This document includes House Committee Amendments incorporated into the bill on Thu, Mar 5, 2015 at 11:30 AM by lerror.
1     
IRRIGATION SERVICE WATER RIGHTS AMENDMENTS

2     
2015 GENERAL SESSION

3     
STATE OF UTAH

4     
Chief Sponsor: Kevin T. Van Tassell

5     
House Sponsor: Brad King

6     

7     LONG TITLE
8     General Description:
9          This bill clarifies procedures related to filing a change application.
10     Highlighted Provisions:
11          This bill:
12          ▸     states that a change application on a United States Indian Irrigation Service water
13     right that is serving the needs of a township or municipality shall be signed by:
14               •     the local public water supplier that is contractually responsible for the operation
15     and maintenance of the public water supply system; and
16               •     the record owner of the water right.
17     Money Appropriated in this Bill:
18          None
19     Other Special Clauses:
20          None
21     Utah Code Sections Affected:
22     AMENDS:
23          73-3-3, as last amended by Laws of Utah 2012, Chapter 229
24     

25     Be it enacted by the Legislature of the state of Utah:
26          Section 1. Section 73-3-3 is amended to read:
27          73-3-3. Permanent or temporary changes in point of diversion, place of use, or

28     purpose of use.
29          (1) For purposes of this section:
30          (a) "Permanent change" means a change for an indefinite period of time with an intent
31     to relinquish the original point of diversion, place of use, or purpose of use.
32          (b) "Temporary change" means a change for a fixed period of time not exceeding one
33     year.
34          (2) (a) Subject to Subsection (2)(c), a person entitled to the use of water may make
35     permanent or temporary changes in the:
36          (i) point of diversion;
37          (ii) place of use; or
38          (iii) purpose of use for which the water was originally appropriated.
39          (b) Except as provided by Section 73-3-30, a change may not be made if it impairs a
40     vested water right without just compensation.
41          (c) A change application on a federal reclamation project water right shall be signed
42     by:
43          (i) the local water users organization that is contractually responsible for:
44          (A) the operation and maintenance of the project; or
45          (B) the repayment of project costs; and
46          (ii) the record owner of the water right.
47          (d) A change application on a United States Indian Irrigation Service water right that is
48     serving the needs of a township or municipality shall be signed by:
49          (i) the local public water supplier that is Ĥ→ [
contractually] ←Ĥ responsible for
49a     the operation and
50     maintenance of the public water supply system; and
51          (ii) the record owner of the water right.
52          (3) A person entitled to use water shall change a point of diversion, place of use, or
53     purpose of water use, including water involved in a general adjudication or other suit, in the
54     manner provided in this section.
55          (4) (a) A person entitled to use water may not make a change unless the state engineer
56     approves the change application.
57          (b) A person entitled to use water shall submit a change application upon forms
58     furnished by the state engineer and shall set forth:

59          (i) the applicant's name;
60          (ii) the water right description;
61          (iii) the water quantity;
62          (iv) the stream or water source;
63          (v) if applicable, the point on the stream or water source where the water is diverted;
64          (vi) if applicable, the point to which it is proposed to change the diversion of the water;
65          (vii) the place, purpose, and extent of the present use;
66          (viii) the place, purpose, and extent of the proposed use; and
67          (ix) any other information that the state engineer requires.
68          (5) (a) The state engineer shall follow the same procedures, and the rights and duties of
69     the applicants with respect to applications for permanent changes of point of diversion, place of
70     use, or purpose of use shall be the same, as provided in this title for applications to appropriate
71     water.
72          (b) The state engineer may waive notice for a permanent change application involving
73     only a change in point of diversion of 660 feet or less.
74          (6) (a) The state engineer shall investigate all temporary change applications.
75          (b) If the state engineer finds that the temporary change will not impair a vested water
76     right, the state engineer shall issue an order authorizing the change.
77          (c) If the state engineer finds that the change sought might impair a vested water right,
78     before authorizing the change, the state engineer shall give notice of the application to any
79     person whose right may be affected by the change.
80          (d) Before making an investigation or giving notice, the state engineer may require the
81     applicant to deposit a sum of money sufficient to pay the expenses of the investigation and
82     publication of notice.
83          (7) (a) Except as provided by Section 73-3-30, the state engineer may not reject a
84     permanent or temporary change application for the sole reason that the change would impair a
85     vested water right.
86          (b) If otherwise proper, the state engineer may approve a permanent or temporary
87     change application for part of the water involved or upon the condition that the applicant
88     acquire the conflicting water right.
89          (8) (a) A person holding an approved application for the appropriation of water may

90     change the point of diversion, place of use, or purpose of use.
91          (b) A change of an approved application does not:
92          (i) affect the priority of the original application; or
93          (ii) extend the time period within which the construction of work is to begin or be
94     completed.
95          (9) Any person who changes or who attempts to change a point of diversion, place of
96     use, or purpose of use, either permanently or temporarily, without first applying to the state
97     engineer in the manner provided in this section:
98          (a) obtains no right;
99          (b) is guilty of a crime punishable under Section 73-2-27 if the change or attempted
100     change is made knowingly or intentionally; and
101          (c) is guilty of a separately punishable offense for each day of the unlawful change.
102          (10) (a) This section does not apply to the replacement of an existing well by a new
103     well drilled within a radius of 150 feet from the point of diversion of the existing well.
104          (b) Any replacement well must be drilled in accordance with the requirements of
105     Section 73-3-28.






Legislative Review Note
     as of 2-17-15 4:46 PM


Office of Legislative Research and General Counsel