<?xml version="1.0" encoding="ISO-8859-1"?><section number="78B-2-225"><effdate>5/12/2020</effdate><histories><history>Amended by Chapter <modchap sess="2020GS">97</modchap>, 2020 General Session</history><modyear>2020</modyear></histories><catchline>Actions related to improvements in real property.</catchline><subsection number="78B-2-225(1)">
As used in this section:
<subsection number="78B-2-225(1)(a)">
"Abandonment" means that there has been no design or construction activity on an improvement for a continuous period of at least one year.</subsection><subsection number="78B-2-225(1)(b)">
"Action" means any claim for judicial, arbitral, or administrative relief for acts, errors, omissions, or breach of duty arising out of or related to the design, construction, or installation of an improvement, regardless of whether that action is based in tort, contract, warranty, strict liability, product liability, indemnity, contribution, or other source of law.</subsection><subsection number="78B-2-225(1)(c)">
"Completion" means the date of substantial completion of an improvement to real property as established by the earliest of:<subsection number="78B-2-225(1)(c)(i)">
a Certificate of Substantial Completion;</subsection><subsection number="78B-2-225(1)(c)(ii)">
a Certificate of Occupancy issued by a governing agency; or</subsection><subsection number="78B-2-225(1)(c)(iii)">
the date of first use or possession of the improvement.</subsection></subsection><subsection number="78B-2-225(1)(d)">
"Improvement" means any building, structure, infrastructure, road, utility, or other similar man-made change, addition, modification, or alteration to real property.</subsection><subsection number="78B-2-225(1)(e)">
"Person" means an individual, corporation, limited liability company, partnership, joint venture, association, proprietorship, or any other legal or governmental entity.</subsection><subsection number="78B-2-225(1)(f)">
"Provider" means any person:<subsection number="78B-2-225(1)(f)(i)">
contributing to, providing, or performing:
<subsection number="78B-2-225(1)(f)(i)(A)">
studies, plans, specifications, drawings, designs, value engineering, cost or quantity estimates, surveys, staking, construction, installation, or labor to an improvement; or</subsection><subsection number="78B-2-225(1)(f)(i)(B)">
the review, observation, administration, management, supervision, inspections, and tests of construction for or in relation to an improvement; or</subsection></subsection><subsection number="78B-2-225(1)(f)(ii)">
providing or contributing materials, products, or equipment that is incorporated into an improvement.</subsection></subsection></subsection><subsection number="78B-2-225(2)">
The Legislature finds that:
<subsection number="78B-2-225(2)(a)">
exposing a provider to suits and liability for acts, errors, omissions, or breach of duty after the possibility of injury or damage has become highly remote and unexpectedly creates costs and hardships to the provider and the citizens of the state;</subsection><subsection number="78B-2-225(2)(b)">
these costs and hardships include liability insurance costs, records storage costs, undue and unlimited liability risks during the life of both a provider and an improvement, and difficulties in defending against claims many years after completion of an improvement;</subsection><subsection number="78B-2-225(2)(c)">
these costs and hardships constitute clear social and economic evils;</subsection><subsection number="78B-2-225(2)(d)">
the possibility of injury and damage becomes highly remote and unexpected seven years following completion or abandonment; and</subsection><subsection number="78B-2-225(2)(e)">
except as provided in Subsection <xref depth="4" refnumber="78B-2-225(7)" start="0">(7)</xref>, it is in the best interests of the citizens of the state to impose the periods of limitation and repose provided in this chapter upon all causes of action by or against a provider arising out of or related to the design, construction, or installation of an improvement.</subsection></subsection><subsection number="78B-2-225(3)"><subsection number="78B-2-225(3)(a)">
Except as provided in Subsections <xref depth="4" refnumber="78B-2-225(3)(b)" start="0">(3)(b)</xref> and <xref depth="4" refnumber="78B-2-225(3)(c)" start="0">(c)</xref>, an action by or against a provider based in contract or warranty shall be commenced within six years after the date of completion or abandonment of an improvement.</subsection><subsection number="78B-2-225(3)(b)">
If a provider is required by an express term of a contract or warranty to perform an obligation later than the six-year period described in Subsection <xref depth="4" refnumber="78B-2-225(3)(a)" start="0">(3)(a)</xref>, and the provider fails to perform the obligation as required, an action for that breach of the contract or warranty shall be commenced within two years after the day on which the breach is discovered or should have been discovered.</subsection><subsection number="78B-2-225(3)(c)">
If a contract or warranty expressly establishes a different period of limitations than this section, the action shall be commenced within that limitations period.</subsection></subsection><subsection number="78B-2-225(4)"><subsection number="78B-2-225(4)(a)">
All other actions by or against a provider shall be commenced within two years from the earlier of the date of discovery of a cause of action or the date upon which a cause of action should have been discovered through reasonable diligence.</subsection><subsection number="78B-2-225(4)(b)">
If the cause of action is discovered or discoverable before completion or abandonment of an improvement, the two-year period begins to run upon completion or abandonment.</subsection><subsection number="78B-2-225(4)(c)">
Notwithstanding Subsection <xref depth="4" refnumber="78B-2-225(4)(a)" start="0">(4)(a)</xref>, and except as provided in Subsection <xref depth="4" refnumber="78B-2-225(4)(d)" start="0">(4)(d)</xref>, an action under this Subsection <xref depth="4" refnumber="78B-2-225(4)" start="0">(4)</xref> may not be commenced against a provider more than nine years after completion or abandonment of an improvement. </subsection><subsection number="78B-2-225(4)(d)">
If an action under Subsection <xref depth="4" refnumber="78B-2-225(4)(a)" start="0">(4)(a)</xref> is discovered or discoverable in the eighth or ninth year of the nine-year period, a claimant shall have two years from the date of discovery to commence an action.</subsection></subsection><subsection number="78B-2-225(5)">
Subsection <xref depth="4" refnumber="78B-2-225(4)" start="0">(4)</xref> does not apply to an action against a provider:
<subsection number="78B-2-225(5)(a)">
who has fraudulently concealed the provider's act, error, omission, or breach of duty, or the injury, damage, or other loss caused by the provider's act, error, omission, or breach of duty; or</subsection><subsection number="78B-2-225(5)(b)">
for a willful or intentional act, error, omission, or breach of duty.</subsection></subsection><subsection number="78B-2-225(6)">
If an individual otherwise entitled to bring an action did not commence the action within the periods prescribed by Subsections <xref depth="4" refnumber="78B-2-225(3)" start="0">(3)</xref> and <xref depth="4" refnumber="78B-2-225(4)" start="0">(4)</xref> solely because that individual was a minor or mentally incompetent and without a legal guardian, that individual shall have two years from the date the disability is removed to commence the action.</subsection><subsection number="78B-2-225(7)">
This section shall not apply to an action for the death of or bodily injury to an individual while engaged in the design, installation, or construction of an improvement.</subsection><subsection number="78B-2-225(8)">
This section does not apply to any action against any person in actual possession or control of the improvement as owner, tenant, or otherwise, at the time any defective or unsafe condition of the improvement proximately causes the injury for which the action is brought.</subsection><subsection number="78B-2-225(9)">
This section does not extend the period of limitation or repose otherwise prescribed by law or a valid and enforceable contract.</subsection><subsection number="78B-2-225(10)">
This section does not create or modify any claim or cause of action.</subsection><subsection number="78B-2-225(11)">
This section applies to all causes of action that accrue after May 3, 2003, notwithstanding that the improvement was completed or abandoned before May 3, 2004.</subsection></section>