Figure

Graphic file number 0 named letter~2.jpg with height 87 p and width 86 p Left aligned

UTAH STATE SENATE

UTAH STATE CAPITOL COMPLEX * 320 STATE CAPITOL

P.O. BOX 145115 * SALT LAKE CITY, UTAH 84114-5115 * (801) 538-1035

        February 18, 2009

Mr. President:

    The Government Operations and Political Subdivisions Committee reports a favorable recommendation on 1st Sub. H.B. 68, DEVELOPMENT EXACTIONS, by Representative P. Painter, with the following amendments:

1.    Page 1, Line 17 :    

             17      projected water

{   right   }        interest       requirements.


2.    Page 10, Line 275
    House Floor Amendments
    2-6-2009 :
    

             275      water authority's established calculations of projected water
{   right   }        interest       requirements.


3.    Page 10, Line 280
    House Floor Amendments
    2-6-2009 :
    

             280      authority's existing H. available .H water
{   rights   }        interests       exceed the water      {   rights   }        interests       needed to meet the


4.    Page 19, Line 558
    House Floor Amendments
    2-6-2009 :
    

             558      projected water
{   right   }        interest       requirements.


5.    Page 19, Lines 563 through 563a
    House Floor Amendments
    2-6-2009 :
    

             563      interest if the culinary water authority's existing H. available .H water
{   rights   }        interests       exceed the water

             563a     
{   rights   }        interests       needed to


        Respectfully,

        Peter C. Knudson
        Committee Chair

Voting: 4-0-3
3 HB0068.SC1.wpd rnorth/RCN RHR/JTW 2/18/09 9:59 am


Bill Number
Action Class
Action Code

*HB0068S01*
*S*
*SCRAMD*

HB0068S01
S
SCRAMD