Water and Irrigation
Dam Safety
Section 203
Review of plans.
     73-5a-203.   Review of plans.
     (1) The state engineer shall establish a formal written procedure for the review of plans submitted pursuant to Section 73-5a-202. Plans shall be reviewed according to:
     (a) design criteria which the state engineer shall specify in rules; and
     (b) data or criteria generally accepted by the general dam design community.
     (2) Upon review of the plans, the state engineer will:
     (a) approve them with appropriate conditions;
     (b) reject them; or
     (c) return them for correction.
     (3) The state engineer shall document each review indicating:
     (a) how the plans were reviewed; and
     (b) his evaluation of the plans.

Enacted by Chapter 319, 1990 General Session
Download Code Section Zipped WordPerfect 73_05a020300.ZIP 1,911 Bytes