73-3-16. Proof of appropriation or permanent change -- Notice -- Manner of proof
-- Statements -- Maps, profiles, and drawings -- Verification -- Waiver of filing -- Statement
in lieu of proof of appropriation or change.
(1) Sixty days before the date set for the proof of appropriation or proof of change to be
made, the state engineer shall notify the applicant by mail when proof of completion of the works
and application of the water to a beneficial use will be due.
(2) On or before the date set for completing the proof in accordance with the application,
the applicant shall file proof with the state engineer on forms furnished by the state engineer.
(3) Except as provided in Subsection (4), the applicant shall submit the following
information:
(a) a description of the works constructed;
(b) the quantity of water in acre-feet or the flow in second-feet diverted, or both;
(c) the method of applying the water to beneficial use; and
(d) (i) detailed measurements of water put to beneficial use;
(ii) the date the measurements were made; and
(iii) the name of the person making the measurements.
(4) (a) On applications filed for appropriation or permanent change of use of water to
provide a water supply for state projects constructed pursuant to Title 73, Chapter 10, Board of
Water Resources - Division of Water Resources, or for federal projects constructed by the United
States Bureau of Reclamation for the use and benefit of the state, any of its agencies, its political
subdivisions, public and quasi-municipal corporations, or water users' associations of which the
state, its agencies, political subdivisions, or public and quasi-municipal corporations are
stockholders, the proof shall include:
(i) a statement indicating construction of the project works has been completed;
(ii) a description of the major features with appropriate maps, profiles, drawings, and
reservoir area-capacity curves;
(iii) a description of the point or points of diversion and rediversion;
(iv) project operation data;
(v) a map showing the place of use of water and a statement of the purpose and method
of use;
(vi) the project plan for beneficial use of water under the applications and the quantity of
water required; and
(vii) a statement indicating what type of measuring devices have been installed.
(b) The director of the Division of Water Resources shall sign proofs for the state
projects and an authorized official of the Bureau of Reclamation shall sign proofs for the federal
projects specified in Subsection (4)(a).
(5) The proof on all applications shall be sworn to by the applicant or the applicant's
appointed representative and proof engineer.
(6) (a) Except as provided in Subsection (6)(b), when filing proof, the applicant shall
submit maps, profiles, and drawings made by a Utah licensed land surveyor or Utah licensed
professional engineer that show:
(i) the location of the completed works;
(ii) the nature and extent of the completed works;
(iii) the natural stream or source from which and the point where the water is diverted
and, in the case of a nonconsumptive use, the point where the water is returned; and
(iv) the place of use.
(b) The state engineer may waive the filing of maps, profiles, and drawings if in the state
engineer's opinion the written proof adequately describes the works and the nature and extent of
beneficial use.
(7) The completed proof shall conform to rules and standards established by the state
engineer.
(8) In those areas in which general determination proceedings are pending, or have been
concluded, under Title 73, Chapter 4, Determination of Water Rights, the state engineer may
petition the district court for permission to:
(a) waive the requirements of this section and Section 73-3-17; and
(b) permit each owner of an application to file a verified statement to the effect that the
applicant has completed the appropriation or change and elects to file a statement of water users
claim in the proposed determination of water rights or any supplement to it in accordance with
Title 73, Chapter 4, Determination of Water Rights, in lieu of proof of appropriation or proof of
change.
(9) This section does not apply to an instream flow water right authorized by Section
73-3-30.
Amended by Chapter 311, 2008 General Session
Download Code Section Zipped WordPerfect 73_03_001600.ZIP 3,771 Bytes
Sections in this Chapter|Chapters in this Title|All Titles|Legislative Home Page
Last revised: Thursday, May 28, 2009