GROUNDBEARING EQUIPMENT REQUIREMENTS

2     
2023 GENERAL SESSION

3     
STATE OF UTAH

4     
Chief Sponsor: Calvin R. Musselman

5     
Senate Sponsor: ____________

6     

7     LONG TITLE
8     General Description:
9          This bill addresses construction groundbearing equipment requirements.
10     Highlighted Provisions:
11          This bill:
12          ▸     defines terms; and
13          ▸     requires a real property owner to:
14               •     obtain a geotechnical report before using groundbearing equipment as part of a
15     construction project; and
16               •     develop a solution to ensure groundbearing equipment soil and subgrade support
17     before using groundbearing equipment as part of the project.
18     Money Appropriated in this Bill:
19          None
20     Other Special Clauses:
21          None
22     Utah Code Sections Affected:
23     ENACTS:
24          15A-6-301, Utah Code Annotated 1953
25     

26     Be it enacted by the Legislature of the state of Utah:
27          Section 1. Section 15A-6-301 is enacted to read:

28     
Part 3. Groundbearing Equipment Requirements

29          15A-6-301. Groundbearing equipment geotechnical report.
30          (1) As used in this section, "groundbearing equipment" means a power-operated
31     machine used in construction, demolition, or excavation work.
32          (2) Before using groundbearing equipment for a construction project on real property,
33     the owner of the real property shall:
34          (a) obtain a geotechnical report detailing whether the existing soil and subgrade
35     conditions of the real property are able to support the groundbearing equipment in addition to
36     the other equipment or materials to be used or structures to be built as part of the project; and
37          (b) if the owner determines from the geotechnical report that the soil and subgrade
38     conditions on the real property are unable to support the groundbearing equipment in addition
39     to the other equipment, materials, and structures, develop or design a solution to ensure the
40     support.