 2002, Chapter 6
34
54-15-104, as enacted by Laws of Utah 2002, Chapter 6
35
54-15-105, as enacted by Laws of Utah 2002, Chapter 6
36
54-15-106, as last amended by Laws of Utah 2003, Chapter 131
37
ENACTS:
38
54-15-107, Utah Code Annotated 1953
39
40
Be it enacted by the Legislature of the state of Utah:
41
Section 1.
Section
54-15-102
is amended to read:
42
54-15-102. Definitions.
43
As used in this chapter:
44
(1) "Annualized billing period" means a 12-month billing cycle beginning on April 1 of
45
one year and ending on March 31 of the following year.
46
[(1)] (2) "Customer-generated electricity" means electricity that:
47
(a) is generated by a customer participating in a net metering program from a customer
48
generation system;
49
(b) exceeds the electricity the customer needs for the customer's own use; and
50
(c) is supplied to the electrical corporation administering the net metering program.
51
[(2)] (3) "Customer generation system":
52
(a) means a [fuel cell or renewable] customer-owned or customer-leased eligible
53
facility, operated by the customer, that:
54
[(a)] (i) has a generating capacity of:
55
(A) not more than 25 kilowatts for a residential facility; or
56
(B) not more than 2 megawatts for a non-residential facility, unless the governing
57
authority approves a greater generation capacity;
58
[(b)] (ii) is located on, or adjacent to, the premises of the electrical corporation's
59
customer, subject to the electrical corporation's service requirements;
60
[(c)] (iii) operates in parallel and is interconnected with the electrical corporation's
61
[transmission and] distribution facilities;
62
[(d)] (iv) is intended primarily to offset part or all of the customer's requirements for
63
electricity; and
64
[(e)] (v) is controlled by an inverter[.] or switchgear; and
65
(b) includes an electric generator and its accompanying equipment package.
66
(4) "Eligible facility" means a facility that uses energy derived from one of the following
67
to generate electricity:
68
(a) solar photovoltaic and solar thermal energy;
69
(b) wind energy;
70
(c) hydrogen;
71
(d) organic waste;
72
(e) hydroelectric energy;
73
(f) waste gas and waste heat capture or recovery;
74
(g) biomass and biomass byproducts, except for the combustion of:
75
(i) wood that has been treated with chemical preservatives such as creosote,
76
pentachlorophenol, or chromated copper arsenate; or
77
(ii) municipal waste in a solid form;
78
(h) forest or rangeland woody debris from harvesting or thinning conducted to improve
79
forest or rangeland ecological health and to reduce wildfire risk;
80
(i) agricultural residues;
81
(j) dedicated energy crops;
82
(k) landfill gas or biogas produced from organic matter, wastewater, anaerobic
83
digesters, or municipal solid waste; or
84
(l) geothermal energy.
85
(5) "Equipment package" means a group of components connecting an electric
86
generator to an electric distribution system, including all interface equipment and the interface
87
equipment's controls, switchgear, inverter, and other interface devices.
88
[(3)] (6) "Excess customer-generated electricity" means the amount of
89
customer-generated electricity in excess of the customer's consumption from the customer
90
generation system during a monthly billing period [that exceeds the amount of electricity that an
91
electrical corporation supplies to the customer during that billing period], as measured at the
92
electrical corporation's meter.
93
[(4)] (7) "Fuel cell" means a device in which the energy of a reaction between a fuel and
94
an oxidant is converted directly and continuously into electrical energy.
95
[(5)] (8) "Governing authority" means:
96
(a) for a distribution electrical cooperative, its board of directors; and
97
(b) for each other electrical corporation, the Public Service Commission.
98
[(6)] (9) "Inverter" means a device that:
99
(a) converts direct current power into alternating current power that is compatible with
100
power generated by an electrical corporation; and
101
(b) has been designed, tested, and UL certified to UL1741 and [IEEE929] installed and
102
operated in accordance with IEEE1547 standards.
103
[(7)] (10) "Net electricity" means the difference, as measured at the meter owned by the
104
electrical corporation between:
105
(a) the amount of electricity that an electrical corporation supplies to a customer
106
participating in a net metering program; and
107
(b) the amount of customer-generated electricity delivered to the electrical corporation.
108
[(8)] (11) "Net metering" means measuring the amount of net electricity for the
109
applicable billing period [the difference between:].
110
[(a) the amount of electricity that an electrical corporation supplies to a customer
111
participating in a net metering program; and]
112
[(b) the amount of customer-generated electricity.]
113
[(9)] (12) "Net metering program" means a program administered by [a] an electrical
114
corporation whereby a customer with a customer generation system may:
115
(a) generate electricity primarily for the customer's own use;
116
(b) supply customer-generated electricity to the electrical corporation; and
117
(c) if net metering results in excess customer-generated electricity during a billing
118
period, receive a credit [against the cost of electricity supplied by the electrical corporation to
119
the customer within the same calendar year] under Section
54-15-104
.
120
[(10) "Renewable facility" means a facility that uses energy derived from the sun, wind,
121
or water to generate electricity.]
122
(13) "Switchgear" means the combination of electrical disconnects, fuses, or circuit
123
breakers:
124
(a) used to:
125
(i) isolate electrical equipment; and
126
(ii) de-energize equipment to allow work to be performed or faults downstream to be
127
cleared; and
128
(b) that is:
129
(i) designed, tested, and UL certified to UL1741; and
130
(ii) installed and operated in accordance with IEEE1547 standards.
131
Section 2.
Section
54-15-103
is amended to read:
132
54-15-103. Net metering program -- Metering equipment -- Interconnection
133
agreement.
134
(1) Each electrical corporation shall:
135
(a) except as provided in Subsection (2), make a net metering program available to the
136
electrical corporation's customers; and
137
(b) allow customer generation systems to be interconnected to the electrical
138
corporation's facilities using, except as provided in Subsection [(3)] (4), a [standard]
139
kilowatt-hour meter capable of net metering.
140
(2) An electrical corporation may discontinue making a net metering program available
141
to customers not already participating in the program [as long as] if:
142
(a) the cumulative generating capacity of customer generation systems in the program
143
equals at least .1% of the electrical corporation's peak demand during [2001; and] 2007; or
144
(b) [at least half of the electricity representing the .1% figure in Subsection (2)(a) is
145
generated by renewable facilities] the electrical corporation serves fewer than 1,000 customers
146
in the state.
147
(3) (a) Notwithstanding Subsection (2)(a), the governing authority may establish a
148
higher amount of generating capacity from customer generation systems than .1% of the
149
electrical corporation's peak demand during 2007 before a net metering program may be
150
discontinued under Subsection (2).
151
(b) Before acting under Subsection (3)(a), the governing authority shall provide public
152
notice of its proposed action and an opportunity for public comment.
153
[(3)] (4) (a) Notwithstanding Subsection (1)(b), an electrical corporation may require a
154
customer participating in the electrical corporation's net metering program to use metering
155
equipment other than a standard kilowatt-hour meter if the [commission] governing authority,
156
after appropriate notice and opportunity for public comment:
157
(i) determines that the use of other metering equipment is necessary and appropriate to
158
monitor the flow of electricity from and to the electrical corporation; and
159
(ii) approves the requirement for other metering equipment, after considering the
160
benefits and costs associated with the other metering equipment.
161
(b) If the [commission] governing authority approves the requirement for other
162
metering equipment under Subsection [(3)] (4)(a), the governing authority shall determine how
163
the cost of purchasing and installing the other metering equipment is to be allocated between the
164
electrical corporation and the customer.
165
[(4)] (5) An electrical corporation may require a customer to enter into an
166
interconnection agreement before connecting the customer generation system to the electrical
167
corporation's facilities.
168
Section 3.
Section
54-15-104
is amended to read:
169
54-15-104. Charges or credits for net electricity.
170
(1) Each electrical corporation with a customer participating in a net metering program
171
shall measure net electricity during each monthly billing period, in accordance with normal
172
metering practices.
173
(2) If net metering does not result in excess customer-generated electricity during the
174
monthly billing period, the electrical corporation shall bill the customer for the net electricity, in
175
accordance with normal billing practices.
176
(3) If net metering results in excess customer-generated electricity during the monthly
177
billing period:
178
(a) (i) the electrical corporation shall credit the customer for the excess
179
customer-generated electricity based on the meter reading for the billing period at a value that is
180
at least avoided cost[;], or as determined by the governing authority; and
181
[(ii) the customer may use the credit under Subsection (3)(a)(i) to offset purchases of
182
electricity from the electrical corporation during future billing periods during the same calendar
183
year; and]
184
[(iii)] (ii) all credits that the customer does not use during the [calendar year] annualized
185
billing period expire at the end of the [calendar year] annualized billing period; and
186
(b) as authorized by the governing authority, the electrical corporation may bill the
187
customer for customer charges that otherwise would have accrued during that billing period in
188
the absence of excess customer-generated electricity.
189
Section 4.
Section
54-15-105
is amended to read:
190
54-15-105. No additional fee or charge without governing authority approval --
191
Exception.
192
(1) An electrical corporation administering a net metering program may not charge a
193
customer participating in the program an additional standby, capacity, interconnection, or other
194
fee or charge unless the governing authority, after appropriate notice and opportunity for public
195
comment:
196
(a) determines that:
197
(i) the electrical corporation will incur direct costs from the interconnection or from
198
administering the net metering program that exceed benefits, as determined by the governing
199
authority, resulting from the program; and
200
(ii) public policy is best served by imposing [the] a reasonable fee or charge on the
201
customer participating in the net metering program rather than by allocating the fee or charge
202
among the electrical corporation's entire customer base; and
203
(b) after making its determination under Subsection (1)(a), authorizes the additional
204
reasonable fee or charge.
205
(2) If a cost of a net metering program is allocated among the electrical corporation's
206
entire customer base, Subsection (1) may not be construed to prohibit an electrical corporation
207
from charging a customer participating in the net metering program for that cost to the same
208
extent that the electrical corporation charges a customer not participating in the program for
209
that cost.
210
Section 5.
Section
54-15-106
is amended to read:
211
54-15-106. Customer to provide equipment necessary to meet applicable code
212
requirements -- Governing authority may adopt additional reasonable requirements --
213
Testing and inspection of interconnection.
214
(1) Each customer participating in a net metering program shall provide at the
215
customer's expense all equipment necessary to meet applicable local and national standards
216
regarding electrical and fire safety, power quality, and interconnection requirements established
217
by the National Electrical Code, the National Electrical Safety Code, the Institute of Electrical
218
and Electronics Engineers, and Underwriters Laboratories.
219
(2) After appropriate notice and opportunity for public comment, the [commission]
220
governing authority may by rule adopt additional reasonable safety, power quality, and
221
interconnection requirements for customer generation systems that the [commission] governing
222
authority considers to be necessary to protect public safety and system reliability.
223
(3) (a) If a customer participating in a net metering program complies with
224
requirements referred to under Subsection (1) and additional requirements established under
225
Subsection (2), an electrical corporation may not require that customer to:
226
(i) perform or pay for additional tests; or
227
(ii) purchase additional liability insurance.
228
(b) An electrical corporation may not be held directly or indirectly liable for permitting
229
or continuing to permit an interconnection of a customer generation system to the electrical
230
corporation's system or for an act or omission of a customer participating in a net metering
231
program for loss, injury, or death to a third party.
232
(4) An electrical corporation may test and inspect an interconnection at times that the
233
electrical corporation considers necessary to ensure the safety of electrical workers and to
234
preserve the integrity of the electric power grid.
235
(5) The electrical function, operation, or capacity of a customer generation system, at
236
the point of connection to the electrical corporation's distribution system, may not compromise
237
the quality of service to the electrical corporation's other customers.
238
Section 6.
Section
54-15-107
is enacted to read:
239
54-15-107. Application to out-of-state electrical corporation.
240
An electrical corporation with fewer than 5,000 customers in this state that is
241
headquartered in another state is considered to be in compliance with this chapter if the
242
electrical corporation offers net metering to its customers in Utah in accordance with a tariff,
243
schedule, or other requirement of the appropriate authority in the state in which the electrical
244
corporation's headquarters are located.