<section number="57-8a-109"><effdate>5/7/2025</effdate><histories><history>Amended by Chapter <modchap sess="2025GS">226</modchap>, 2025 General Session</history><modyear>2025</modyear></histories><catchline>Approval of plans.</catchline><subsection number="57-8a-109(1)">As used in this section:<subsection number="57-8a-109(1)(a)">"Fire-resistant material" means a material designed and tested to resist ignition, slow the spread of fire, or withstand high temperatures, including:<subsection number="57-8a-109(1)(a)(i)">Class A roofing;</subsection><subsection number="57-8a-109(1)(a)(ii)">non-combustible siding;</subsection><subsection number="57-8a-109(1)(a)(iii)">a fiber cement product;</subsection><subsection number="57-8a-109(1)(a)(iv)">metal roofing; or</subsection><subsection number="57-8a-109(1)(a)(v)">fire-rated gypsum board.</subsection></subsection><subsection number="57-8a-109(1)(b)">"Lot plans" means plans:<subsection number="57-8a-109(1)(b)(i)">for the construction or improvement of a lot; and</subsection><subsection number="57-8a-109(1)(b)(ii)">that are required to be approved by the association before the lot construction or improvement may occur.</subsection></subsection><subsection number="57-8a-109(1)(c)">"Plan fee" means a fee that an association charges for review and approval of lot plans.</subsection></subsection><subsection number="57-8a-109(2)">An association may not charge a plan fee that exceeds the actual cost of reviewing and approving the lot plans.</subsection><subsection number="57-8a-109(3)">An association may not prohibit, unreasonably restrict, deny, or delay a plan due to the plan's inclusion of a fire-resistant material in an area with heightened risk of wildfire.</subsection><subsection number="57-8a-109(4)">If the association denies a lot plan, the association shall provide written notice to the lot owner specifying:<subsection number="57-8a-109(4)(a)">each governing document provision on which the association relied when denying the plan; and</subsection><subsection number="57-8a-109(4)(b)">the specific aspect of the proposed plan that does not conform to the specified governing document provision.</subsection></subsection></section>