1     
QUANTITY IMPAIRMENT MODIFICATIONS

2     
2019 GENERAL SESSION

3     
STATE OF UTAH

4     
Chief Sponsor: Carl R. Albrecht

5     
Senate Sponsor: Daniel Hemmert

6     

7     LONG TITLE
8     General Description:
9          This bill deals with change applications.
10     Highlighted Provisions:
11          This bill:
12          ▸     states that there is a rebuttable presumption of quantity impairment to the extent
13     that, for a period of at least seven consecutive years, a portion of the right identified
14     in a change application has not been:
15               •     diverted from the approved point of diversion; or
16               •     beneficially used at the approved place of use.
17     Money Appropriated in this Bill:
18          None
19     Other Special Clauses:
20          None
21     Utah Code Sections Affected:
22     AMENDS:
23          73-3-8, as last amended by Laws of Utah 2015, Chapter 245 and last amended by
24     Coordination Clause, Laws of Utah 2015, Chapter 249
25     

26     Be it enacted by the Legislature of the state of Utah:
27          Section 1. Section 73-3-8 is amended to read:
28          73-3-8. Approval or rejection of application -- Requirements for approval --
29     Application for specified period of time -- Filing of royalty contract for removal of salt or

30     minerals.
31          (1) (a) It shall be the duty of the state engineer to approve an application if there is
32     reason to believe that:
33          (i) for an application to appropriate, there is unappropriated water in the proposed
34     source;
35          (ii) the proposed use will not impair existing rights or interfere with the more
36     beneficial use of the water;
37          (iii) the proposed plan:
38          (A) is physically and economically feasible, unless the application is filed by the
39     United States Bureau of Reclamation; and
40          (B) would not prove detrimental to the public welfare;
41          (iv) the applicant has the financial ability to complete the proposed works;
42          (v) the application was filed in good faith and not for purposes of speculation or
43     monopoly; and
44          (vi) if applicable, the application complies with a groundwater management plan
45     adopted under Section 73-5-15.
46          (b) If the state engineer, because of information in the state engineer's possession
47     obtained either by the state engineer's own investigation or otherwise, has reason to believe that
48     an application will interfere with the water's more beneficial use for irrigation, municipal and
49     industrial, domestic or culinary, stock watering, power or mining development, or
50     manufacturing, or will unreasonably affect public recreation or the natural stream environment,
51     or will prove detrimental to the public welfare, the state engineer shall withhold approval or
52     rejection of the application until the state engineer has investigated the matter.
53          (c) If an application does not meet the requirements of this section, it shall be rejected.
54          (2) (a) An application to appropriate water for industrial, power, mining development,
55     manufacturing purposes, agriculture, or municipal purposes may be approved for a specific and
56     certain period from the time the water is placed to beneficial use under the application, but in
57     no event may an application be granted for a period of time less than that ordinarily needed to

58     satisfy the essential and primary purpose of the application or until the water is no longer
59     available as determined by the state engineer.
60          (b) At the expiration of the period fixed by the state engineer the water shall revert to
61     the public and is subject to appropriation as provided by this title.
62          (c) No later than 60 calendar days before the expiration date of the fixed time period,
63     the state engineer shall send notice by mail or by any form of electronic communication
64     through which receipt is verifiable, to the applicant of record.
65          (d) Except as provided by Subsection (2)(e), the state engineer may extend any limited
66     water right upon a showing that:
67          (i) the essential purpose of the original application has not been satisfied;
68          (ii) the need for an extension is not the result of any default or neglect by the applicant;
69     and
70          (iii) the water is still available.
71          (e) No extension shall exceed the time necessary to satisfy the primary purpose of the
72     original application.
73          (f) A request for extension of the fixed time period must be filed in writing in the
74     office of the state engineer on or before the expiration date of the application.
75          (3) (a) Before the approval of any application for the appropriation of water from
76     navigable lakes or streams of the state that contemplates the recovery of salts and other
77     minerals therefrom by precipitation or otherwise, the applicant shall file with the state engineer
78     a copy of a contract for the payment of royalties to the state.
79          (b) The approval of an application shall be revoked in the event of the failure of the
80     applicant to comply with terms of the royalty contract.
81          (4) (a) The state engineer shall investigate all temporary change applications.
82          (b) The state engineer shall:
83          (i) approve the temporary change if the state engineer finds there is reason to believe
84     that it will not impair an existing right; and
85          (ii) deny the temporary change if the state engineer finds there is reason to believe it

86     would impair an existing right.
87          (5) (a) With respect to a change application for a permanent change:
88          (i) the state engineer shall follow the same procedures provided in this title for
89     approving an application to appropriate water; and
90          (ii) the rights and duties of a change applicant are the same as the rights and duties of a
91     person who applies to appropriate water under this title.
92          (b) The state engineer may waive notice for a permanent change application if the
93     application only involves a change in point of diversion of 660 feet or less.
94          (c) The state engineer may condition approval of a change application to prevent an
95     enlargement of the quantity of water depleted by the nature of the proposed use when compared
96     with the nature of the currently approved use of water proposed to be changed.
97          (d) A condition described in Subsection (5)(c) may not include a reduction in the
98     currently approved diversion rate of water under the water right identified in the change
99     application solely to account for the difference in depletion under the nature of the proposed
100     use when compared with the nature of the currently approved use.
101          (6) (a) Except as provided in Subsection (6)(b), the state engineer shall reject a
102     permanent change application if the person proposing to make the change is unable to meet the
103     burden described in Subsection 73-3-3(5).
104          (b) If otherwise proper, the state engineer may approve a permanent or temporary
105     change application upon one or more of the following conditions:
106          (i) for part of the water involved;
107          (ii) that the applicant acquire a conflicting right; or
108          (iii) that the applicant provide and implement a plan approved by the state engineer to
109     mitigate impairment of an existing right.
110          (c) (i) There is a rebuttable presumption of quantity impairment, as defined in
111     Subsection 73-3-3(1), to the extent that, for a period of at least seven consecutive years, a
112     portion of the right identified in a change application has not been:
113          (A) diverted from the approved point of diversion; [and] or

114          (B) beneficially used at the approved place of use.
115          (ii) The rebuttable presumption described in Subsection (6)(c)(i) does not apply if the
116     beneficial use requirement is excused by:
117          (A) Subsection 73-1-4(2)(e);
118          (B) an approved nonuse application under Subsection 73-1-4(2)(b);
119          (C) Subsection 73-3-30(7); or
120          (D) the passage of time under Subsection 73-1-4(2)(c)(i).
121          (d) The state engineer may not consider quantity impairment based on the conditions
122     described in Subsection (6)(c) unless the issue is raised in a:
123          (i) timely protest that identifies which of the protestant's existing rights the protestant
124     reasonably believes will experience quantity impairment; or
125          (ii) written notice provided by the state engineer to the applicant within 90 days after
126     the change application is filed.
127          (e) The written notice described in Subsection (6)(d)(ii) shall:
128          (i) specifically identify an existing right the state engineer reasonably believes may
129     experience quantity impairment; and
130          (ii) be mailed to the owner of an identified right, as shown by the state engineer's
131     records, if the owner has not protested the change application.
132          (f) The state engineer is not required to include all rights the state engineer believes
133     may be impaired by the proposed change in the written notice described in Subsection
134     (6)(d)(ii).
135          (g) The owner of a right who receives the written notice described in Subsection
136     (6)(d)(ii) may not become a party to the administrative proceeding if the owner has not filed a
137     timely protest.
138          (h) If a change applicant, all protestants, and all persons identified by the state engineer
139     under Subsection (6)(d)(ii) come to a written agreement regarding how the issue of quantity
140     impairment shall be mitigated, the state engineer may incorporate the terms of the agreement
141     into a change application approval.

142