This document includes Conference Committee Amendments incorporated into the bill on Thu, Mar 2, 2023 at 6:42 PM by pflowers.
Senator Derrin R. Owens proposes the following substitute bill:


1     
ENERGY SECURITY AMENDMENTS

2     
2023 GENERAL SESSION

3     
STATE OF UTAH

4     
Chief Sponsor: Ken Ivory

5     
Senate Sponsor: Derrin R. Owens

6     

7     LONG TITLE
8     General Description:
9          This bill modifies provisions related to the regulation of energy.
10     Highlighted Provisions:
11          This bill:
12          ▸     defines terms;
13          ▸     requires a project entity to provide notice to the Legislative Management Committee
14     180 days prior to:
15               •     the disposal or sale of any project entity asset; and
16               •     the decommissioning of a coal-powered electrical generation facility;
17          ▸     requires the Office of Energy Development to:
18               •     conduct a study of a project entity; and
19               •     report the results of the study to the Public Utilities, Energy, and Technology
20     Interim Committee;
21          ▸     modifies the state energy policy to promote the state's energy independence by:
22               •     promoting the use of energy resources generated within the state; and
23               •     promoting the use of clean energy sources by considering the emissions of an
24     energy resource throughout the entire life cycle of the energy resource;
25          ▸     provides legislative findings;

26          ▸     requires a qualified utility to inform the Office of the Attorney General when a
27     proposed federal regulation would result in the early retirement of an electrical
28     generation facility;
29          ▸     authorizes the Office of the Attorney General to take any action to defend the state's
30     interests with respect to electricity generation by a qualified utility facing a
31     proposed federal regulation that would result in the early retirement of an electrical
32     generation facility; and
33          ▸     makes technical changes.
34     Money Appropriated in this Bill:
35          None
36     Other Special Clauses:
37          This bill provides a special effective date.
38     Utah Code Sections Affected:
39     AMENDS:
40          79-6-301, as last amended by Laws of Utah 2021, Chapter 383 and renumbered and
41     amended by Laws of Utah 2021, Chapter 280
42     ENACTS:
43          11-13-318, Utah Code Annotated 1953
44          11-13-319, Utah Code Annotated 1953
45          79-6-303, Utah Code Annotated 1953
46     

47     Be it enacted by the Legislature of the state of Utah:
48          Section 1. Section 11-13-318 is enacted to read:
49          11-13-318. Notice of decommissioning or disposal of project entity assets.
50          (1) As used in this section,
51          (a) "Disposal" means the sale, transfer, or other disposition of a project entity's assets.
52          (b) (i) "Project entity asset" means a project entity's:
53          (A) land;
54          (B) buildings; or
55          (C) essential equipment, including turbines, generators, transformers, and transmission
56     lines.

57          (ii) "Project entity asset" does not include an asset that is not essential for the
58     generation of electricity in the project entity's coal-powered electrical generation facility.
59          (2) Ĥ→ [
Before July 1, 2025, a] A ←Ĥ project entity shall provide a notice of
59a     decommissioning or
60     disposal to the Legislative Management Committee at least 180 days before:
61          (a) the disposal of any project entity assets; or
62          (b) the decommissioning of the project entity's coal-powered electrical generation
63     facility.
64          (3) The notice of decommissioning or disposal described in Subsection (2) shall
65     include:
66          (a) the date of the intended decommissioning or disposal;
67          (b) a description of the project entity's coal-powered electrical generation facility
68     intended for decommissioning or any project entity asset intended for disposal; and
69          (c) the reasons for the decommissioning or disposal.
70          (4) Ĥ→ [
Before July 1, 2025, a] A ←Ĥ project entity may not intentionally prevent the
70a     functionality
71     of the project entity's existing coal-powered electrical generation facility.
72          (5) Notwithstanding the requirements in Subsections (2) through (4), a project entity
73     may take any action necessary to transition to a new electrical generation facility powered by
74     natural gas, hydrogen, or a combination of natural gas and hydrogen, including any action that
75     has been approved by a permitting authority.
76          Section 2. Section 11-13-319 is enacted to read:
77          11-13-319. Project entity continued operation study.
78          (1) The Office of Energy Development shall conduct a study to:
79          (a) evaluate all environmental regulations and permits to be filed to continue operation
80     of a project entity's existing coal-powered electrical generation facility;
81          (b) identify best available technology to implement additional environmental controls
82     for continued operation of a project entity's existing coal-powered electrical generation facility;
83          (c) identify the transmission capacity of the project entity;
84          (d) coordinate with state and local economic development agencies to evaluate
85     economic opportunities for continued use of a project entity's existing coal-powered electrical
86     generation facility;
87          (e) analyze the financial assets and liabilities of a project entity;

88          (f) identify the best interests of the local economies, local tax base, and the state in
89     relation to a project entity;
90          (g) evaluate the viability of the continued operation of a project entity's existing
91     coal-powered electrical generation facility:
92          (i) under ownership of the state; or
93          (ii) in a public private partnership; and
94          (h) identify the steps necessary for the state to obtain first right of refusal for ownership
95     of a project Ĥ→ entity's ←Ĥ existing coal-powered electrical generation facility.
96          (2) A project entity shall cooperate and provide timely assistance and information to
97     the Office of Energy Development in the preparation of the study described in Subsection (1).
98          (3) The Office of Energy Development shall report to the Public Utilities, Energy and
99     Technology Interim Committee and the Legislative Management Committee on or before the
100     Public Utilities, Energy, and Technology Interim Committee's September 2023 interim
101     committee meeting.
102          (4) The report described in Subsection (3) shall include:
103          (a) the results of the study described in Subsection (1);
104          (b) recommendations for continued operation of a project entity's existing
105     coal-powered electrical generation facility;
106          (c) environmental controls that need to be implemented for the continued operation of
107     a project entity's existing coal-powered electrical generation facility;
108          (d) recommendations to increase local and state tax revenue through the continued
109     operation of a project entity's existing coal-powered electrical generation facility; and
110          (e) recommendations for legislation to be introduced in the 2024 General Session to
111     enable the continued operation of a project entity's existing coal-powered electrical generation
112     facility.
113          Section 3. Section 79-6-301 is amended to read:
114          79-6-301. State energy policy.
115          (1) It is the policy of the state that:
116          (a) Utah shall have adequate, reliable, affordable, sustainable, and clean energy
117     resources;
118          (b) Utah [will] shall promote the development of:

119          (i) nonrenewable energy resources, including natural gas, coal, oil, oil shale, and oil
120     sands;
121          (ii) renewable energy resources, including geothermal, solar, wind, biomass, biofuel,
122     and hydroelectric;
123          (iii) nuclear power generation technologies certified for use by the United States
124     Nuclear Regulatory Commission including molten salt reactors producing medical isotopes;
125          (iv) alternative transportation fuels and technologies;
126          (v) infrastructure to facilitate energy development, diversified modes of transportation,
127     greater access to domestic and international markets for Utah's resources, and advanced
128     transmission systems;
129          (vi) energy storage, pumped storage, and other advanced energy systems, including
130     hydrogen from all sources;
131          (vii) electricity systems that can be controlled at the request of grid operators to meet
132     system load demands, to ensure an adequate supply of dispatchable energy generation
133     resources; and
134          (viii) increased refinery capacity;
135          (c) Utah [will] shall promote the development of resources and infrastructure sufficient
136     to meet the state's growing demand, while contributing to the regional and national energy
137     supply, thus reducing dependence on international energy sources;
138          (d) Utah [will] shall promote the development of resources, tools, and infrastructure to
139     enhance the state's ability to:
140          (i) respond effectively to significant disruptions to the state's energy generation, energy
141     delivery systems, or fuel supplies; [and]
142          (ii) maintain adequate supply, including reserves of proven and cost-effective
143     dispatchable electricity reserves to meet grid demand; and
144          (iii) ensure the state's energy independence by promoting the use of energy resources
145     generated within the state;
146          (e) Utah [will] shall allow market forces to drive prudent use of energy resources,
147     although incentives and other methods may be used to ensure the state's optimal development
148     and use of energy resources in the short- and long-term;
149          (f) Utah [will] shall pursue energy conservation, energy efficiency, and environmental

150     quality;
151          (g) Utah shall promote the development of a secure supply chain from resource
152     extraction to energy production and consumption;
153          [(g)] (h) (i) state regulatory processes should be streamlined to balance economic costs
154     with the level of review necessary to ensure protection of the state's various interests; and
155          (ii) where federal action is required, Utah will encourage expedited federal action and
156     will collaborate with federal agencies to expedite review;
157          [(h)] (i) Utah [will] shall maintain an environment that provides for stable consumer
158     prices that are as low as possible while providing producers and suppliers a fair return on
159     investment, recognizing that:
160          (i) economic prosperity is linked to the availability, reliability, and affordability of
161     consumer energy supplies; and
162          (ii) investment will occur only when adequate financial returns can be realized; [and]
163          [(i)] (j) Utah [will] shall promote training and education programs focused on
164     developing a comprehensive understanding of energy, including:
165          (i) programs addressing:
166          (A) energy conservation;
167          (B) energy efficiency;
168          (C) supply and demand; and
169          (D) energy related workforce development; and
170          (ii) energy education programs in grades [K-12.] kindergarten through grade 12; and
171          (k) Utah shall promote the use of clean energy sources by considering the emissions of
172     an energy resource throughout the entire life cycle of the energy resource.
173          (2) State agencies are encouraged to conduct agency activities consistent with
174     Subsection (1).
175          (3) A person may not file suit to challenge a state agency's action that is inconsistent
176     with Subsection (1).
177          Section 4. Section 79-6-303 is enacted to read:
178          79-6-303. Legislative findings -- Forced retirement of electrical generation
179     facilities.
180          (1) As used in this section:

181          (a) "Dispatchable" means available for use on demand and generally available to be
182     delivered at a time and quantity of the operator's choosing.
183          (b) "Electrical generation facility" means a facility that generates electricity for
184     provision to customers.
185          (c) "Forced retirement" means the closure of an electrical generation facility as a result
186     of a federal regulation that either directly mandates the closure of an electrical generation
187     facility or where the costs of compliance are so high as to effectively force the closure of an
188     electrical generation facility.
189          (d) "Qualified utility" means the same as that term is defined in Section 54-17-801.
190          (e) "Reliable" means supporting a system generally able to provide a continuous supply
191     of electricity at the proper voltage and frequency and the resiliency to withstand sudden or
192     unexpected disturbances.
193          (f) "Secure" means protected against disruption, tampering, and external interference.
194          (2) The Legislature finds that:
195          (a) affordable, reliable, dispatchable, and secure energy resources are important to the
196     health, safety, and welfare of the state's citizens;
197          (b) the state has invested substantial resources in the development of affordable,
198     reliable, dispatchable, and secure energy resources within the state;
199          (c) the early retirement of an electrical generation facility that provides affordable,
200     reliable, dispatchable, and secure energy is a threat to the health, safety, and welfare of the
201     state's citizens;
202          (d) the state's police powers, reserved to the state by the United States Constitution,
203     provide the state with sovereign authority to make and enforce laws for the protection of the
204     health, safety, and welfare of the state's citizens;
205          (e) the state has a duty to defend the production and supply of affordable, reliable,
206     dispatchable, and secure energy from external regulatory interference; and
207          (f) the state's sovereign authority with respect to the retirement of an electrical
208     generation facility for the protection of the health, safety, and welfare of the state's citizens is
209     primary and takes precedence over any attempt from an external regulatory body to mandate,
210     restrict, or influence the early retirement of an electrical generation facility in the state.
211          (3) A qualified utility that receives notice of any federal regulation that may result in

212     the forced retirement of the qualified utility's electrical generation facility shall inform the
213     Office of the Attorney General of the regulation within 30 days after the receipt of notice.
214          (4) After being informed as described in Subsection (3), the Office of the Attorney
215     General may take any action necessary to defend the interest of the state with respect to
216     electricity generation by the qualified utility, including filing an action in court or participating
217     in administrative proceedings.
218          Section 5. Effective date.
219          If approved by two-thirds of all the members elected to each house, this bill takes effect
220     upon approval by the governor, or the day following the constitutional time limit of Utah
221     Constitution, Article VII, Section 8, without the governor's signature, or in the case of a veto,
222     the date of veto override.