Utah Code -- Title 73 -- Chapter 03b -- Groundwater Recharge and Recovery Act

Code in HTML Format with Links to Zipped WordPerfect

Updated: 23 July 2008

Search by keyword


Chapters in this Title | All Titles

73-3b-101    Short title.
WP Zipped -- 1,449 bytes
73-3b-102    Definitions.
WP Zipped -- 1,771 bytes
73-3b-103    Prohibitions.
WP Zipped -- 1,673 bytes
73-3b-104    Rulemaking power of state engineer.
WP Zipped -- 1,595 bytes
73-3b-105    Administrative procedures.
WP Zipped -- 1,811 bytes
73-3b-106    Water right for recharged water -- Change of use of recovered water.
WP Zipped -- 1,858 bytes
73-3b-107    Recoverable water -- State engineer to determine.
WP Zipped -- 1,579 bytes
73-3b-201    Application for a recharge permit -- Required information -- Filing fee.
WP Zipped -- 2,759 bytes
73-3b-202    Issuance of recharge permit -- Criteria -- Conditions.
WP Zipped -- 1,993 bytes
73-3b-203    Lapse of recharge permit.
WP Zipped -- 1,572 bytes
73-3b-204    Application for a recovery permit -- Required information.
WP Zipped -- 2,318 bytes
73-3b-205    Issuance of recovery permit -- Criteria -- Conditions.
WP Zipped -- 1,803 bytes
73-3b-206    Lapse of recovery permit.
WP Zipped -- 1,705 bytes
73-3b-207    Assignment of permits.
WP Zipped -- 1,694 bytes
73-3b-208    Proposed new well -- Compliance with water well construction rules.
WP Zipped -- 1,779 bytes
73-3b-301    Storage account -- Monitoring and reporting required.
WP Zipped -- 1,822 bytes
73-3b-302    Fee.
WP Zipped -- 1,823 bytes
73-3b-303    Modification of recharge or recovery permits.
WP Zipped -- 1,744 bytes
73-3b-401    Revocation or suspension of recharge and recovery permits.
WP Zipped -- 1,656 bytes
73-3b-402    Penalty.
WP Zipped -- 1,684 bytes  

[New] means this portion of the Utah Code has been modified since the last update on 1 May 2008.


Last revised: 23 July 2008

If you have questions about this site, e-mail: legisweb@utah.gov
Legislative Home Page | State Home Page