Utah Code -- Title 73 -- Chapter 03b -- Groundwater Recharge and Recovery Act
Code in HTML Format
Updated: 11 January 2012
Search by keyword
Chapters in this Title | All Titles
- 73-3b-101 Short title.
- WP Zipped -- 1,449 bytes
- 73-3b-102 Definitions.
- WP Zipped -- 2,433 bytes
- 73-3b-103 Prohibitions.
- WP Zipped -- 1,982 bytes
- 73-3b-104 Rulemaking power of state engineer.
- WP Zipped -- 1,595 bytes
- 73-3b-105 Administrative procedures.
- WP Zipped -- 1,749 bytes
- 73-3b-106 Water right for recharged water -- Change of use of recovered water.
- WP Zipped -- 2,137 bytes
- 73-3b-107 Recoverable water -- State engineer to determine.
- WP Zipped -- 1,579 bytes
- 73-3b-201 Application for a recharge permit -- Required information -- Filing fee.
- WP Zipped -- 2,898 bytes
- 73-3b-202 Issuance of recharge permit -- Criteria -- Conditions.
- WP Zipped -- 2,374 bytes
- 73-3b-203 Proof of completion, certification, or lapse of recharge permit.
- WP Zipped -- 3,296 bytes
- 73-3b-204 Application for a recovery permit -- Required information.
- WP Zipped -- 2,616 bytes
- 73-3b-205 Issuance of recovery permit -- Criteria -- Conditions.
- WP Zipped -- 2,206 bytes
- 73-3b-206 Proof of completion, certification, or lapse of recovery permit.
- WP Zipped -- 3,043 bytes
- 73-3b-207 Assignment of permits.
- WP Zipped -- 1,694 bytes
- 73-3b-208 Proposed new well -- Compliance with water well construction rules.
- WP Zipped -- 1,783 bytes
- 73-3b-301 Storage account -- Monitoring and reporting required.
- WP Zipped -- 1,822 bytes
- 73-3b-302 Fee.
- WP Zipped -- 1,722 bytes
- 73-3b-303 Modification of recharge or recovery permits.
- WP Zipped -- 1,744 bytes
- 73-3b-401 Revocation or suspension of recharge and recovery permits.
- WP Zipped -- 1,656 bytes
- 73-3b-402 Penalty.
- WP Zipped -- 1,684 bytes
means this portion of the Utah Code has been modified since the last update on 1 November 2011.
Last revised: 11 January 2012