<section number="73-1-4"><effdate>5/1/2024</effdate><enddate type="SC">5/6/2026</enddate><catchline>Reversion to the public by abandonment or forfeiture for nonuse within seven years -- Saved water -- Nonuse application.</catchline><subsection number="73-1-4(1)">As used in this section:<subsection number="73-1-4(1)(a)">"Public entity" means:<subsection number="73-1-4(1)(a)(i)">the United States;</subsection><subsection number="73-1-4(1)(a)(ii)">an agency of the United States;</subsection><subsection number="73-1-4(1)(a)(iii)">the state;</subsection><subsection number="73-1-4(1)(a)(iv)">a state agency;</subsection><subsection number="73-1-4(1)(a)(v)">a political subdivision of the state; or</subsection><subsection number="73-1-4(1)(a)(vi)">an agency of a political subdivision of the state.</subsection></subsection><subsection number="73-1-4(1)(b)">"Public water supplier" means an entity that:<subsection number="73-1-4(1)(b)(i)">supplies water, directly or indirectly, to the public for municipal, domestic, or industrial use; and</subsection><subsection number="73-1-4(1)(b)(ii)">is:<subsection number="73-1-4(1)(b)(ii)(A)">a public entity;</subsection><subsection number="73-1-4(1)(b)(ii)(B)">a water corporation, as defined in Section <xref depth="3" refnumber="54-2-1">54-2-1</xref>, that is regulated by the Public Service Commission;</subsection><subsection number="73-1-4(1)(b)(ii)(C)">a community water system:<subsection number="73-1-4(1)(b)(ii)(C)(I)">that:<subsection number="73-1-4(1)(b)(ii)(C)(I)(Aa)">supplies water to at least 100 service connections used by year-round residents; or</subsection><subsection number="73-1-4(1)(b)(ii)(C)(I)(Bb)">regularly serves at least 200 year-round residents; and</subsection></subsection><subsection number="73-1-4(1)(b)(ii)(C)(II)">whose voting members:<subsection number="73-1-4(1)(b)(ii)(C)(II)(Aa)">own a share in the community water system;</subsection><subsection number="73-1-4(1)(b)(ii)(C)(II)(Bb)">receive water from the community water system in proportion to the member's share in the community water system; and</subsection><subsection number="73-1-4(1)(b)(ii)(C)(II)(Cc)">pay the rate set by the community water system based on the water the member receives; or</subsection></subsection></subsection><subsection number="73-1-4(1)(b)(ii)(D)">a water users association:<subsection number="73-1-4(1)(b)(ii)(D)(I)">in which one or more public entities own at least 70% of the outstanding shares; and</subsection><subsection number="73-1-4(1)(b)(ii)(D)(II)">that is a local sponsor of a water project constructed by the United States Bureau of Reclamation.</subsection></subsection></subsection></subsection><subsection number="73-1-4(1)(c)">"Saved water" means the same as that term is defined in Section <xref depth="3" refnumber="73-3-3">73-3-3</xref>.</subsection><subsection number="73-1-4(1)(d)">"Shareholder" means the same as that term is defined in Section <xref depth="3" refnumber="73-3-3.5">73-3-3.5</xref>.</subsection><subsection number="73-1-4(1)(e)">"Water company" means the same as that term is defined in Section <xref depth="3" refnumber="73-3-3.5">73-3-3.5</xref>.</subsection><subsection number="73-1-4(1)(f)">"Water supply entity" means an entity that supplies water as a utility service or for irrigation purposes and is also:<subsection number="73-1-4(1)(f)(i)">a municipality, water conservancy district, metropolitan water district, irrigation district, or other public agency;</subsection><subsection number="73-1-4(1)(f)(ii)">a water company regulated by the Public Service Commission; or</subsection><subsection number="73-1-4(1)(f)(iii)">any other owner of a community water system.</subsection></subsection></subsection><subsection number="73-1-4(2)"><subsection number="73-1-4(2)(a)">Except as provided in Subsection (2)(b) or (e), when an appropriator or the appropriator's successor in interest abandons or ceases to beneficially use all or a portion of a water right for a period of at least seven years, the water right or the unused portion of that water right is subject to forfeiture in accordance with Subsection (2)(c).</subsection><subsection number="73-1-4(2)(b)"><subsection number="73-1-4(2)(b)(i)">An appropriator or the appropriator's successor in interest may file an application for nonuse with the state engineer.</subsection><subsection number="73-1-4(2)(b)(ii)">A nonuse application may be filed on all or a portion of the water right, including water rights held by a water company.</subsection><subsection number="73-1-4(2)(b)(iii)">After giving written notice to the water company, a shareholder may file a nonuse application with the state engineer on the water represented by the stock.</subsection><subsection number="73-1-4(2)(b)(iv)"><subsection number="73-1-4(2)(b)(iv)(A)">The approval of a nonuse application excuses the requirement of beneficial use of water from the date of filing.</subsection><subsection number="73-1-4(2)(b)(iv)(B)">The time during which an approved nonuse application is in effect does not count toward the seven-year period described in Subsection (2)(a).</subsection></subsection><subsection number="73-1-4(2)(b)(v)">The filing or approval of a nonuse application or a series of nonuse applications under Subsection (3) does not:<subsection number="73-1-4(2)(b)(v)(A)">constitute beneficial use of a water right;</subsection><subsection number="73-1-4(2)(b)(v)(B)">protect a water right that is already subject to forfeiture under this section; or</subsection><subsection number="73-1-4(2)(b)(v)(C)">bar a water right owner from:<subsection number="73-1-4(2)(b)(v)(C)(I)">using the water under the water right as permitted under the water right; or</subsection><subsection number="73-1-4(2)(b)(v)(C)(II)">claiming the benefit of Subsection (2)(e) or any other forfeiture defense provided by law.</subsection></subsection></subsection></subsection><subsection number="73-1-4(2)(c)"><subsection number="73-1-4(2)(c)(i)">Except as provided in Subsection (2)(c)(ii), a water right or a portion of the water right may not be forfeited unless a judicial action to declare the right forfeited is commenced:<subsection number="73-1-4(2)(c)(i)(A)">within 15 years from the end of the latest period of nonuse of at least seven years; or</subsection><subsection number="73-1-4(2)(c)(i)(B)">within the combined time of 15 years from the end of the most recent period of nonuse of at least seven years and the time the water right was subject to one or more nonuse applications.</subsection></subsection><subsection number="73-1-4(2)(c)(ii)"><subsection number="73-1-4(2)(c)(ii)(A)">The state engineer, in a proposed determination of rights filed with the court and prepared in accordance with Section <xref depth="3" refnumber="73-4-11">73-4-11</xref>, may not assert that a water right was forfeited unless the most recent period of nonuse of seven years ends or occurs:<subsection number="73-1-4(2)(c)(ii)(A)(I)">during the 15 years immediately preceding the day on which the state engineer files the proposed determination of rights with the court; or</subsection><subsection number="73-1-4(2)(c)(ii)(A)(II)">during the combined time immediately preceding the day on which the state engineer files the proposed determination of rights consisting of 15 years and the time the water right was subject to one or more approved nonuse applications.</subsection></subsection><subsection number="73-1-4(2)(c)(ii)(B)">After the day on which a proposed determination of rights is filed with the court a person may not assert that a water right subject to that determination was forfeited before the issuance of the proposed determination, unless the state engineer asserts forfeiture in the proposed determination, or a person, in accordance with Section <xref depth="3" refnumber="73-4-11">73-4-11</xref>, makes an objection to the proposed determination that asserts forfeiture.</subsection></subsection><subsection number="73-1-4(2)(c)(iii)">A water right, found to be valid in a decree entered in an action for general determination of rights under Chapter 4, Determination of Water Rights, is subject to a claim of forfeiture based on a seven-year period of nonuse that begins after the day on which the state engineer filed the related proposed determination of rights with the court, unless the decree provides otherwise.</subsection><subsection number="73-1-4(2)(c)(iv)">If in a judicial action a court declares a water right forfeited, on the date on which the water right is forfeited:<subsection number="73-1-4(2)(c)(iv)(A)">the right to beneficially use the water reverts to the public; and</subsection><subsection number="73-1-4(2)(c)(iv)(B)">the water made available by the forfeiture:<subsection number="73-1-4(2)(c)(iv)(B)(I)">first, satisfies other water rights in the hydrologic system in order of priority date; and</subsection><subsection number="73-1-4(2)(c)(iv)(B)(II)">second, may be appropriated as provided in this title.</subsection></subsection></subsection></subsection><subsection number="73-1-4(2)(d)">Except as provided in Subsection (2)(e), this section applies whether the unused or abandoned water or a portion of the water is:<subsection number="73-1-4(2)(d)(i)">permitted to run to waste; or</subsection><subsection number="73-1-4(2)(d)(ii)">beneficially used by others without right with the knowledge of the water right holder.</subsection></subsection><subsection number="73-1-4(2)(e)">This section does not apply to:<subsection number="73-1-4(2)(e)(i)">the beneficial use of water according to a written, terminable lease or other agreement with the appropriator or the appropriator's successor in interest;</subsection><subsection number="73-1-4(2)(e)(ii)">a water right if its place of use is contracted under an approved state agreement or federal conservation fallowing program;</subsection><subsection number="73-1-4(2)(e)(iii)">those periods of time when a surface water or groundwater source fails to yield sufficient water to satisfy the water right;</subsection><subsection number="73-1-4(2)(e)(iv)">a water right when water is unavailable because of the water right's priority date;</subsection><subsection number="73-1-4(2)(e)(v)">a water right to store water in a surface reservoir, or an aquifer in accordance with <xref depth="3" refnumber="Chapter 3b, Groundwater Recharge and Recovery Act">Chapter 3b, Groundwater Recharge and Recovery Act</xref>, if the water is stored for present or future beneficial use;</subsection><subsection number="73-1-4(2)(e)(vi)">a water right if a water user has beneficially used substantially all of the water right within a seven-year period, provided that this exemption does not apply to the adjudication of a water right in a general determination of water rights under Chapter 4, Determination of Water Rights;</subsection><subsection number="73-1-4(2)(e)(vii)">except as provided by Subsection (2)(g), a water right:<subsection number="73-1-4(2)(e)(vii)(A)"><subsection number="73-1-4(2)(e)(vii)(A)(I)">owned by a public water supplier;</subsection><subsection number="73-1-4(2)(e)(vii)(A)(II)">represented by a public water supplier's ownership interest in a water company; or</subsection><subsection number="73-1-4(2)(e)(vii)(A)(III)">to which a public water supplier owns the right of beneficial use; and</subsection></subsection><subsection number="73-1-4(2)(e)(vii)(B)">conserved or held for the reasonable future water requirement of the public, which is determined according to Subsection (2)(f);</subsection></subsection><subsection number="73-1-4(2)(e)(viii)">a supplemental water right during a period of time when another water right available to the appropriator or the appropriator's successor in interest provides sufficient water so as to not require beneficial use of the supplemental water right;</subsection><subsection number="73-1-4(2)(e)(ix)">a period of nonuse of a water right during the time the water right is subject to an approved change application where the applicant is diligently pursuing certification;</subsection><subsection number="73-1-4(2)(e)(x)">a water right to store water in a surface reservoir if:<subsection number="73-1-4(2)(e)(x)(A)">storage is limited by a safety, regulatory, or engineering restraint that the appropriator or the appropriator's successor in interest cannot reasonably correct; and</subsection><subsection number="73-1-4(2)(e)(x)(B)">not longer than seven years have elapsed since the limitation described in Subsection (2)(e)(x)(A) is imposed; </subsection></subsection><subsection number="73-1-4(2)(e)(xi)">a water right subject to an approved change application for use within a water bank that has been authorized but not dissolved under Chapter 31, Water Banking Act, during the period of time the state engineer authorizes the water right to be used within the water bank; or</subsection><subsection number="73-1-4(2)(e)(xii)">subject to Subsection (2)(h), that portion of a water right that is quantified as saved water in a final order from the state engineer approving a change application, but not to exceed the amount subsequently verified by the state engineer in a certificate issued under Section <xref depth="3" refnumber="73-3-17">73-3-17</xref>.</subsection></subsection><subsection number="73-1-4(2)(f)"><subsection number="73-1-4(2)(f)(i)">The reasonable future water requirement of the public is the amount of water needed in the next 40 years by:<subsection number="73-1-4(2)(f)(i)(A)">the persons within the public water supplier's reasonably anticipated service area based on reasonably anticipated population growth; or</subsection><subsection number="73-1-4(2)(f)(i)(B)">other water use demand.</subsection></subsection><subsection number="73-1-4(2)(f)(ii)">For purposes of Subsection (2)(f)(i), a community water system's reasonably anticipated service area:<subsection number="73-1-4(2)(f)(ii)(A)">is the area served by the community water system's distribution facilities; and</subsection><subsection number="73-1-4(2)(f)(ii)(B)">expands as the community water system expands the distribution facilities in accordance with Title 19, Chapter 4, Safe Drinking Water Act.</subsection></subsection><subsection number="73-1-4(2)(f)(iii)">The state engineer shall by rule made in accordance with Subsection <xref depth="3" refnumber="73-2-1">73-2-1</xref>(4) establish standards for a written plan that may be presented as evidence in conformance with this Subsection (2)(f), except that before a rule establishing standards for a written plan under this Subsection (2)(f) takes effect, in addition to complying with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the state engineer shall present the rule to:<subsection number="73-1-4(2)(f)(iii)(A)">if the Legislature is not in session, the Natural Resources, Agriculture, and Environment Interim Committee; or</subsection><subsection number="73-1-4(2)(f)(iii)(B)">if the Legislature is in session, the House of Representatives and Senate Natural Resources, Agriculture, and Environment standing committees.</subsection></subsection></subsection><subsection number="73-1-4(2)(g)">For a water right acquired by a public water supplier on or after May 5, 2008, Subsection (2)(e)(vii) applies if:<subsection number="73-1-4(2)(g)(i)">the public water supplier submits a change application under Section <xref depth="3" refnumber="73-3-3">73-3-3</xref>; and</subsection><subsection number="73-1-4(2)(g)(ii)">the state engineer approves the change application.</subsection></subsection><subsection number="73-1-4(2)(h)">Saved water does not retain the protection of Subsection (2)(e)(xii) and any period of nonuse for saved water begins to run the day on which:<subsection number="73-1-4(2)(h)(i)">the underlying water right that serves as the basis for the saved water is declared by court decree to have been lost due to forfeiture under this section; or</subsection><subsection number="73-1-4(2)(h)(ii)">the title of a right to saved water segregated under Section <xref depth="3" refnumber="73-3-27">73-3-27</xref> is conveyed independent of the underlying water right.</subsection></subsection></subsection><subsection number="73-1-4(3)"><subsection number="73-1-4(3)(a)">The state engineer shall furnish a nonuse application form requiring the following information:<subsection number="73-1-4(3)(a)(i)">the name and address of the applicant;</subsection><subsection number="73-1-4(3)(a)(ii)">a description of the water right or a portion of the water right, including the point of diversion, place of use, and priority;</subsection><subsection number="73-1-4(3)(a)(iii)">the quantity of water;</subsection><subsection number="73-1-4(3)(a)(iv)">the period of use;</subsection><subsection number="73-1-4(3)(a)(v)">the extension of time applied for;</subsection><subsection number="73-1-4(3)(a)(vi)">a statement of the reason for the nonuse of the water; and</subsection><subsection number="73-1-4(3)(a)(vii)">any other information that the state engineer requires.</subsection></subsection><subsection number="73-1-4(3)(b)"><subsection number="73-1-4(3)(b)(i)">Upon receipt of the application, the state engineer shall publish a notice of the application once a week for two successive weeks:<subsection number="73-1-4(3)(b)(i)(A)">in a newspaper of general circulation in the county in which the source of the water supply is located and where the water is to be beneficially used; and</subsection><subsection number="73-1-4(3)(b)(i)(B)">as required in Section <xref depth="3" refnumber="45-1-101">45-1-101</xref>.</subsection></subsection><subsection number="73-1-4(3)(b)(ii)">The notice shall:<subsection number="73-1-4(3)(b)(ii)(A)">state that an application has been made; and</subsection><subsection number="73-1-4(3)(b)(ii)(B)">specify where the interested party may obtain additional information relating to the application.</subsection></subsection></subsection><subsection number="73-1-4(3)(c)">An interested person may file a written protest with the state engineer against the granting of the application:<subsection number="73-1-4(3)(c)(i)">within 20 days after the notice is published, if the adjudicative proceeding is informal; and</subsection><subsection number="73-1-4(3)(c)(ii)">within 30 days after the notice is published, if the adjudicative proceeding is formal.</subsection></subsection><subsection number="73-1-4(3)(d)">In a proceeding to determine whether the nonuse application should be approved or rejected, the state engineer shall follow Title 63G, Chapter 4, Administrative Procedures Act.</subsection><subsection number="73-1-4(3)(e)">After further investigation, the state engineer may approve or reject the application.</subsection></subsection><subsection number="73-1-4(4)"><subsection number="73-1-4(4)(a)">The state engineer shall grant a nonuse application on all or a portion of a water right for a period of time not exceeding seven years if the applicant shows a reasonable cause for nonuse.</subsection><subsection number="73-1-4(4)(b)">A reasonable cause for nonuse includes:<subsection number="73-1-4(4)(b)(i)">a demonstrable financial hardship or economic depression;</subsection><subsection number="73-1-4(4)(b)(ii)">a physical cause or change that renders use beyond the reasonable control of the water right owner so long as the water right owner acts with reasonable diligence to resume or restore the use;</subsection><subsection number="73-1-4(4)(b)(iii)">the initiation of water conservation or an efficiency practice, or the operation of a groundwater recharge recovery program approved by the state engineer;</subsection><subsection number="73-1-4(4)(b)(iv)">operation of a legal proceeding;</subsection><subsection number="73-1-4(4)(b)(v)">the holding of a water right or stock in a mutual water company without use by a water supply entity to meet the reasonable future requirements of the public;</subsection><subsection number="73-1-4(4)(b)(vi)">situations where, in the opinion of the state engineer, the nonuse would assist in implementing an existing, approved water management plan; or</subsection><subsection number="73-1-4(4)(b)(vii)">the loss of capacity caused by deterioration of the water supply or delivery equipment if the applicant submits, with the application, a specific plan to resume full use of the water right by replacing, restoring, or improving the equipment.</subsection></subsection></subsection><subsection number="73-1-4(5)"><subsection number="73-1-4(5)(a)">Sixty days before the expiration of a nonuse application, the state engineer shall notify the applicant by mail or by a form of electronic communication through which receipt is verifiable, of the date when the nonuse application will expire.</subsection><subsection number="73-1-4(5)(b)">An applicant may file a subsequent nonuse application in accordance with this section.</subsection></subsection></section>