<chapter number="19-5"><sunset repsec="63I-1-219" repdate="7/1/2029" /><catchline>Water Quality Act</catchline><section number="19-5-102"><histories><history>Amended by Chapter <modchap sess="2020GS">256</modchap>, 2020 General Session</history><modyear>2020</modyear></histories><catchline>Definitions.</catchline><tab/>As used in this chapter:<subsection number="19-5-102(1)">
"Agriculture discharge":
<subsection number="19-5-102(1)(a)">
means the release of agriculture water from the property of a farm, ranch, or feed lot that:<subsection number="19-5-102(1)(a)(i)">
pollutes a surface body of water, including a stream, lake, pond, marshland, watercourse, waterway, river, ditch, and other water conveyance system of the state;</subsection><subsection number="19-5-102(1)(a)(ii)">
pollutes the ground water of the state; or</subsection><subsection number="19-5-102(1)(a)(iii)">
constitutes a significant nuisance on urban land; and</subsection></subsection><subsection number="19-5-102(1)(b)">
does not include:<subsection number="19-5-102(1)(b)(i)">
runoff from a farm, ranch, or feed lot or return flows from irrigated fields onto land that is not part of a body of water; or</subsection><subsection number="19-5-102(1)(b)(ii)">
a release into a normally dry water conveyance, unless the release reaches the water of a lake, pond, stream, marshland, river, or other active body of a water.</subsection></subsection></subsection><subsection number="19-5-102(2)">
"Agriculture water" means:
<subsection number="19-5-102(2)(a)">
water used by a farmer, rancher, or feed lot for the production of food, fiber, or fuel;</subsection><subsection number="19-5-102(2)(b)">
return flows from irrigated agriculture; and</subsection><subsection number="19-5-102(2)(c)">
agricultural storm water runoff.</subsection></subsection><subsection number="19-5-102(3)">
"Board" means the Water Quality Board created in Section <xref depth="3" refnumber="19-1-106" start="0">19-1-106</xref>.</subsection><subsection number="19-5-102(4)">
"Commission" means the Conservation Commission, created in Section <xref depth="3" refnumber="4-18-104" start="0">4-18-104</xref>.</subsection><subsection number="19-5-102(5)">
"Contaminant" means a physical, chemical, biological, or radiological substance or matter in water.</subsection><subsection number="19-5-102(6)">
"Director" means the director of the Division of Water Quality or, for purposes of groundwater quality at a facility licensed by and under the jurisdiction of the Division of  Waste Management and Radiation Control, the director of the Division of Waste Management and Radiation Control.</subsection><subsection number="19-5-102(7)">
"Discharge" means the addition of a pollutant to waters of the state.</subsection><subsection number="19-5-102(8)">
"Discharge permit" means a permit issued to a person who:
<subsection number="19-5-102(8)(a)">
discharges or whose activities would probably result in a discharge of pollutants into the waters of the state; or</subsection><subsection number="19-5-102(8)(b)">
generates or manages sewage sludge.</subsection></subsection><subsection number="19-5-102(9)">
"Disposal system" means a system for disposing of wastes and includes sewerage systems and treatment works.</subsection><subsection number="19-5-102(10)">
"Division" means the Division of Water Quality, created in Subsection <xref depth="4" refnumber="19-1-105(1)(e)" start="0">19-1-105(1)(e)</xref>.</subsection><subsection number="19-5-102(11)">
"Effluent limitations" means restrictions, requirements, or prohibitions, including schedules of compliance established under this chapter, that apply to discharges.</subsection><subsection number="19-5-102(12)">
"Point source":
<subsection number="19-5-102(12)(a)">
means discernible, confined, and discrete conveyance, including a pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, from which pollutants are or may be discharged; and</subsection><subsection number="19-5-102(12)(b)">
does not include return flows from irrigated agriculture.</subsection></subsection><subsection number="19-5-102(13)">
"Pollution" means a man-made or man-induced alteration of the chemical, physical, biological, or radiological integrity of waters of the state, unless the alteration is necessary for the public health and safety.</subsection><subsection number="19-5-102(14)">
"Publicly owned treatment works" means a facility for the treatment of pollutants owned by the state, its political subdivisions, or other public entity.</subsection><subsection number="19-5-102(15)">
"Schedule of compliance" means a schedule of remedial measures, including an enforceable sequence of actions or operations leading to compliance with this chapter.</subsection><subsection number="19-5-102(16)">
"Sewage sludge" means solid, semisolid, or liquid residue removed during the treatment of municipal wastewater or domestic sewage.</subsection><subsection number="19-5-102(17)">
"Sewerage system" means pipelines or conduits, pumping stations, and other constructions, devices, appurtenances, and facilities used for collecting or conducting wastes to a point of ultimate disposal.</subsection><subsection number="19-5-102(18)">
"Total maximum daily load" means a calculation of the maximum amount of a pollutant that a body of water can receive and still meet water quality standards.</subsection><subsection number="19-5-102(19)">
"Treatment works" means a plant, disposal field, lagoon, dam, pumping station, incinerator, or other works used for the purpose of treating, stabilizing, or holding wastes.</subsection><subsection number="19-5-102(20)">
"Underground injection" means the subsurface emplacement of fluids by well injection.</subsection><subsection number="19-5-102(21)">
"Underground wastewater disposal system" means a system for underground disposal of domestic wastewater discharges as defined by the board and the executive director.</subsection><subsection number="19-5-102(22)">
"Waste" or "pollutant" means dredged spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, and industrial, municipal, and agricultural waste discharged into water.</subsection><subsection number="19-5-102(23)">
"Waters of the state":
<subsection number="19-5-102(23)(a)">
means streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, irrigation systems, drainage systems, and all other bodies or accumulations of water, surface and underground, natural or artificial, public or private, that are contained within, flow through, or border upon this state or any portion of the state; and</subsection><subsection number="19-5-102(23)(b)">
does not include bodies of water confined to and retained within the limits of private property, and that do not develop into or constitute a nuisance, a public health hazard, or a menace to fish or wildlife.</subsection></subsection></section><section number="19-5-103"><histories><history>Amended by Chapter <modchap sess="2025GS">57</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Water Quality Board -- Members of board -- Appointment -- Terms -- Organization -- Meetings -- Per diem and expenses.</catchline><subsection number="19-5-103(1)">The board consists of the following nine members:<subsection number="19-5-103(1)(a)">the following non-voting member, except that the member may vote to break a tie vote between the voting members:<subsection number="19-5-103(1)(a)(i)">the executive director; or</subsection><subsection number="19-5-103(1)(a)(ii)">an employee of the department designated by the executive director; and</subsection></subsection><subsection number="19-5-103(1)(b)">the following eight voting members, who shall be appointed or reappointed by the governor with the advice and consent of the Senate in accordance with Title 63G, Chapter 24, Part 2, Vacancies:<subsection number="19-5-103(1)(b)(i)">one representative who:<subsection number="19-5-103(1)(b)(i)(A)">is an expert and has relevant training and experience in water quality matters;</subsection><subsection number="19-5-103(1)(b)(i)(B)">is a Utah-licensed physician, a Utah-licensed professional engineer, or a scientist with relevant training and experience; and</subsection><subsection number="19-5-103(1)(b)(i)(C)">represents local and special service districts in the state;</subsection></subsection><subsection number="19-5-103(1)(b)(ii)">two government representatives who do not represent the federal government;</subsection><subsection number="19-5-103(1)(b)(iii)">one representative from the mineral industry;</subsection><subsection number="19-5-103(1)(b)(iv)">one representative from the manufacturing industry;</subsection><subsection number="19-5-103(1)(b)(v)">one representative who represents agricultural and livestock interests;</subsection><subsection number="19-5-103(1)(b)(vi)">one representative from the public who represents:<subsection number="19-5-103(1)(b)(vi)(A)">an environmental nongovernmental organization; or</subsection><subsection number="19-5-103(1)(b)(vi)(B)">a nongovernmental organization that represents community interests and does not represent industry interests; and</subsection></subsection><subsection number="19-5-103(1)(b)(vii)">one representative from the public who is trained and experienced in public health.</subsection></subsection></subsection><subsection number="19-5-103(2)">A member of the board shall:<subsection number="19-5-103(2)(a)">be knowledgeable about water quality matters, as evidenced by a professional degree, a professional accreditation, or documented experience;</subsection><subsection number="19-5-103(2)(b)">be a resident of Utah;</subsection><subsection number="19-5-103(2)(c)">attend board meetings in accordance with the attendance rules made by the department under Subsection <xref depth="4" refnumber="19-1-201(1)(d)(i)(A)">19-1-201(1)(d)(i)(A)</xref>; and</subsection><subsection number="19-5-103(2)(d)">comply with all applicable statutes, rules, and policies, including the conflict of interest rules made by the department under Subsection <xref depth="4" refnumber="19-1-201(1)(d)(i)(B)">19-1-201(1)(d)(i)(B)</xref> and the conflict of interest provisions described in Title 63G, Chapter 24, Part 3, Conflicts of Interest.</subsection></subsection><subsection number="19-5-103(3)">When a vacancy occurs in the membership for any reason, the governor shall, with the advice and consent of the Senate in accordance with Title 63G, Chapter 24, Part 2, Vacancies, appoint a replacement for the unexpired term.</subsection><subsection number="19-5-103(4)"><subsection number="19-5-103(4)(a)">A member shall be appointed for a term of four years and is eligible for reappointment.</subsection><subsection number="19-5-103(4)(b)">Notwithstanding the requirements of Subsection (4)(a), the governor shall, at the time of appointment or reappointment, adjust the length of terms to ensure that the terms of board members are staggered so that half of the appointed board is appointed every two years.</subsection></subsection><subsection number="19-5-103(5)">A member shall hold office until the expiration of the member's term and until the member's successor is appointed, not to exceed 90 days after the formal expiration of the term.</subsection><subsection number="19-5-103(6)">The board shall:<subsection number="19-5-103(6)(a)">organize and annually select one of its members as chair and one of its members as vice chair;</subsection><subsection number="19-5-103(6)(b)">hold at least four regular meetings each calendar year; and</subsection><subsection number="19-5-103(6)(c)">keep minutes of its proceedings which are open to the public for inspection.</subsection></subsection><subsection number="19-5-103(7)">The chair may call a special meeting upon the request of three or more members of the board.</subsection><subsection number="19-5-103(8)">Each member of the board and the director shall be notified of the time and place of each meeting.</subsection><subsection number="19-5-103(9)">Five members of the board constitute a quorum for the transaction of business, and the action of a majority of members present is the action of the board.</subsection><subsection number="19-5-103(10)">A member may not receive compensation or benefits for the member's service, but may receive per diem and travel expenses in accordance with:<subsection number="19-5-103(10)(a)">Section <xref depth="3" refnumber="63A-3-106">63A-3-106</xref>;</subsection><subsection number="19-5-103(10)(b)">Section <xref depth="3" refnumber="63A-3-107">63A-3-107</xref>; and</subsection><subsection number="19-5-103(10)(c)">rules made by the Division of Finance pursuant to Sections <xref depth="3" refnumber="63A-3-106">63A-3-106</xref> and <xref depth="3" refnumber="63A-3-107">63A-3-107</xref>.</subsection></subsection></section><section number="19-5-104"><histories><history>Amended by Chapter <modchap sess="2025GS">107</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Powers and duties of board.</catchline><subsection number="19-5-104(1)">In accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, the board may make rules that:<subsection number="19-5-104(1)(a)">taking into account Subsection <xref depth="4" refnumber="19-5-104(6)" start="0">(6)</xref>:<subsection number="19-5-104(1)(a)(i)">implement the awarding of construction loans to political subdivisions and municipal authorities under Section <xref depth="3" refnumber="11-8-2" start="0">11-8-2</xref>, including:<subsection number="19-5-104(1)(a)(i)(A)">requirements pertaining to applications for a loan;</subsection><subsection number="19-5-104(1)(a)(i)(B)">requirements for determination of an eligible project;</subsection><subsection number="19-5-104(1)(a)(i)(C)">requirements for determination of the costs upon which a loan is based, which costs may include engineering, financial, legal, and administrative expenses necessary for the construction, reconstruction, and improvement of a sewage treatment plant, including a major interceptor, collection system, or other facility appurtenant to the plant;</subsection><subsection number="19-5-104(1)(a)(i)(D)">a priority schedule for awarding loans, in which the board may consider, in addition to water pollution control needs, any financial needs relevant, including per capita cost, in making a determination of priority; and</subsection><subsection number="19-5-104(1)(a)(i)(E)">requirements for determination of the amount of the loan;</subsection></subsection><subsection number="19-5-104(1)(a)(ii)">implement the awarding of loans for nonpoint source projects pursuant to Section <xref depth="3" refnumber="73-10c-4.5" start="0">73-10c-4.5</xref>;</subsection><subsection number="19-5-104(1)(a)(iii)">set effluent limitations and standards subject to Section <xref depth="3" refnumber="19-5-116" start="0">19-5-116</xref>;</subsection><subsection number="19-5-104(1)(a)(iv)">implement or effectuate the powers and duties of the board; and</subsection><subsection number="19-5-104(1)(a)(v)">protect the public health for the design, construction, operation, and maintenance of underground wastewater disposal systems, liquid scavenger operations, and vault and earthen pit privies;</subsection></subsection><subsection number="19-5-104(1)(b)">govern inspection, monitoring, recordkeeping, and reporting requirements for underground injections and require permits for underground injections, to protect drinking water sources, except for wells, pits, and ponds covered by Section <xref depth="3" refnumber="40-6-5" start="0">40-6-5</xref> regarding gas and oil, recognizing that underground injection endangers drinking water sources if:<subsection number="19-5-104(1)(b)(i)">injection may result in the presence of a contaminant in underground water that supplies or can reasonably be expected to supply a public water system, as defined in Section <xref depth="3" refnumber="19-4-102" start="0">19-4-102</xref>; and</subsection><subsection number="19-5-104(1)(b)(ii)">the presence of the contaminant may:<subsection number="19-5-104(1)(b)(ii)(A)">result in the public water system not complying with any national primary drinking water standards; or</subsection><subsection number="19-5-104(1)(b)(ii)(B)">otherwise adversely affect the health of persons;</subsection></subsection></subsection><subsection number="19-5-104(1)(c)">govern sewage sludge management, including permitting, inspecting, monitoring, recordkeeping, and reporting requirements; and</subsection><subsection number="19-5-104(1)(d)">notwithstanding Section <xref depth="3" refnumber="19-4-112" start="0">19-4-112</xref>, govern design and construction of irrigation systems that:<subsection number="19-5-104(1)(d)(i)">convey sewage treatment facility effluent of human origin in pipelines under pressure, unless contained in surface pipes wholly on private property and for agricultural purposes; and</subsection><subsection number="19-5-104(1)(d)(ii)">are constructed after May 4, 1998.</subsection></subsection></subsection><subsection number="19-5-104(2)"><subsection number="19-5-104(2)(a)">In accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, the board shall adopt and enforce rules and establish fees to cover the costs of:<subsection number="19-5-104(2)(a)(i)">managing the certification and testing program; and</subsection><subsection number="19-5-104(2)(a)(ii)">testing for certification of operators of treatment works and sewerage systems operated by political subdivisions.</subsection></subsection><subsection number="19-5-104(2)(b)">In establishing certification rules under Subsection <xref depth="4" refnumber="19-5-104(2)(a)" start="0">(2)(a)</xref>, the board shall:<subsection number="19-5-104(2)(b)(i)">base the requirements for certification on the size, treatment process type, and complexity of the treatment works and sewerage systems operated by political subdivisions;</subsection><subsection number="19-5-104(2)(b)(ii)">allow operators until three years after the date of adoption of the rules to obtain initial certification;</subsection><subsection number="19-5-104(2)(b)(iii)">allow a new operator one year from the date the operator is hired by a treatment plant or sewerage system or three years after the date of adoption of the rules, whichever occurs later, to obtain certification;</subsection><subsection number="19-5-104(2)(b)(iv)">issue certification upon application and without testing, at a grade level comparable to the grade of current certification to operators who are currently certified under the voluntary certification plan for wastewater works operators as recognized by the board; and</subsection><subsection number="19-5-104(2)(b)(v)">issue a certification upon application and without testing that is valid only at the treatment works or sewerage system where that operator is currently employed if the operator:<subsection number="19-5-104(2)(b)(v)(A)">is in charge of and responsible for the treatment works or sewerage system on March 16, 1991;</subsection><subsection number="19-5-104(2)(b)(v)(B)">has been employed at least 10 years in the operation of that treatment works or sewerage system before March 16, 1991; and</subsection><subsection number="19-5-104(2)(b)(v)(C)">demonstrates to the board the operator's capability to operate the treatment works or sewerage system at which the operator is currently employed by providing employment history and references as required by the board.</subsection></subsection></subsection></subsection><subsection number="19-5-104(3)">The board shall:<subsection number="19-5-104(3)(a)">develop programs for the prevention, control, and abatement of new or existing pollution of the waters of the state;</subsection><subsection number="19-5-104(3)(b)">adopt, modify, or repeal standards of quality of the waters of the state and classify those waters according to their reasonable uses in the interest of the public under conditions the board may prescribe for the prevention, control, and abatement of pollution;</subsection><subsection number="19-5-104(3)(c)">give reasonable consideration in the exercise of its powers and duties to the economic impact of water pollution control on industry and agriculture;</subsection><subsection number="19-5-104(3)(d)">meet the requirements of federal law related to water pollution;</subsection><subsection number="19-5-104(3)(e)">establish and conduct a continuing planning process for control of water pollution, including the specification and implementation of maximum daily loads of pollutants;</subsection><subsection number="19-5-104(3)(f)"><subsection number="19-5-104(3)(f)(i)">review total daily maximum load reports and recommendations for water quality end points and implementation strategies developed by the division before submission of the report, recommendation, or implementation strategy to the EPA;</subsection><subsection number="19-5-104(3)(f)(ii)">disapprove, approve, or approve with conditions the staff total daily maximum load recommendations; and</subsection><subsection number="19-5-104(3)(f)(iii)">provide suggestions for further consideration to the Division of Water Quality in the event a total daily maximum load strategy is rejected; </subsection></subsection><subsection number="19-5-104(3)(g)">to ensure compliance with applicable statutes and regulations:<subsection number="19-5-104(3)(g)(i)">review a settlement negotiated by the director under Subsection <xref depth="4" refnumber="19-5-106(2)(k)" start="0">19-5-106(2)(k)</xref> that requires a civil penalty of $25,000 or more; and</subsection><subsection number="19-5-104(3)(g)(ii)">approve or disapprove the settlement described in Subsection <xref depth="4" refnumber="19-5-104(3)(g)(i)" start="0">(3)(g)(i)</xref>; and</subsection></subsection><subsection number="19-5-104(3)(h)">to ensure a prompt and fair settlement under Subsection <xref tempid="997" depth="4" refnumber="19-5-106(2)(k)">19-5-106(2)(k)</xref>:<subsection number="19-5-104(3)(h)(i)">review an ongoing penalty negotiation between the director and a publicly-owned alleged violator of a provision under this chapter if:<subsection number="19-5-104(3)(h)(i)(A)">the director's proposed penalty exceeds $25,000;</subsection><subsection number="19-5-104(3)(h)(i)(B)">the alleged violator requests in writing that the board review the penalty negotiation;</subsection><subsection number="19-5-104(3)(h)(i)(C)">the director and the alleged violator do not dispute the violations alleged by the director; and</subsection><subsection number="19-5-104(3)(h)(i)(D)">the director and the alleged violator are unable to agree on a penalty amount; and</subsection></subsection><subsection number="19-5-104(3)(h)(ii)">upon receiving a written request for board review that meets the requirements described in Subsection <xref tempid="443" depth="4" refnumber="19-5-104(3)(h)(i)">(3)(h)(i)</xref>:<subsection number="19-5-104(3)(h)(ii)(A)">assign no more than four board members to conduct a mediated settlement conference with the director and the alleged violator;</subsection><subsection number="19-5-104(3)(h)(ii)(B)">schedule a settlement conference for no sooner than 45 days and no later than 90 days after the day on which the written request is received;</subsection><subsection number="19-5-104(3)(h)(ii)(C)">recommend a reasonable penalty amount no later than 30 days after the settlement conference; and</subsection><subsection number="19-5-104(3)(h)(ii)(D)">inform the alleged violator that the director may commence a civil proceeding to assess penalties if necessary to prevent the running of a statute of limitation described in Sections <xref depth="3" refnumber="19-1-305">19-1-305</xref> and <xref depth="3" refnumber="78B-2-307.5">78B-2-307.5</xref>.</subsection></subsection></subsection></subsection><subsection number="19-5-104(4)">The board may:<subsection number="19-5-104(4)(a)">order the director to issue, modify, or revoke an order:<subsection number="19-5-104(4)(a)(i)">prohibiting or abating discharges;</subsection><subsection number="19-5-104(4)(a)(ii)"><subsection number="19-5-104(4)(a)(ii)(A)">requiring the construction of new treatment works or any parts of the new treatment works;</subsection><subsection number="19-5-104(4)(a)(ii)(B)">requiring the modification, extension, or alteration of existing treatment works as specified by board rule or any parts of existing treatment works; or</subsection><subsection number="19-5-104(4)(a)(ii)(C)">the adoption of other remedial measures to prevent, control, or abate pollution;</subsection></subsection><subsection number="19-5-104(4)(a)(iii)">setting standards of water quality, classifying waters or evidencing any other determination by the board under this chapter; or</subsection><subsection number="19-5-104(4)(a)(iv)">requiring compliance with this chapter and with rules made under this chapter;</subsection></subsection><subsection number="19-5-104(4)(b)">advise, consult, and cooperate with another agency of the state, the federal government, another state, an interstate agency, an affected group, an affected political subdivision, or affected industry to further the purposes of this chapter; or</subsection><subsection number="19-5-104(4)(c)">delegate the authority to issue an operating permit to a local health department.</subsection></subsection><subsection number="19-5-104(5)">In performing the duties listed in Subsections <xref depth="4" refnumber="19-5-104(1)" start="0">(1)</xref> through <xref depth="4" refnumber="19-5-104(4)" start="0">(4)</xref>, the board shall give priority to pollution that results in a hazard to the public health.</subsection><subsection number="19-5-104(6)">The board shall take into consideration the availability of federal grants:<subsection number="19-5-104(6)(a)">in determining eligible project costs; and</subsection><subsection number="19-5-104(6)(b)">in establishing priorities pursuant to Subsection <xref depth="4" refnumber="19-5-104(1)(a)(i)" start="0">(1)(a)(i)</xref>.</subsection></subsection><subsection number="19-5-104(7)">The board may not issue, amend, renew, modify, revoke, or terminate any of the following that are subject to the authority granted to the director under Section <xref depth="3" refnumber="19-5-106" start="0">19-5-106</xref>:<subsection number="19-5-104(7)(a)">a permit;</subsection><subsection number="19-5-104(7)(b)">a license;</subsection><subsection number="19-5-104(7)(c)">a registration;</subsection><subsection number="19-5-104(7)(d)">a certification; or</subsection><subsection number="19-5-104(7)(e)">another administrative authorization made by the director.</subsection></subsection><subsection number="19-5-104(8)">A board member may not speak or act for the board unless the board member is authorized by a majority of a quorum of the board in a vote taken at a meeting of the board.</subsection></section><section number="19-5-104.5"><histories><history>Amended by Chapter <modchap sess="2026GS">484</modchap>, 2026 General Session</history><modyear>2026</modyear></histories><catchline>Legislative review and approval.</catchline><subsection number="19-5-104.5(1)">Before sending a total maximum daily load and implementation strategy to the EPA for review and approval, the Water Quality Board shall submit the total maximum daily load:<subsection number="19-5-104.5(1)(a)">for review to the Natural Resources, Agriculture, and Environment Interim Committee if the total maximum daily load will require a public or private expenditure in excess of $10,000,000 but less than $100,000,000 for compliance; or</subsection><subsection number="19-5-104.5(1)(b)">for approval to the Legislature if the total maximum daily load will require a public or private expenditure of $100,000,000 or more.</subsection></subsection><subsection number="19-5-104.5(2)"><subsection number="19-5-104.5(2)(a)">As used in this Subsection <xref depth="4" refnumber="19-5-104.5(2)">(2)</xref>:<subsection number="19-5-104.5(2)(a)(i)">"Expenditure" means the act of expending funds:<subsection number="19-5-104.5(2)(a)(i)(A)">by an individual public facility with a Utah Pollutant Discharge Elimination System permit, or by a group of private agricultural facilities; and</subsection><subsection number="19-5-104.5(2)(a)(i)(B)">through an initial capital investment, or through operational costs over a three-year period.</subsection></subsection><subsection number="19-5-104.5(2)(a)(ii)">"Utah Pollutant Discharge Elimination System" means the state permit system created in accordance with 33 U.S.C. Sec. 1342.</subsection></subsection><subsection number="19-5-104.5(2)(b)">Before the board adopts a nitrogen or phosphorus rule or standard, the board shall submit the rule or standard as directed in Subsections <xref depth="4" refnumber="19-5-104.5(2)(c)">(2)(c)</xref> and <xref depth="4" refnumber="19-5-104.5(d)">(d)</xref>.</subsection><subsection number="19-5-104.5(2)(c)"><subsection number="19-5-104.5(2)(c)(i)">If compliance with the rule or standard requires an expenditure in excess of $250,000, but less than $10,000,000, the board shall submit the rule or standard for review to the Natural Resources, Agriculture, and Environment Interim Committee.</subsection><subsection number="19-5-104.5(2)(c)(ii)"><subsection number="19-5-104.5(2)(c)(ii)(A)">Except as provided in Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(ii)(b)">(2)(c)(ii)(B)</xref>, the Natural Resources, Agriculture, and Environment Interim Committee shall review a rule or standard the board submits under Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(i)">(2)(c)(i)</xref> during the Natural Resources, Agriculture, and Environment Interim Committee's committee meeting immediately following the day on which the board submits the rule or standard.</subsection><subsection number="19-5-104.5(2)(c)(ii)(B)">If the committee meeting described in Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(ii)(a)">(2)(c)(ii)(A)</xref> is within five days after the day on which the board submits the rule or standard for review, the Natural Resources, Agriculture, and Environment Interim Committee shall review the rule or standard during the committee meeting described in Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(ii)(a)">(2)(c)(ii)(A)</xref> or during the committee meeting immediately following the committee meeting described in Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(ii)(a)">(2)(c)(ii)(A)</xref>.</subsection></subsection></subsection><subsection number="19-5-104.5(2)(d)">If compliance with the rule or standard requires an expenditure of $10,000,000 or more, the board shall submit the rule or standard for approval to the Legislature.</subsection><subsection number="19-5-104.5(2)(e)"><subsection number="19-5-104.5(2)(e)(i)">A facility shall estimate the cost of compliance with a board-proposed rule or standard described in Subsection <xref depth="4" refnumber="19-5-104.5(2)(b)">(2)(b)</xref> using:<subsection number="19-5-104.5(2)(e)(i)(A)">an independent, licensed engineer; and</subsection><subsection number="19-5-104.5(2)(e)(i)(B)">industry-accepted project cost estimate methods.</subsection></subsection><subsection number="19-5-104.5(2)(e)(ii)">The board may evaluate and report on a compliance estimate described in Subsection <xref depth="4" refnumber="19-5-104.5(2)(e)(i)">(2)(e)(i)</xref>.</subsection></subsection><subsection number="19-5-104.5(2)(f)">If there is a discrepancy in the estimated cost to comply with a rule or standard, the Office of the Legislative Fiscal Analyst shall determine the estimated cost to comply with the rule or standard.</subsection></subsection><subsection number="19-5-104.5(3)">In reviewing a rule or standard, the Natural Resources, Agriculture, and Environment Interim Committee may:<subsection number="19-5-104.5(3)(a)">consider the impact of the rule or standard on:<subsection number="19-5-104.5(3)(a)(i)">economic costs and benefit;</subsection><subsection number="19-5-104.5(3)(a)(ii)">public health; and</subsection><subsection number="19-5-104.5(3)(a)(iii)">the environment;</subsection></subsection><subsection number="19-5-104.5(3)(b)">suggest additional areas of consideration; or</subsection><subsection number="19-5-104.5(3)(c)">recommend the rule or standard to the board for:<subsection number="19-5-104.5(3)(c)(i)">adoption; or</subsection><subsection number="19-5-104.5(3)(c)(ii)">re-evaluation followed by further review by the Natural Resources, Agriculture, and Environment Interim Committee.</subsection></subsection></subsection><subsection number="19-5-104.5(4)">When the Natural Resources, Agriculture, and Environment Interim Committee sets the review of a rule or standard submitted under Subsection <xref depth="4" refnumber="19-5-104.5(2)(c)(i)">(2)(c)(i)</xref> as an agenda item, the committee shall:<subsection number="19-5-104.5(4)(a)">before the review, directly inform the chairs of the General Oversight Committee of the coming review, including the date, time, and place of the review; and</subsection><subsection number="19-5-104.5(4)(b)">after the review, directly inform the chairs of the General Oversight Committee of the outcome of the review, including any recommendation.</subsection></subsection></section><section number="19-5-105"><histories><history>Amended by Chapter <modchap sess="2025GS">158</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Rulemaking authority and procedure.</catchline><subsection number="19-5-105(1)"><subsection number="19-5-105(1)(a)">Except as provided in Subsections (2) and (3), no rule that the board makes for the purpose of the state administering a program under the federal Clean Water Act or the federal Safe Drinking Water Act may be more stringent than the corresponding federal regulations. </subsection><subsection number="19-5-105(1)(b)">In making rules, the board may incorporate by reference corresponding federal regulations.</subsection><subsection number="19-5-105(1)(c)">Any rule of the board is subject to Section <xref depth="3" refnumber="63G-3-502">63G-3-502</xref>.</subsection></subsection><subsection number="19-5-105(2)"><subsection number="19-5-105(2)(a)">The board may make rules more stringent than corresponding federal regulations for the purpose described in Subsection (1), only if the board makes a written finding after public comment and hearing and based on evidence in the record that the corresponding federal regulations are not adequate to protect public health and the environment of the state. </subsection><subsection number="19-5-105(2)(b)">Except as described in Subsection <xref tempid="1053" depth="4" refnumber="19-5-105(4)">(4)</xref>, a municipal system authority may not make requirements for permits that are more stringent than corresponding federal regulations for the purpose described in Subsection (1), unless the municipal system authority makes a written finding after public comment and hearing and based on evidence in the record that the corresponding federal regulations are not adequate to protect public health and the environment of the state.</subsection><subsection number="19-5-105(2)(c)">The board or a municipal system authority that makes a written finding described in Subsection (2)(a) or (2)(b) shall include a finding referring to and evaluating the public health and environmental information and studies contained in the record that forms the basis for the board's or municipal system authority's finding described in Subsection <xref refnumber="19-5-105(2)(a)" depth="4">(2)(a)</xref> or (2)(b).</subsection></subsection><subsection number="19-5-105(3)">The board may make rules related to agriculture water more stringent than the corresponding federal regulations if the commission approves the rules being more stringent than the corresponding federal regulations.</subsection><subsection number="19-5-105(4)">The Department of Transportation may make requirements more stringent than corresponding federal regulations when acting under a consent decree related to the administration of the Federal Water Pollution Control Act, 33 U.S.C.  Sec. 1251, et seq.</subsection></section><section number="19-5-105.3"><histories><history>Enacted by Chapter <modchap sess="2016GS">340</modchap>, 2016 General Session</history><modyear>2016</modyear></histories><catchline>Independent peer review of a proposal.</catchline><subsection number="19-5-105.3(1)">
As used in this section:
<subsection number="19-5-105.3(1)(a)">
"Challenging party" means a person who has or is seeking a permit in accordance with this chapter and chooses to use the independent peer review process described in this section to challenge a proposal.</subsection><subsection number="19-5-105.3(1)(b)">
"Independent peer review" is a review conducted:<subsection number="19-5-105.3(1)(b)(i)">
in accordance with this section;</subsection><subsection number="19-5-105.3(1)(b)(ii)">
by experts having technical expertise in the proposal being reviewed; and</subsection><subsection number="19-5-105.3(1)(b)(iii)">
by individuals who are not:
<subsection number="19-5-105.3(1)(b)(iii)(A)">
currently conducting research funded by the division or the challenging party;</subsection><subsection number="19-5-105.3(1)(b)(iii)(B)">
employed by an entity that is regulated under this chapter;</subsection><subsection number="19-5-105.3(1)(b)(iii)(C)">
a spouse or family member of someone who is employed by the division or the challenging party; or</subsection><subsection number="19-5-105.3(1)(b)(iii)(D)">
an active, participatory member of a non-profit organization that advocates positions with the division or the Legislature.</subsection></subsection></subsection><subsection number="19-5-105.3(1)(c)">
"Proposal" means any science-based initiative proposed by the division on or after January 1, 2016, that would financially impact a challenging party and that would:<subsection number="19-5-105.3(1)(c)(i)">
change water quality standards;</subsection><subsection number="19-5-105.3(1)(c)(ii)">
develop or modify total maximum daily load requirements;</subsection><subsection number="19-5-105.3(1)(c)(iii)">
modify wasteloads or other regulatory requirements for permits; or</subsection><subsection number="19-5-105.3(1)(c)(iv)">
change rules or other regulatory guidance.</subsection></subsection><subsection number="19-5-105.3(1)(d)">
"Study" means a written analysis conducted by or otherwise relied upon by the division in support of a proposal.</subsection><subsection number="19-5-105.3(1)(e)">
"Technology based nutrient effluent limits" are maximum nutrient limitations based on the availability of technology to achieve the limitations, rather than on a water quality standard or a total maximum daily load standard.</subsection></subsection><subsection number="19-5-105.3(2)">
The director shall initiate an independent peer review when the following conditions are met:
<subsection number="19-5-105.3(2)(a)">
a challenging party challenges in writing a study or the technical or scientific data upon which a proposal is based and requests an independent peer review;</subsection><subsection number="19-5-105.3(2)(b)">
if the independent peer review is related to examining a technology based nutrient effluent limit, the challenging party provides written notice to the division requesting an independent peer review before the technology based nutrient effluent limit is adopted into a permit issued by the division;</subsection><subsection number="19-5-105.3(2)(c)">
if the independent peer review is not related to examining a technology based nutrient effluent limit, the challenging party provides written notice to the division requesting an independent peer review related to a proposal before the proposal has been adopted by the division or the board;</subsection><subsection number="19-5-105.3(2)(d)">
the challenging party agrees to provide the funding to pay for the independent peer review; and</subsection><subsection number="19-5-105.3(2)(e)">
the challenging party would be substantially impacted by the adoption of the proposal.</subsection></subsection><subsection number="19-5-105.3(3)">
The director shall ensure that the independent peer review is completed within one year from the date the peer review panel described in Subsection <xref depth="4" refnumber="19-5-105.3(5)" start="0">(5)</xref> is selected.</subsection><subsection number="19-5-105.3(4)"><subsection number="19-5-105.3(4)(a)">
If there is more than one challenging party challenging a study or the technical or scientific data upon which a proposal is based, the challenges will be consolidated into one independent peer review.</subsection><subsection number="19-5-105.3(4)(b)">
If challenges are consolidated into one independent peer review, the challenging parties will be responsible for allocating the costs of the independent peer review among the challenging parties.</subsection></subsection><subsection number="19-5-105.3(5)"><subsection number="19-5-105.3(5)(a)">
When an independent peer review is conducted, there shall be appointed to a peer review panel a minimum of three independent experts who are mutually agreeable to both the division and the challenging party.</subsection><subsection number="19-5-105.3(5)(b)">
Any additional independent experts appointed to the panel shall be mutually agreeable to both the division and the challenging party.</subsection><subsection number="19-5-105.3(5)(c)">
If an independent peer review panel has not been appointed within 60 days of the day on which the director receives a written request for an independent peer review, a three-person panel shall be selected as follows:<subsection number="19-5-105.3(5)(c)(i)">
one independent expert selected by the division;</subsection><subsection number="19-5-105.3(5)(c)(ii)">
one independent expert selected by the challenging party or, if more than one challenge has been consolidated as described in Subsection <xref depth="4" refnumber="19-5-105.3(4)" start="0">(4)</xref>, one independent expert selected and mutually agreed to by the challenging parties; and</subsection><subsection number="19-5-105.3(5)(c)(iii)">
one independent expert mutually agreeable to the independent experts described in Subsections <xref depth="4" refnumber="19-5-105.3(5)(c)(i)" start="0">(5)(c)(i)</xref> and <xref depth="4" refnumber="19-5-105.3(5)(c)(ii)" start="0">(ii)</xref>.</subsection></subsection></subsection><subsection number="19-5-105.3(6)"><subsection number="19-5-105.3(6)(a)">
An independent peer review panel shall conduct its review in general accordance with the guidance contained in the United States Environmental Protection Agency's Peer Review Handbook.</subsection><subsection number="19-5-105.3(6)(b)">
As part of an independent peer review, the independent peer review panel shall allow for written public comment on the proposal being reviewed prior to issuing a written report.</subsection></subsection><subsection number="19-5-105.3(7)">
An independent peer review panel shall prepare a final written report that:
<subsection number="19-5-105.3(7)(a)">
includes the findings of each member of the panel;</subsection><subsection number="19-5-105.3(7)(b)">
is supported by the majority of the panel;</subsection><subsection number="19-5-105.3(7)(c)">
includes an analysis of the panel's confidence, certainty, and major data gaps, if any, related to the scientific basis behind the proposal; and</subsection><subsection number="19-5-105.3(7)(d)">
includes one of the following findings:<subsection number="19-5-105.3(7)(d)(i)">
the proposal is scientifically defensible;</subsection><subsection number="19-5-105.3(7)(d)(ii)">
the proposal is not scientifically defensible; or</subsection><subsection number="19-5-105.3(7)(d)(iii)">
the proposal is scientifically defensible with conditions developed by the panel.</subsection></subsection></subsection><subsection number="19-5-105.3(8)">
In addition to the requirements described in Subsection <xref depth="4" refnumber="19-5-105.3(7)" start="0">(7)</xref>, if an independent peer review panel is examining a technology based nutrient effluent limit for a specified downstream water body or a series of hydrologically connected water bodies, the panel's written report shall find one of the following:
<subsection number="19-5-105.3(8)(a)">
the technology based nutrient effluent limit is scientifically necessary to protect the designated beneficial uses of the specified downstream water body or the series of hydrologically connected water bodies; or</subsection><subsection number="19-5-105.3(8)(b)">
the technology based nutrient effluent limit is not scientifically necessary to protect the designated beneficial uses of the specified downstream water body or the series of hydrologically connected water bodies.</subsection></subsection><subsection number="19-5-105.3(9)">
The findings and any conditions of an independent peer review panel shall be incorporated into a proposal as needed to ensure the scientific accuracy of the proposal.</subsection><subsection number="19-5-105.3(10)">
A proposal reviewed by an independent peer review panel that is found scientifically defensible or scientifically defensible with conditions may be forwarded to the board or to the director for further consideration and action as applicable.</subsection><subsection number="19-5-105.3(11)">
If technology based nutrient effluent limits in a proposal are found by an independent peer review to not be scientifically necessary to protect a specified downstream water body or series of hydrologically connected water bodies, the challenging party shall be granted a variance by the division exempting compliance with the technology based effluent limitation.</subsection></section><section number="19-5-105.5"><histories><history>Amended by Chapter <modchap sess="2020GS">256</modchap>, 2020 General Session</history><modyear>2020</modyear></histories><catchline>Agriculture water.</catchline><subsection number="19-5-105.5(1)"><subsection number="19-5-105.5(1)(a)">
The board shall draft any rules relating to agriculture water in cooperation with the commission.</subsection><subsection number="19-5-105.5(1)(b)">
The commission shall advise the board before the board may adopt a rule relating to agriculture water.</subsection></subsection><subsection number="19-5-105.5(2)">
A program or rule adopted by the board for agriculture production or irrigation water shall:
<subsection number="19-5-105.5(2)(a)">
be consistent with the federal Clean Water Act; and</subsection><subsection number="19-5-105.5(2)(b)">
if possible, be developed in a voluntary cooperative program with the agriculture producer associations and the commission.</subsection></subsection><subsection number="19-5-105.5(3)"><subsection number="19-5-105.5(3)(a)">
The board's authority to regulate a discharge is subject to Subsection <xref depth="4" refnumber="19-5-105.5(3)(b)" start="0">(3)(b)</xref> relating to an agriculture discharge.</subsection><subsection number="19-5-105.5(3)(b)"><subsection number="19-5-105.5(3)(b)(i)">
A person responsible for an agriculture discharge shall mitigate the resulting damage in a reasonable manner, as approved by the director after consulting with the commission chair.</subsection><subsection number="19-5-105.5(3)(b)(ii)">
A penalty imposed on an agriculture discharge shall be consistent with the penalty policy described in Section <xref depth="3" refnumber="19-5-115" start="0">19-5-115</xref> and associated rules, as determined by the director in consultation with the commission chair.</subsection><subsection number="19-5-105.5(3)(b)(iii)">
An agriculture producer may not be held liable for an agriculture discharge resulting from a large weather event if the agriculture producer has taken reasonable measures, as the board defines by rule, to prevent an agriculture discharge.</subsection></subsection></subsection></section><section number="19-5-106"><histories><history>Amended by Chapter <modchap sess="2025GS">107</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Director -- Appointment -- Duties.</catchline><subsection number="19-5-106(1)">The executive director shall appoint the director.  The director shall serve under the administrative direction of the executive director.</subsection><subsection number="19-5-106(2)">The director shall:<subsection number="19-5-106(2)(a)">develop programs for the prevention, control, and abatement of new or existing pollution of the waters of the state;</subsection><subsection number="19-5-106(2)(b)">advise, consult, and cooperate with other agencies of the state, the federal government, other states and interstate agencies, and with affected groups, political subdivisions, and industries in furtherance of the purposes of this chapter;</subsection><subsection number="19-5-106(2)(c)">develop programs for the management of sewage sludge;</subsection><subsection number="19-5-106(2)(d)">subject to the provisions of this chapter, enforce rules made by the board through the issuance of orders, which orders may include:<subsection number="19-5-106(2)(d)(i)">prohibiting or abating discharges of wastes into the waters of the state;</subsection><subsection number="19-5-106(2)(d)(ii)">requiring the construction of new control facilities or any parts of them or the modification, extension, or alteration of existing control facilities or any parts of them, or the adoption of other remedial measures to prevent, control, or abate water pollution; or</subsection><subsection number="19-5-106(2)(d)(iii)">prohibiting any other violation of this chapter or rules made under this chapter;</subsection></subsection><subsection number="19-5-106(2)(e)">review plans, specifications, or other data relative to pollution control systems or any part of the systems provided for in this chapter;</subsection><subsection number="19-5-106(2)(f)">issue construction or operating permits for the installation or modification of treatment works or any parts of the treatment works;</subsection><subsection number="19-5-106(2)(g)">after public notice and opportunity for public hearing, issue, continue in effect, renew, revoke, modify, or deny discharge permits under reasonable conditions the board may prescribe to:<subsection number="19-5-106(2)(g)(i)">control the management of sewage sludge; or</subsection><subsection number="19-5-106(2)(g)(ii)">prevent or control the discharge of pollutants, including effluent limitations for the discharge of wastes into the waters of the state;</subsection></subsection><subsection number="19-5-106(2)(h)">meet the requirements of federal law related to water pollution;</subsection><subsection number="19-5-106(2)(i)">under the direction of the executive director, represent the state in all matters pertaining to water pollution, including interstate compacts and other similar agreements;</subsection><subsection number="19-5-106(2)(j)">collect and disseminate information relating to water pollution and the prevention, control, and abatement of water pollution;</subsection><subsection number="19-5-106(2)(k)">subject to Subsections <xref depth="4" refnumber="19-5-104(3)(g)" start="0">19-5-104(3)(g)</xref> and (h), settle or compromise any civil action initiated by the division to compel compliance with this chapter or the rules made under this chapter; and</subsection><subsection number="19-5-106(2)(l)"><subsection number="19-5-106(2)(l)(i)">approve, approve in part, approve with conditions, or deny, in writing, an application for water reuse under <xref depth="1" refnumber="73-3c" start="0">Title 73, Chapter 3c, Wastewater Reuse Act</xref>; and</subsection><subsection number="19-5-106(2)(l)(ii)">issue an operating permit for water reuse under <xref depth="1" refnumber="73-3c" start="0">Title 73, Chapter 3c, Wastewater Reuse Act</xref>.</subsection></subsection></subsection><subsection number="19-5-106(3)">The director may:<subsection number="19-5-106(3)(a)">employ full-time employees as necessary to carry out the provisions of this chapter;</subsection><subsection number="19-5-106(3)(b)">subject to the provisions of this chapter, authorize any employee or representative of the department to enter, at reasonable times and upon reasonable notice, in or upon public or private property for the purposes of inspecting and investigating conditions and plant records concerning possible water pollution;</subsection><subsection number="19-5-106(3)(c)">encourage, participate in, or conduct studies, investigations, research, and demonstrations relating to water pollution and causes of water pollution as necessary for the discharge of duties assigned under this chapter, including the establishment of inventories of pollution sources;</subsection><subsection number="19-5-106(3)(d)">collect and disseminate information relating to water pollution and the prevention, control, and abatement of water pollution;</subsection><subsection number="19-5-106(3)(e)">subject to the provisions of this chapter, exercise all incidental powers necessary to carry out the purposes of this chapter, including certification to any state or federal authorities for tax purposes only if the construction, installation, or acquisition of any facility, land, building, machinery, equipment, or any part of them conforms with this chapter;</subsection><subsection number="19-5-106(3)(f)">cooperate with any person in studies and research regarding water pollution and its control, abatement, and prevention;</subsection><subsection number="19-5-106(3)(g)">encourage, participate in, or conduct studies, investigations, research, and demonstrations relating to water pollution and causes of water pollution; or</subsection><subsection number="19-5-106(3)(h)">as authorized by the board and subject to the provisions of this chapter, act as executive secretary of the board under the direction of the chairman of the board.</subsection></subsection></section><section number="19-5-107"><histories><history>Amended by Chapter <modchap sess="2018GS">281</modchap>, 2018 General Session</history><modyear>2018</modyear></histories><catchline>Discharge of pollutants unlawful -- Discharge permit required.</catchline><subsection number="19-5-107(1)"><subsection number="19-5-107(1)(a)">
Except as provided in this chapter or rules made under it, it is unlawful for any person to discharge a pollutant into waters of the state or to cause pollution which constitutes a menace to public health and welfare, or is harmful to wildlife, fish, or aquatic life, or impairs domestic, agricultural, industrial, recreational, or other beneficial uses of water, or to place or cause to be placed any waste in a location where there is probable cause to believe it will cause pollution.</subsection><subsection number="19-5-107(1)(b)">
For purposes of injunctive relief, any violation of this subsection is a public nuisance.</subsection></subsection><subsection number="19-5-107(2)"><subsection number="19-5-107(2)(a)">
A person may not generate, store, treat, process, use, transport, dispose, or otherwise manage sewage sludge, except in compliance with this chapter and rules made under it.</subsection><subsection number="19-5-107(2)(b)">
For purposes of injunctive relief, any violation of this subsection is a public nuisance.</subsection></subsection><subsection number="19-5-107(3)">
It is unlawful for any person, without first securing a permit from the director, to:
<subsection number="19-5-107(3)(a)">
make any discharge or manage sewage sludge not authorized under an existing valid discharge permit; or</subsection><subsection number="19-5-107(3)(b)">
construct, install, modify, or operate any treatment works or part of any treatment works or any extension or addition to any treatment works, or construct, install, or operate any establishment or extension or modification of or addition to any treatment works, the operation of which would probably result in a discharge.</subsection></subsection></section><section number="19-5-108"><histories><history>Amended by Chapter <modchap sess="2020GS">99</modchap>, 2020 General Session</history><modyear>2020</modyear><history>Amended by Chapter <modchap sess="2020GS">256</modchap>, 2020 General Session</history><modyear>2020</modyear></histories><catchline>Discharge permits -- Requirements and procedure for issuance.</catchline><subsection number="19-5-108(1)">
The board may make rules, in accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, for and require the submission of plans, specifications, and other information to the director in connection with the issuance of discharge permits.</subsection><subsection number="19-5-108(2)">
A discharge permit shall have a fixed term not exceeding five years.  Upon expiration of a discharge permit, a new permit, the permit may be renewed or may be issued by the director as authorized by the board after notice and an opportunity for public hearing and upon condition that the applicant meets or will meet the applicable requirements of this chapter, including the conditions of a permit granted by the board.</subsection><subsection number="19-5-108(3)">
The board may require notice to the director of the introduction of pollutants into publicly-owned treatment works and identification to the director of the character and volume of any pollutant of any significant source subject to pretreatment standards under  Subsection 307(b) of the federal Clean Water Act.  The director shall provide in the permit for compliance with pretreatment standards.</subsection><subsection number="19-5-108(4)">
The director may impose as conditions in permits for the discharge of pollutants from publicly-owned treatment works appropriate measures to establish and ensure compliance by industrial users with any system of user charges required under this chapter or the rules adopted under this chapter.</subsection><subsection number="19-5-108(5)">
The director may apply and enforce against industrial users of publicly-owned treatment works, toxic effluent standards and pretreatment standards for the introduction into the treatment works of pollutants that interfere with, pass through, or otherwise are incompatible with the treatment works.</subsection><subsection number="19-5-108(6)">
The board shall make rules, in accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, establishing requirements for the permitting of storm water discharges into waters of the state.</subsection><subsection number="19-5-108(7)">
The director shall administer storm water permits to be consistent with rules established by the board.</subsection></section><section number="19-5-108.3"><histories><history>Amended by Chapter <modchap sess="2025GS">158</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Construction site storm water runoff control.</catchline><subsection number="19-5-108.3(1)">As used in this section:<subsection number="19-5-108.3(1)(a)"><subsection number="19-5-108.3(1)(a)(i)">"Applicant" means a person that applies for an authorization to discharge under a construction storm water permit to conduct or propose to conduct a use of land for a construction site.</subsection><subsection number="19-5-108.3(1)(a)(ii)">"Applicant" includes a person granted an authorization to discharge under a construction storm water permit once the authorization has been granted.</subsection></subsection><subsection number="19-5-108.3(1)(b)">"Application" means a construction storm water permit application.</subsection><subsection number="19-5-108.3(1)(c)">"Authority" means the Division of Water Quality or a municipal system authority.</subsection><subsection number="19-5-108.3(1)(d)">"Best management practice" means the methods, measures, or practices in compliance with 40 C.F.R. Part 450.</subsection><subsection number="19-5-108.3(1)(e)">"Construction storm water permit" means a permit required for soil disturbances where the construction activity causes a soil disturbance of:<subsection number="19-5-108.3(1)(e)(i)">an acre or more; or</subsection><subsection number="19-5-108.3(1)(e)(ii)">less than an acre if the application is part of a common plan of development or sale.</subsection></subsection><subsection number="19-5-108.3(1)(f)">"Electronic site inspection" means geo-located and time-stamped photographs the applicant takes, evaluates, and submits electronically to the authority.</subsection><subsection number="19-5-108.3(1)(g)">"Immediate threat" means contaminants are entering a river, a stream, or a lake.</subsection><subsection number="19-5-108.3(1)(h)">"Imminent threat" means contaminants are anticipated to be discharged into a river, a stream, or a lake within 48 hours.</subsection><subsection number="19-5-108.3(1)(i)">"Municipal system authority" means the entity that is responsible for the oversight of the municipal system.</subsection><subsection number="19-5-108.3(1)(j)">"Municipal system" means a municipal separate storm sewer system described in 40 C.F.R. Sec. 122.26.</subsection><subsection number="19-5-108.3(1)(k)">"Oversight inspection" means a construction site inspection performed by the authority to impose compliance with the permit.</subsection><subsection number="19-5-108.3(1)(l)">"Permit" means a construction storm water permit.</subsection><subsection number="19-5-108.3(1)(m)">"Prevention plan" means the storm water pollution prevention plan described in 40 C.F.R. Sec. 122.26.</subsection><subsection number="19-5-108.3(1)(n)">"Program" means a program described in Subsection <xref tempid="919" depth="4" refnumber="19-5-104(3)(a)">19-5-104(3)(a)</xref>.</subsection><subsection number="19-5-108.3(1)(o)"><subsection number="19-5-108.3(1)(o)(i)">"State transportation project" means a state project on public land to construct, reconstruct, replace, improve, maintain, or preserve transportation infrastructure.</subsection><subsection number="19-5-108.3(1)(o)(ii)">"State transportation project" includes:<subsection number="19-5-108.3(1)(o)(ii)(A)">a highway; or</subsection><subsection number="19-5-108.3(1)(o)(ii)(B)">a public transit facility.</subsection></subsection></subsection></subsection><subsection number="19-5-108.3(2)">The authority may not make or enforce a rule, an ordinance, or a policy regarding the municipal system, more stringent than the corresponding federal regulations under the federal Clean Water Act, unless expressly permitted by state statute.</subsection><subsection number="19-5-108.3(3)"><subsection number="19-5-108.3(3)(a)">Each authority shall determine the authority's preferred best management practices.</subsection><subsection number="19-5-108.3(3)(b)">Each authority shall publish the authority's preferred best management practices on the authority's website.</subsection></subsection><subsection number="19-5-108.3(4)">Each authority shall:<subsection number="19-5-108.3(4)(a)">maintain a list of requirements that make a complete application for a prevention plan approval; and</subsection><subsection number="19-5-108.3(4)(b)">publish the list described in Subsection (4)(a) on the authority's website.</subsection></subsection><subsection number="19-5-108.3(5)">Except as described in Section <xref depth="3" refnumber="19-5-105">19-5-105</xref>, the list of requirements described in Subsection (4)(a) may not exceed the application requirements of 40 C.F.R. Part 122, Subpart B.</subsection><subsection number="19-5-108.3(6)"><subsection number="19-5-108.3(6)(a)">To apply for a prevention plan approval with a municipal system authority, an applicant shall submit to the municipal system authority a prevention plan for review.</subsection><subsection number="19-5-108.3(6)(b)">A municipal system authority has 14 business days after the day on which an applicant submits a prevention plan to review the prevention plan for compliance with local ordinances, state law, and federal law.</subsection><subsection number="19-5-108.3(6)(c)">A municipal system authority may request more information, or modification to the prevention plan, if the request:<subsection number="19-5-108.3(6)(c)(i)">for more information, lists specifically why the prevention plan is noncompliant; and</subsection><subsection number="19-5-108.3(6)(c)(ii)">for modification:<subsection number="19-5-108.3(6)(c)(ii)(A)">includes citations to the permit requirements, local ordinances, state law, or federal law that require the modification to the prevention plan; and</subsection><subsection number="19-5-108.3(6)(c)(ii)(B)">is logged in an index of requested modification.</subsection></subsection></subsection><subsection number="19-5-108.3(6)(d)">The municipal system authority has five business days after the day on which the applicant submits the information or modification described in Subsection (6)(b) to complete the review of the prevention plan.</subsection><subsection number="19-5-108.3(6)(e)">Once the review of the prevention plan is complete, the municipal system authority shall notify the applicant, in writing, whether the authorization to discharge is granted.</subsection></subsection><subsection number="19-5-108.3(7)"><subsection number="19-5-108.3(7)(a)">The authority:<subsection number="19-5-108.3(7)(a)(i)">shall notify the applicant, in writing, of a specific violation;</subsection><subsection number="19-5-108.3(7)(a)(ii)">shall provide the applicant a reasonable time of at least one business day to correct the specific violation; and</subsection><subsection number="19-5-108.3(7)(a)(iii)">may perform an inspection to verify that the applicant corrects the specific violation.</subsection></subsection><subsection number="19-5-108.3(7)(b)">If an applicant does not correct the specific violation described in Subsection (7)(a)(i) within the timeline set under Subsection (7)(a)(ii), the authority:<subsection number="19-5-108.3(7)(b)(i)">shall issue a written warning, that the applicant has not corrected the specific violation;</subsection><subsection number="19-5-108.3(7)(b)(ii)">may impose a fine if the applicant does not correct the specific violation within no less than an additional one business day; and</subsection><subsection number="19-5-108.3(7)(b)(iii)">may perform an inspection to verify that the applicant corrected the specific violation.</subsection></subsection><subsection number="19-5-108.3(7)(c)">If an applicant does not correct the specific violation for which the applicant received notice in accordance with Subsection (7)(a)(i) within the timeline set under Subsection (7)(b), the authority:<subsection number="19-5-108.3(7)(c)(i)">shall notify the applicant, in writing, that the applicant has not corrected the specific violation; and</subsection><subsection number="19-5-108.3(7)(c)(ii)">may impose an administrative fine for each occurrence as follows:<subsection number="19-5-108.3(7)(c)(ii)(A)">$500 per occurrence for working without an approved storm water permit;</subsection><subsection number="19-5-108.3(7)(c)(ii)(B)">$300 per occurrence for tracking mud on road;</subsection><subsection number="19-5-108.3(7)(c)(ii)(C)">$250 per occurrence for failure to clean up or report spills;</subsection><subsection number="19-5-108.3(7)(c)(ii)(D)">$100 per occurrence for failure to conduct storm water inspections;</subsection><subsection number="19-5-108.3(7)(c)(ii)(E)">$100 per occurrence for failure to maintain storm water records; and</subsection><subsection number="19-5-108.3(7)(c)(ii)(F)">$500 per site, per occurrence, for failure to use general best management practices, as determined by the authority; and</subsection></subsection><subsection number="19-5-108.3(7)(c)(iii)">may impose the administrative fine:<subsection number="19-5-108.3(7)(c)(iii)(A)">for each business day the specific violation continues beginning on the day after the day on which the authority issues the administrative fine; and</subsection><subsection number="19-5-108.3(7)(c)(iii)(B)">within 30 days after the day on which the applicant corrects the violation.</subsection></subsection></subsection><subsection number="19-5-108.3(7)(d)">The authority shall:<subsection number="19-5-108.3(7)(d)(i)">impose each fine in writing and clearly document the specific violation in the writing; and</subsection><subsection number="19-5-108.3(7)(d)(ii)">deposit collected fines into a restricted account for education and outreach under a program.</subsection></subsection><subsection number="19-5-108.3(7)(e)">Except as provided in Subsection (7)(f), the authority may not issue an order to stop construction activity for a violation if:<subsection number="19-5-108.3(7)(e)(i)">an applicant selects the preferred best management practice for the site conditions;</subsection><subsection number="19-5-108.3(7)(e)(ii)">an applicant implements and properly uses the preferred best management practices; and</subsection><subsection number="19-5-108.3(7)(e)(iii)">the violation results from a deficiency in the preferred best management practice.</subsection></subsection><subsection number="19-5-108.3(7)(f)">The authority may issue an order to stop construction if the authority has a clearly documented reason articulating an immediate threat to water quality.</subsection><subsection number="19-5-108.3(7)(g)">The authority may recoup the reasonable costs incurred to correct a specific violation the applicant refuses to correct after the enforcement process described in this Subsection (7) has been exhausted if the authority, at the time of clean up, determines there is an imminent threat of significant harm to water quality or the storm water system.</subsection><subsection number="19-5-108.3(7)(h)">An authority may not impose a fine for any reason except as provided in Subsection <xref refnumber="19-5-108.3(7)" depth="4">(7)</xref>.</subsection></subsection><subsection number="19-5-108.3(8)"><subsection number="19-5-108.3(8)(a)">Subsections <xref refnumber="19-5-108.3(3)" depth="4">(3)</xref> through (7) do not apply to the Department of Transportation.</subsection><subsection number="19-5-108.3(8)(b)">The Department of Transportation may implement financial disincentives as part of a project contract or specifications.</subsection><subsection number="19-5-108.3(8)(c)">The Department of Transportation may use financial disincentives under this Subsection (8) to offset the cost of a state transportation project.</subsection></subsection><subsection number="19-5-108.3(9)"><subsection number="19-5-108.3(9)(a)">The authority shall develop a checklist for a pre-construction prevention plan review that is consistent with the current EPA Construction General Permit.</subsection><subsection number="19-5-108.3(9)(b)">The applicant, or an applicant's designee, shall participate in the pre-construction site inspections.</subsection><subsection number="19-5-108.3(9)(c)">The authority may conduct a pre-construction site inspection in person or using an electronic site inspection tool.</subsection></subsection><subsection number="19-5-108.3(10)"><subsection number="19-5-108.3(10)(a)">The authority that owns the municipal system that accepts runoff from the construction site shall inspect the construction site.</subsection><subsection number="19-5-108.3(10)(b)">Each authority shall develop, publish, and implement standard operating procedures, forms, or similar types of documents for construction site inspections.</subsection><subsection number="19-5-108.3(10)(c)">The applicant shall allow construction site inspections by the authority.</subsection></subsection><subsection number="19-5-108.3(11)"><subsection number="19-5-108.3(11)(a)">Except as provided in Subsection (12), the authority shall conduct an oversight inspection through an electronic site inspection.</subsection><subsection number="19-5-108.3(11)(b)">Photographs submitted for electronic site inspection shall:<subsection number="19-5-108.3(11)(b)(i)">include meta data verifying the date, time, and GPS location corresponding to the construction site; and</subsection><subsection number="19-5-108.3(11)(b)(ii)">be of sufficient resolution and clarity to assess compliance with general best management practices.</subsection></subsection><subsection number="19-5-108.3(11)(c)">An applicant may opt out of the electronic site inspection and instead elect an on-site inspection.</subsection></subsection><subsection number="19-5-108.3(12)">The authority may conduct an on-site inspection if the authority: <subsection number="19-5-108.3(12)(a)">has a documented reason for justifying an on-site oversight inspection, which may include:<subsection number="19-5-108.3(12)(a)(i)">alterations of electronic photographs;</subsection><subsection number="19-5-108.3(12)(a)(ii)">failure to submit an electronic site inspection at the appropriate time; or</subsection><subsection number="19-5-108.3(12)(a)(iii)">the construction site is within one-half mile of a river, a stream, or a lake;</subsection></subsection><subsection number="19-5-108.3(12)(b)">is inspecting a state transportation project; or</subsection><subsection number="19-5-108.3(12)(c)">is inspecting a military project.</subsection></subsection><subsection number="19-5-108.3(13)">Only the authority that owns the municipal system that accepts runoff from the construction site may require post-construction maintenance agreements.</subsection></section><section number="19-5-108.5"><histories><history>Amended by Chapter <modchap sess="2024GS">438</modchap>, 2024 General Session</history><modyear>2024</modyear></histories><catchline>Storm water permits.</catchline><subsection number="19-5-108.5(1)">As used in this section:<subsection number="19-5-108.5(1)(a)">"Applicant" means a person who is conducting or proposing to conduct a use of land and who a permittee requires or allows to use low impact development.</subsection><subsection number="19-5-108.5(1)(b)">"Independent review" is a review conducted:<subsection number="19-5-108.5(1)(b)(i)">in accordance with this section; and</subsection><subsection number="19-5-108.5(1)(b)(ii)">by an engineer, or engineering firm, designated by the division as having technical expertise in the area of storm water calculations.</subsection></subsection><subsection number="19-5-108.5(1)(c)">"Low impact development" means structural or natural engineered systems located close to the source of storm water that use or mimic natural processes to encourage infiltration, evapotranspiration, or reuse of the storm water.</subsection><subsection number="19-5-108.5(1)(d)">"Permittee" means a municipality or county with a storm water permit under the Utah Pollutant Discharge Elimination System.</subsection><subsection number="19-5-108.5(1)(e)">"Storm water" means storm water runoff, snow melt runoff, and surface runoff and drainage.</subsection><subsection number="19-5-108.5(1)(f)">"Storm water permit" means a permit issued to a permittee by the division for the permittee's municipal separate storm sewer system.</subsection><subsection number="19-5-108.5(1)(g)">"Utah Pollutant Discharge Elimination System" means the state-wide program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits under this chapter.</subsection></subsection><subsection number="19-5-108.5(2)">A permittee shall reduce any requirement for an applicant to manage or control storm water runoff rates or storm water runoff volumes for flood control purposes to account for the reduction in storm water associated with approved low impact development practices.</subsection><subsection number="19-5-108.5(3)">The director shall create and maintain a list of engineers, including engineering firms, capable of providing independent review of low impact development designs and storm water calculations for use by an applicant and a permittee pursuant to an appeal described in Subsection (4).</subsection><subsection number="19-5-108.5(4)"><subsection number="19-5-108.5(4)(a)">An applicant who appeals a permittee's determination regarding post-construction retention requirements under the permittee's storm water permit may request the permittee to refer the appeal to independent review for purposes of determining the technical aspects of the appeal, including:<subsection number="19-5-108.5(4)(a)(i)">the required size of any low impact development system;</subsection><subsection number="19-5-108.5(4)(a)(ii)">the calculations of reductions in storm water runoff rates or storm water runoff volumes for flood control due to the use of low impact development; and</subsection><subsection number="19-5-108.5(4)(a)(iii)">the feasibility of constructing low impact development practices required by the permittee.</subsection></subsection><subsection number="19-5-108.5(4)(b)">If an applicant makes a request under Subsection (4)(a):<subsection number="19-5-108.5(4)(b)(i)">the permittee shall:<subsection number="19-5-108.5(4)(b)(i)(A)">select an engineer or engineering firm from the list described in Subsection (3); and</subsection><subsection number="19-5-108.5(4)(b)(i)(B)">pay one-half of the cost of the independent review.</subsection></subsection><subsection number="19-5-108.5(4)(b)(ii)">An engineer or engineering firm selected by the permittee under Subsection (4)(b)(i) may not be:<subsection number="19-5-108.5(4)(b)(ii)(A)">associated with the application that is the subject of the appeal; or</subsection><subsection number="19-5-108.5(4)(b)(ii)(B)">employed by the permittee.</subsection></subsection><subsection number="19-5-108.5(4)(b)(iii)">The applicant shall pay:<subsection number="19-5-108.5(4)(b)(iii)(A)">one-half of the cost of the independent review; and</subsection><subsection number="19-5-108.5(4)(b)(iii)(B)">the municipality's published appeal fee.</subsection></subsection></subsection></subsection></section><section number="19-5-109"><histories><history>Amended by Chapter <modchap sess="1995GS">114</modchap>, 1995 General Session</history><modyear>1995</modyear></histories><catchline>Grounds for revocation, modification, or suspension of discharge permit.</catchline><subsection number="19-5-109(1)">
Any permit issued under this chapter may be revoked, modified, or suspended in whole or in part for cause including:
<subsection number="19-5-109(1)(a)">
violation of any condition of the permit;</subsection><subsection number="19-5-109(1)(b)">
obtaining a permit by misrepresentation or failure to disclose fully all relevant facts; or</subsection><subsection number="19-5-109(1)(c)">
change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge.</subsection></subsection><subsection number="19-5-109(2)">
For purposes of Subsection <xref depth="4" refnumber="19-5-109(1)(c)" start="0">(1)(c)</xref>, "condition" does not include statutory or regulatory effluent limitations enacted or adopted during the permit term, other than for toxic pollutants.</subsection></section><section number="19-5-110"><histories><history>Amended by Chapter <modchap sess="2009GS">388</modchap>, 2009 General Session</history><modyear>2009</modyear></histories><catchline>Designation by governor of areas with quality control problems -- Classification of waters -- Adoption of standards of quality.</catchline><subsection number="19-5-110(1)">
The governor may identify and designate by boundary, or make a determination not to designate, areas within the state which, as a result of urban-industrial concentration or other factors, have substantial water quality control problems, and designate planning agencies and waste treatment management agencies for these areas.</subsection><subsection number="19-5-110(2)">
The board may group the waters of the state into classes according to their present most reasonable uses, and after public hearing, upgrade and reclassify from time to time the waters of the state to the extent that it is practical and in the public interest.</subsection><subsection number="19-5-110(3)"><subsection number="19-5-110(3)(a)">
The board may establish standards of quality for each classification consistent with most reasonable present and future uses of  the waters, and the standards may be modified or changed from time to time.</subsection><subsection number="19-5-110(3)(b)">
Prior to classifying waters, setting quality standards or modifying or repealing them the board shall conduct public hearings for the consideration, adoption, or amendment of the classifications of waters and standards of purity and quality.</subsection><subsection number="19-5-110(3)(c)">
The notice shall specify the waters concerning which a classification is sought to be made for which standards are sought to be adopted and the time, date, and place of the hearing.</subsection><subsection number="19-5-110(3)(d)">
The notice shall be:<subsection number="19-5-110(3)(d)(i)">
published:
<subsection number="19-5-110(3)(d)(i)(A)">
at least twice in a newspaper of general circulation in the area affected; and</subsection><subsection number="19-5-110(3)(d)(i)(B)">
as required in Section <xref depth="3" refnumber="45-1-101" start="0">45-1-101</xref>; and</subsection></subsection><subsection number="19-5-110(3)(d)(ii)">
mailed at least 30 days before the public hearing to the chief executive of each political subdivision of the area affected and to other persons the board has reason to believe will be affected by the classification and the setting of standards.</subsection></subsection></subsection><subsection number="19-5-110(4)"><subsection number="19-5-110(4)(a)">
The adoption of standards of quality for the waters of the state and classification of  the waters or any modification or change in classification shall be effectuated by an order of the board which shall be published:<subsection number="19-5-110(4)(a)(i)">
in a newspaper of general circulation in the area affected; and</subsection><subsection number="19-5-110(4)(a)(ii)">
as required in Section <xref depth="3" refnumber="45-1-101" start="0">45-1-101</xref>.</subsection></subsection><subsection number="19-5-110(4)(b)">
In classifying waters and setting standards of water quality, adopting rules, or making any modification or change in classification or standards, the board shall allow and announce a reasonable time, not exceeding statutory deadlines contained in the federal Clean Water Act, for persons discharging wastes into the waters of the state to comply with the classification or standards and may, after public hearing if requested by the permittee, set and revise schedules of compliance and include these schedules within the terms and conditions of permits for the discharge of pollutants.</subsection></subsection><subsection number="19-5-110(5)">
Any discharge in accord with classification or standards authorized by a permit is not pollution for the purpose of this chapter.</subsection></section><section number="19-5-111"><histories><history>Amended by Chapter <modchap sess="2025GS">158</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Notice of violations -- Hearings.</catchline><subsection number="19-5-111(1)">Whenever the director determines there are reasonable grounds to believe that there has been a violation of this chapter or any order of the director or the board, the director may give written notice to the alleged violator specifying the provisions that have been violated and the facts that constitute the violation.</subsection><subsection number="19-5-111(2)">The notice shall require that the matters complained of be corrected.</subsection><subsection number="19-5-111(3)">Except as provided in Subsection <xref tempid="807" depth="4" refnumber="19-5-111(4)">(4)</xref>, the notice may order the alleged violator to appear before an administrative law judge as provided by Section <xref depth="3" refnumber="19-1-301" start="0">19-1-301</xref> at a time and place specified in the notice and answer the charges.</subsection><subsection number="19-5-111(4)">A person that receives a notice may request an informal adjudicative proceeding to contest a notice or fine imposed in accordance with Subsection <xref depth="4" refnumber="19-5-108.3(7)(c)">19-5-108.3(7)(c)</xref>, Section <xref depth="3" refnumber="63G-4-203">63G-4-203</xref>, and procedural rules the department makes in accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act.</subsection></section><section number="19-5-112"><histories><history>Amended by Chapter <modchap sess="2012GS">360</modchap>, 2012 General Session</history><modyear>2012</modyear></histories><catchline>Hearings conducted by an administrative law judge -- Decisions on denial or revocation of permit conducted by executive director.</catchline><subsection number="19-5-112(1)">
Except as provided by Subsection <xref depth="4" refnumber="19-5-112(2)" start="0">(2)</xref>, an administrative law judge shall conduct hearings authorized by Section <xref depth="3" refnumber="19-5-111" start="0">19-5-111</xref> in accordance with Section <xref depth="3" refnumber="19-1-301" start="0">19-1-301</xref>.</subsection><subsection number="19-5-112(2)"><subsection number="19-5-112(2)(a)">
An administrative law judge shall conduct, on the executive director's behalf, a hearing regarding an appeal of a permit decision for which the state has assumed primacy under the Federal Water Pollution Control Act, 33 U.S.C. Sec. 1251 et seq.</subsection><subsection number="19-5-112(2)(b)">
The decision of the executive director is final and binding on all parties unless stayed or overturned on appeal.</subsection></subsection></section><section number="19-5-113"><histories><history>Amended by Chapter <modchap sess="2012GS">360</modchap>, 2012 General Session</history><modyear>2012</modyear></histories><catchline>Power of director to enter property for investigation -- Records and reports required of owners or operators.</catchline><subsection number="19-5-113(1)">
The director or the director's authorized representative has, after presentation of credentials, the authority to enter at reasonable times upon any private or public property for the purpose of:
<subsection number="19-5-113(1)(a)">
sampling, inspecting, or investigating matters or conditions relating to pollution or the possible pollution of any waters of the state, effluents or effluent sources, monitoring equipment, or sewage sludge; and</subsection><subsection number="19-5-113(1)(b)">
reviewing and copying records required to be maintained under this chapter.</subsection></subsection><subsection number="19-5-113(2)"><subsection number="19-5-113(2)(a)">
The board may make rules, in accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, that require a person managing sewage sludge, or the owner or operator of a disposal system, including a system discharging into publicly owned treatment works, to:<subsection number="19-5-113(2)(a)(i)">
establish and maintain reasonable records and make reports relating to the operation of the system or the management of the sewage sludge;</subsection><subsection number="19-5-113(2)(a)(ii)">
install, use, and maintain monitoring equipment or methods;</subsection><subsection number="19-5-113(2)(a)(iii)">
sample, and analyze effluents or sewage sludges; and</subsection><subsection number="19-5-113(2)(a)(iv)">
provide other information reasonably required.</subsection></subsection><subsection number="19-5-113(2)(b)">
The records, reports, and information shall be available to the public except as provided in Subsection <xref depth="4" refnumber="19-1-306(2)" start="0">19-1-306(2)</xref> or Subsections <xref depth="4" refnumber="63G-2-305(1)" start="0">63G-2-305(1)</xref> and <xref depth="4" refnumber="63G-2-305(2)" start="0">(2)</xref>, Government Records Access and Management Act, as appropriate, for other than effluent information.</subsection></subsection></section><section number="19-5-114"><histories><history>Amended by Chapter <modchap sess="2012GS">360</modchap>, 2012 General Session</history><modyear>2012</modyear></histories><catchline>Spills or discharges of oil or other substance -- Notice to director.</catchline><tab/>Any person who spills or discharges any oil or other substance which may cause the pollution of the waters of the state shall immediately notify the director of the spill or discharge, any containment procedures undertaken, and a proposed procedure for cleanup and disposal, in accordance with rules of the board.
</section><section number="19-5-115"><histories><history>Amended by Chapter <modchap sess="2026GS">434</modchap>, 2026 General Session</history><modyear>2026</modyear></histories><catchline>Violations -- Civil and criminal penalties -- Ordinances and rules of political subdivisions -- Reimbursement for expenses.</catchline><subsection number="19-5-115(1)">As used in this section:<subsection number="19-5-115(1)(a)">"Criminal negligence" means the same as that term is defined in Section <xref depth="3" refnumber="76-2-103">76-2-103</xref>.</subsection><subsection number="19-5-115(1)(b)">"Knowingly" means the same as that term is defined in Section <xref depth="3" refnumber="76-2-103">76-2-103</xref>.</subsection><subsection number="19-5-115(1)(c)"><subsection number="19-5-115(1)(c)(i)">"Organization" means a legal entity, other than a government, established or organized for any purpose. </subsection><subsection number="19-5-115(1)(c)(ii)">"Organization" includes a corporation, company, association, firm, partnership, joint stock company, foundation, institution, trust, society, union, or any other association of persons.</subsection></subsection><subsection number="19-5-115(1)(d)">"Serious bodily injury" means bodily injury that involves a substantial risk of death, unconsciousness, extreme physical pain, protracted and obvious disfigurement, or protracted loss or impairment of the function of a bodily member, organ, or mental faculty.</subsection><subsection number="19-5-115(1)(e)">"Willfully" means the same as that term is defined in Section <xref depth="3" refnumber="76-2-103">76-2-103</xref>.</subsection></subsection><subsection number="19-5-115(2)"><subsection number="19-5-115(2)(a)">A person that violates this chapter, or any permit, rule, or order adopted under this chapter, is subject in a civil proceeding to a civil penalty not to exceed $10,000 per day of violation.</subsection><subsection number="19-5-115(2)(b)">The department shall retain the revenue from an administrative fine under Subsection <xref depth="4" refnumber="19-5-108.3(7)">19-5-108.3(7)</xref> as a dedicated credit for the purposes of outreach and education to applicants.</subsection><subsection number="19-5-115(2)(c)">The division may issue an order to stop construction in accordance with Subsection <xref depth="4" refnumber="19-5-108.3(7)">19-5-108.3(7)</xref>.</subsection></subsection><subsection number="19-5-115(3)"><subsection number="19-5-115(3)(a)">A person is guilty of a class A misdemeanor, subject to imprisonment under Section <xref depth="3" refnumber="76-3-204">76-3-204</xref>, and subject to a fine not exceeding $25,000 per day, if the person with criminal negligence:<subsection number="19-5-115(3)(a)(i)">discharges pollutants in violation of Subsection <xref depth="4" refnumber="19-5-107(1)">19-5-107(1)</xref> or in violation of any condition or limitation included in a permit issued under Subsection <xref depth="4" refnumber="19-5-107(3)">19-5-107(3)</xref>;</subsection><subsection number="19-5-115(3)(a)(ii)">violates Section <xref depth="3" refnumber="19-5-113">19-5-113</xref>;</subsection><subsection number="19-5-115(3)(a)(iii)">violates a pretreatment standard or toxic effluent standard for publicly owned treatment works; or</subsection><subsection number="19-5-115(3)(a)(iv)">manages sewage sludge in violation of this chapter or rules adopted under this chapter.</subsection></subsection><subsection number="19-5-115(3)(b)">A person is guilty of a third degree felony, subject to imprisonment under Section <xref depth="3" refnumber="76-3-203">76-3-203</xref>, and subject to a fine not to exceed $50,000 per day of violation, if the person knowingly:<subsection number="19-5-115(3)(b)(i)">discharges pollutants in violation of Subsection <xref depth="4" refnumber="19-5-107(1)">19-5-107(1)</xref> or in violation of any condition or limitation included in a permit issued under Subsection <xref depth="4" refnumber="19-5-107(3)">19-5-107(3)</xref>;</subsection><subsection number="19-5-115(3)(b)(ii)">violates Section <xref depth="3" refnumber="19-5-113">19-5-113</xref>;</subsection><subsection number="19-5-115(3)(b)(iii)">violates a pretreatment standard or toxic effluent standard for publicly owned treatment works; or</subsection><subsection number="19-5-115(3)(b)(iv)">manages sewage sludge in violation of this chapter or rules adopted under this chapter.</subsection></subsection></subsection><subsection number="19-5-115(4)">A person is guilty of a third degree felony, subject to imprisonment under Section <xref depth="3" refnumber="76-3-203">76-3-203</xref>, and subject to a fine not exceeding $10,000 per day of violation, if the person knowingly:<subsection number="19-5-115(4)(a)">makes a false material statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this chapter, or by any permit, rule, or order issued under this chapter; or</subsection><subsection number="19-5-115(4)(b)">falsifies, tampers with, or knowingly renders inaccurate a monitoring device or method required to be maintained under this chapter.</subsection></subsection><subsection number="19-5-115(5)"><subsection number="19-5-115(5)(a)">A person is guilty of a second degree felony, subject to imprisonment under Section <xref depth="3" refnumber="76-3-203">76-3-203</xref>, and subject to a fine of not more than $250,000 if the person:<subsection number="19-5-115(5)(a)(i)">knowingly violates this chapter, or any permit, rule, or order adopted under this chapter; and</subsection><subsection number="19-5-115(5)(a)(ii)">knows at that time that the person is placing another person in imminent danger of death or serious bodily injury.</subsection></subsection><subsection number="19-5-115(5)(b)">If a person is an organization, the organization shall, upon conviction of violating Subsection <xref depth="4" refnumber="19-5-115(5)(a)">(5)(a)</xref>, be subject to a fine of not more than $1,000,000.</subsection><subsection number="19-5-115(5)(c)"><subsection number="19-5-115(5)(c)(i)">A defendant who is an individual is considered to have acted knowingly if:<subsection number="19-5-115(5)(c)(i)(A)">the defendant's conduct placed another person in imminent danger of death or serious bodily injury; and</subsection><subsection number="19-5-115(5)(c)(i)(B)">the defendant was aware of or believed that there was an imminent danger of death or serious bodily injury to another person.</subsection></subsection><subsection number="19-5-115(5)(c)(ii)">Knowledge possessed by a person other than the defendant may not be attributed to the defendant.</subsection><subsection number="19-5-115(5)(c)(iii)">Circumstantial evidence may be used to prove that the defendant possessed actual knowledge, including evidence that the defendant took affirmative steps to be shielded from receiving relevant information.</subsection></subsection><subsection number="19-5-115(5)(d)"><subsection number="19-5-115(5)(d)(i)">It is an affirmative defense to prosecution under this Subsection <xref depth="4" refnumber="19-5-115(5)">(5)</xref> that the conduct charged was consented to by the person endangered and that the danger and conduct charged were reasonably foreseeable hazards of:<subsection number="19-5-115(5)(d)(i)(A)">an occupation, a business, or a profession; or</subsection><subsection number="19-5-115(5)(d)(i)(B)">medical treatment or medical or scientific experimentation conducted by professionally approved methods and the other person was aware of the risks involved before giving consent.</subsection></subsection><subsection number="19-5-115(5)(d)(ii)">The defendant has the burden of proof to establish an affirmative defense under this Subsection <xref depth="4" refnumber="19-5-115(5)(d)">(5)(d)</xref> and shall prove that defense by a preponderance of the evidence.</subsection></subsection></subsection><subsection number="19-5-115(6)">For purposes of Subsections <xref depth="4" refnumber="19-5-115(3)">(3)</xref> through <xref depth="4" refnumber="19-5-115(5)">(5)</xref>, a single operational upset that leads to simultaneous violations of more than one pollutant parameter shall be treated as a single violation.</subsection><subsection number="19-5-115(7)"><subsection number="19-5-115(7)(a)">The director may bring a civil action for appropriate relief, including a permanent or temporary injunction, for any violation or threatened violation for which the director is authorized to issue a compliance order under Section <xref depth="3" refnumber="19-5-111">19-5-111</xref>.</subsection><subsection number="19-5-115(7)(b)">Notwithstanding Title <xref depth="1" refnumber="78B-3a">78B, Chapter 3a</xref>, Venue for Civil Actions, the director shall bring a civil action in the district court where the violation or threatened violation occurs if the director brings the action in a district court.</subsection></subsection><subsection number="19-5-115(8)"><subsection number="19-5-115(8)(a)">The attorney general is the legal advisor for the board and the director and shall defend the board or director in an action or proceeding brought against the board or director.</subsection><subsection number="19-5-115(8)(b)">The county attorney or district attorney, as appropriate under Section <xref depth="3" refnumber="17-68-302">17-68-302</xref> or <xref depth="3" refnumber="17-68-303">17-68-303</xref>, in the county in which a cause of action arises, shall bring an action, civil or criminal, requested by the director, to abate a condition that exists in violation of, or to prosecute for the violation of, or to enforce, the laws or the standards, orders, and rules of the board or the director issued under this chapter.</subsection><subsection number="19-5-115(8)(c)">The director may initiate an action under this section and be represented by the attorney general.</subsection></subsection><subsection number="19-5-115(9)">If a person fails to comply with a cease and desist order that is not subject to a stay pending administrative or judicial review, the director may initiate an action for and be entitled to injunctive relief to prevent any further or continued violation of the order.</subsection><subsection number="19-5-115(10)">A political subdivision of the state may enact and enforce ordinances or rules for the implementation of this chapter that are not inconsistent with this chapter.</subsection><subsection number="19-5-115(11)"><subsection number="19-5-115(11)(a)">For purposes of this section or an ordinance or rule enacted by a political subdivision under Subsection <xref depth="4" refnumber="19-5-115(10)">(10)</xref>, an act performed by an individual wholly within the scope of the individual's employment with an organization, is attributed to the organization.</subsection><subsection number="19-5-115(11)(b)">Notwithstanding the other provisions of this section, an action may not be brought against an individual acting wholly within the scope of the individual's employment with an organization if the action is brought under:<subsection number="19-5-115(11)(b)(i)">this section;</subsection><subsection number="19-5-115(11)(b)(ii)">an ordinance or rule issued by a political subdivision under Subsection <xref depth="4" refnumber="19-5-115(10)">(10)</xref>; or</subsection><subsection number="19-5-115(11)(b)(iii)">any local law or ordinance governing discharge.</subsection></subsection></subsection><subsection number="19-5-115(12)">Except as provided in Subsections <xref depth="4" refnumber="19-1-303.5(2)">19-1-303.5(2)</xref> and <xref depth="4" refnumber="19-5-108.3(7)(d)">19-5-108.3(7)(d)</xref>, and unless prohibited by federal law, the department shall deposit all money collected from a civil penalty or fine imposed under this section into the General Fund.</subsection></section><section number="19-5-116"><histories><history>Amended by Chapter <modchap sess="2020GS">256</modchap>, 2020 General Session</history><modyear>2020</modyear></histories><catchline>Limitation on effluent limitation standards for BOD, Total Suspended Solids, Bacteria, and pH for domestic or municipal sewage.</catchline><tab/>Unless required to meet instream water quality standards or federal requirements established under the federal Clean Water Act, the board may not establish, under Section <xref depth="3" refnumber="19-5-104" start="0">19-5-104</xref>, effluent limitation standards for Biochemical Oxygen Demand (BOD), Total Suspended Solids (SS), Bacteria, and pH for domestic or municipal sewage that are more stringent than the following:<subsection number="19-5-116(1)">
Biochemical Oxygen Demand (BOD): The arithmetic mean of BOD values determined on effluent samples collected during any 30-day period may not exceed 25 mg/l, nor shall the arithmetic mean exceed 35 mg/l during any seven-day period.</subsection><subsection number="19-5-116(2)">
Total Suspended Solids (SS): The arithmetic mean of SS values determined on effluent samples collected during any 30-day period may not exceed 25 mg/l, nor shall the arithmetic mean exceed 35 mg/l during any seven-day period.</subsection><subsection number="19-5-116(3)">
Bacteria:
<subsection number="19-5-116(3)(a)">
The geometric mean of total coliforms and fecal coliform bacteria in effluent samples collected during any 30-day period may not exceed either 2000/100 ml for total coliforms or 200/100 ml for fecal coliforms. The geometric mean during any seven-day period may not exceed 2500/100 ml for total coliforms or 250/100 for fecal coliforms.</subsection><subsection number="19-5-116(3)(b)">
The geometric mean of E. coli bacteria in effluent samples collected during any 30-day period shall not exceed 126 per 100 mL nor shall the geometric mean exceed 158 per 100 mL respectively during any 7-day period.</subsection></subsection><subsection number="19-5-116(4)">
pH: The pH level shall be maintained at a level not less than 6.5 or greater than 9.0.</subsection></section><section number="19-5-117"><histories><history>Amended by Chapter <modchap sess="1996GS">79</modchap>, 1996 General Session</history><modyear>1996</modyear></histories><catchline>Purpose and construction of chapter.</catchline><subsection number="19-5-117(1)">
It is the purpose of this chapter to provide:
<subsection number="19-5-117(1)(a)">
additional and cumulative remedies to prevent, abate, and control the pollution of the waters of the state; and</subsection><subsection number="19-5-117(1)(b)">
sufficient authority to allow the state to meet federal requirements for the state's assumption of primacy under the federal Water Pollution Control Act, as amended by the Water Quality Act of 1987, 33 U.S.C. Section 1251 et seq.</subsection></subsection><subsection number="19-5-117(2)">
Nothing  in this chapter:
<subsection number="19-5-117(2)(a)">
abridges or alters rights of action or remedies in equity or under common or statutory law, criminal or civil; or</subsection><subsection number="19-5-117(2)(b)">
estops the state or any municipality or person, as riparian owners or otherwise, in the exercise of their rights in equity or under common or statutory law to suppress nuisances or to abate pollution.</subsection></subsection></section><section number="19-5-118"><histories><history>Renumbered and Amended by Chapter <modchap sess="1991GS">112</modchap>, 1991 General Session</history><modyear>1991</modyear></histories><catchline>Chapter deemed auxiliary and supplementary to other laws.</catchline><tab/>This chapter does not  repeal any laws relating to the pollution of waters or any conservation laws, but is auxiliary and supplementary to them except to the extent that the  laws are in direct conflict with this chapter.
</section><section number="19-5-119"><histories><history>Renumbered and Amended by Chapter <modchap sess="1991GS">112</modchap>, 1991 General Session</history><modyear>1991</modyear></histories><catchline>State permits not required where federal government has primary responsibility.</catchline><tab/>If for any reason, including cessation of federal funding, the federal government has the primary responsibility for the discharge permit or underground injection permit programs in this state, discharge or underground injection permits established by this chapter are not required.
</section><section number="19-5-120"><histories><history>Amended by Chapter <modchap sess="2013GS">281</modchap>, 2013 General Session</history><modyear>2013</modyear></histories><catchline>Sewage permit program fee.</catchline><subsection number="19-5-120(1)">
The department may assess a fee established under Section <xref depth="3" refnumber="63J-1-504" start="0">63J-1-504</xref> against persons required to obtain a permit under Section <xref depth="3" refnumber="19-5-108" start="0">19-5-108</xref> for the management of sewage sludge, to be applied to the costs of administering the sewage permit program required by this chapter.</subsection><subsection number="19-5-120(2)">
In establishing the fee for each  sludge disposal permit holder, the department shall take into account the proportionate size of the population served by the permit holder.</subsection><subsection number="19-5-120(3)">
All proceeds from the fee shall be applied to the administering of the sewage permit program required by this chapter.</subsection></section><section number="19-5-121"><histories><history>Amended by Chapter <modchap sess="2011GS">297</modchap>, 2011 General Session</history><modyear>2011</modyear></histories><catchline>Underground wastewater disposal systems -- Certification required to design, inspect, maintain, or conduct percolation or soil tests -- Exemptions -- Rules -- Fees.</catchline><subsection number="19-5-121(1)">
As used in this section, "maintain" does not include the pumping of an underground wastewater disposal system.</subsection><subsection number="19-5-121(2)"><subsection number="19-5-121(2)(a)">
Except as provided in Subsections <xref depth="4" refnumber="19-5-121(2)(b)" start="0">(2)(b)</xref> and <xref depth="4" refnumber="19-5-121(2)(c)" start="0">(2)(c)</xref>, beginning January 1, 2002, a person may not design, inspect, maintain, or conduct percolation or soil tests for an underground wastewater disposal system, without first obtaining certification from the board.</subsection><subsection number="19-5-121(2)(b)">
An individual is not required to obtain certification from the board to maintain an underground wastewater disposal system that serves a noncommercial, private residence owned by the individual or a member of the individual's family and in which the individual or a member of the individual's family resides or an employee of the individual resides without payment of rent.</subsection><subsection number="19-5-121(2)(c)">
The board shall make rules allowing an uncertified individual to conduct percolation or soil tests for an underground wastewater disposal system that serves a noncommercial, private residence owned by the individual and in which the individual resides or intends to reside, or which is intended for use by an employee of the individual without payment of rent, if the individual:<subsection number="19-5-121(2)(c)(i)">
has the capability of properly conducting the tests; and</subsection><subsection number="19-5-121(2)(c)(ii)">
is supervised by a certified individual when conducting the tests.</subsection></subsection></subsection><subsection number="19-5-121(3)"><subsection number="19-5-121(3)(a)">
The board shall adopt and enforce rules for the certification and recertification of individuals who design, inspect, maintain, or conduct percolation or soil tests for underground wastewater disposal systems.</subsection><subsection number="19-5-121(3)(b)"><subsection number="19-5-121(3)(b)(i)">
The rules shall specify requirements for education and training and the type and duration of experience necessary to obtain certification.</subsection><subsection number="19-5-121(3)(b)(ii)">
The rules shall recognize the following in meeting the requirements for certification:
<subsection number="19-5-121(3)(b)(ii)(A)">
the experience of a contractor licensed under <xref depth="1" refnumber="58-55" start="0">Title 58, Chapter 55, Utah Construction Trades Licensing Act</xref>, who has five or more years of experience installing underground wastewater disposal systems;</subsection><subsection number="19-5-121(3)(b)(ii)(B)">
the experience of an environmental health scientist licensed under <xref depth="1" refnumber="58-20b" start="0">Title 58, Chapter 20b, Environmental Health Scientist Act</xref>; or</subsection><subsection number="19-5-121(3)(b)(ii)(C)">
the educational background of a professional engineer licensed under <xref depth="1" refnumber="58-22" start="0">Title 58, Chapter 22, Professional Engineers and Professional Land Surveyors Licensing Act</xref>.</subsection></subsection><subsection number="19-5-121(3)(b)(iii)">
If eligibility for certification is based on experience, the applicant for certification shall show proof of experience.</subsection></subsection></subsection><subsection number="19-5-121(4)">
The department may establish fees in accordance with Section <xref depth="3" refnumber="63J-1-504" start="0">63J-1-504</xref> for the testing and certification of individuals who design, inspect, maintain, or conduct percolation or soil tests for underground wastewater disposal systems.</subsection></section><section number="19-5-122"><histories><history>Amended by Chapter <modchap sess="2026GS">492</modchap>, 2026 General Session</history><modyear>2026</modyear></histories><catchline>Underground wastewater disposal systems -- Fee imposed on new systems.</catchline><subsection number="19-5-122(1)">Beginning July 1, 2001, a one-time fee is imposed on a new underground wastewater disposal system installed.</subsection><subsection number="19-5-122(2)">Beginning July 1, 2002, the fee shall be established by the department in accordance with Section <xref depth="3" refnumber="63J-1-504" start="0">63J-1-504</xref>.</subsection><subsection number="19-5-122(3)"><subsection number="19-5-122(3)(a)">The fee shall be paid when plans and specifications for the construction of a new underground wastewater disposal system are approved by the local health department or the Department of Environmental Quality.</subsection><subsection number="19-5-122(3)(b)">A local health department shall remit the fee revenue to the Division of Finance quarterly.</subsection></subsection><subsection number="19-5-122(4)">The fee revenue shall be:<subsection number="19-5-122(4)(a)">deposited into the Underground Wastewater Disposal Restricted Account created in Section <xref depth="3" refnumber="19-5-123" start="0">19-5-123</xref>; and</subsection><subsection number="19-5-122(4)(b)">used to pay for costs of underground wastewater disposal system training programs.</subsection></subsection></section><section number="19-5-123"><histories><history>Enacted by Chapter <modchap sess="2001GS">274</modchap>, 2001 General Session</history><modyear>2001</modyear></histories><catchline>Underground Wastewater Disposal System Restricted Account created -- Contents -- Use of account money.</catchline><subsection number="19-5-123(1)">
The Underground Wastewater Disposal System Restricted Account is created within the General Fund.</subsection><subsection number="19-5-123(2)">
The contents of the account shall consist of:
<subsection number="19-5-123(2)(a)">
revenue from fees collected under Sections <xref depth="3" refnumber="19-5-121" start="0">19-5-121</xref> and <xref depth="3" refnumber="19-5-122" start="0">19-5-122</xref>; and</subsection><subsection number="19-5-123(2)(b)">
interest and earnings on account money.</subsection></subsection><subsection number="19-5-123(3)">
Money in the account shall be appropriated by the Legislature to the department for costs of training, testing, and certifying individuals who design, inspect, maintain, or conduct percolation or soils tests for underground wastewater disposal systems.</subsection></section><section number="19-5-124"><histories><history>Enacted by Chapter <modchap sess="2008GS">81</modchap>, 2008 General Session</history><modyear>2008</modyear></histories><catchline>Phosphorus limit for household dishwashing detergent.</catchline><subsection number="19-5-124(1)">
As used in this section, "household dishwashing detergent" means a substance used:
<subsection number="19-5-124(1)(a)">
to clean an item commonly used for preparing food, eating, or drinking; and</subsection><subsection number="19-5-124(1)(b)">
by an individual for a personal, family, or household purpose.</subsection></subsection><subsection number="19-5-124(2)">
Except as provided by Subsection <xref depth="4" refnumber="19-5-124(3)" start="0">(3)</xref>, a person may not sell a household dishwashing detergent that contains 0.5% or more phosphorus by weight on or after July 1, 2010.</subsection><subsection number="19-5-124(3)">
This section does not apply to a dishwashing detergent designed and used for a commercial or industrial purpose.</subsection></section><section number="19-5-125"><histories><history>Amended by Chapter <modchap sess="2021S1">3</modchap>, 2021 Special Session 1</history><modyear>2021</modyear></histories><catchline>Yurt exemption.</catchline><subsection number="19-5-125(1)">
As used in this section:
<subsection number="19-5-125(1)(a)">
"Backcountry waste containment and disposal system" means a pickle pail, rocket box, tube toilet, John-E partner, or similar container used to collect and carry out waste, including fecal matter.</subsection><subsection number="19-5-125(1)(b)">
"Remote yurt" means the same as that term is defined in Section <xref depth="3" refnumber="15A-1-202" start="0">15A-1-202</xref>.</subsection></subsection><subsection number="19-5-125(2)">
Unless otherwise provided by ordinance in accordance with Subsection <xref depth="4" refnumber="15A-1-204(12)(b)" start="0">15A-1-204(12)(b)</xref>, a remote yurt is exempt from this chapter, rules made under this chapter, and local health department's jurisdiction over onsite wastewater disposal, except that the owner of a remote yurt shall ensure that an individual using the remote yurt uses a backcountry waste containment and disposal system and the local health department may enforce the provisions of this section.</subsection></section><section number="19-5-126"><histories><history>Enacted by Chapter <modchap sess="2021GS">401</modchap>, 2021 General Session</history><modyear>2021</modyear></histories><catchline>Division of Water Quality Oil, Gas, and Mining Restricted Account.</catchline><subsection number="19-5-126(1)">
As used in this section:
<subsection number="19-5-126(1)(a)">
"Account" means the Division of Water Quality Oil, Gas, and Mining Restricted Account created by this section.</subsection><subsection number="19-5-126(1)(b)">
"Division" means the Division of Water Quality.</subsection></subsection><subsection number="19-5-126(2)"><subsection number="19-5-126(2)(a)">
There is created a restricted account within the General Fund known as the "Division of Water Quality Oil, Gas, and Mining Restricted Account."</subsection><subsection number="19-5-126(2)(b)">
The account consists of:<subsection number="19-5-126(2)(b)(i)">
deposits to the account made under Section <xref depth="3" refnumber="51-9-306" start="0">51-9-306</xref>;</subsection><subsection number="19-5-126(2)(b)(ii)">
appropriations of the Legislature; and</subsection><subsection number="19-5-126(2)(b)(iii)">
interest and other earnings described in Subsection <xref depth="4" refnumber="19-5-126(2)(c)" start="0">(2)(c)</xref>.</subsection></subsection><subsection number="19-5-126(2)(c)">
The Office of the Treasurer shall deposit interest and other earnings derived from investment of money in the account into the account.</subsection></subsection><subsection number="19-5-126(3)"><subsection number="19-5-126(3)(a)">
Upon appropriation by the Legislature, the division shall use money from the account to pay the costs of programs or projects administered by the division that are primarily related to oil, gas, and mining.</subsection><subsection number="19-5-126(3)(b)">
An appropriation provided for under this section is not intended to replace the following that is otherwise allocated for the programs or projects described in Subsection <xref depth="4" refnumber="19-5-126(3)(a)" start="0">(3)(a)</xref>:<subsection number="19-5-126(3)(b)(i)">
federal money; or</subsection><subsection number="19-5-126(3)(b)(ii)">
a dedicated credit.</subsection></subsection></subsection><subsection number="19-5-126(4)">
Appropriations made in accordance with this section are nonlapsing in accordance with Section <xref depth="3" refnumber="63J-1-602.1" start="0">63J-1-602.1</xref>.</subsection></section><part number="19-5-2"><catchline>Capital Assets for Wastewater</catchline><section number="19-5-201"><histories><history>Enacted by Chapter <modchap sess="2022GS">66</modchap>, 2022 General Session</history><modyear>2022</modyear></histories><catchline>Definitions.</catchline><tab/>As used in this part:<subsection number="19-5-201(1)">
"Capital asset" means an asset that:
<subsection number="19-5-201(1)(a)">
is a significant investment or an essential component necessary to provide a wastewater service, including:<subsection number="19-5-201(1)(a)(i)">
a facility;</subsection><subsection number="19-5-201(1)(a)(ii)">
infrastructure, whether above or below ground level;</subsection><subsection number="19-5-201(1)(a)(iii)">
equipment; or</subsection><subsection number="19-5-201(1)(a)(iv)">
a communications network; and</subsection></subsection><subsection number="19-5-201(1)(b)">
is owned by a wastewater service provider.</subsection></subsection><subsection number="19-5-201(2)">
"Governing body" means a political subdivision governing body defined in Section <xref depth="3" refnumber="63A-15-102" start="0">63A-15-102</xref>.</subsection><subsection number="19-5-201(3)">
"Large underground wastewater disposal system" is as defined by rule made by the board in accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>.</subsection><subsection number="19-5-201(4)">
"Wastewater service provider" means a political subdivision of the state that owns, operates, or otherwise sponsors through agreement a sewerage system, a treatment works, or large underground wastewater disposal system for the collection, storage, treatment, or disposal of domestic waste.</subsection></section><section number="19-5-202"><histories><history>Enacted by Chapter <modchap sess="2022GS">66</modchap>, 2022 General Session</history><modyear>2022</modyear></histories><catchline>Capital asset management.</catchline><subsection number="19-5-202(1)">
As a condition of receiving state or federal financing or grants to be used for an improvement to a capital asset related to wastewater or sewer infrastructure, the governing body of a wastewater service provider shall commit to adopt a capital asset management plan.</subsection><subsection number="19-5-202(2)">
The board shall make rules, in accordance with <xref depth="1" refnumber="63G-3" start="0">Title 63G, Chapter 3, Utah Administrative Rulemaking Act</xref>, to establish the elements of a capital asset management plan required by Subsection <xref depth="4" refnumber="19-5-202(1)" start="0">(1)</xref>.</subsection></section></part></chapter>