Senator Derrin R. Owens proposes the following substitute bill:


1     
CLEAN ENERGY AMENDMENTS

2     
2024 GENERAL SESSION

3     
STATE OF UTAH

4     
Chief Sponsor: Carl R. Albrecht

5     
Senate Sponsor: Derrin R. Owens

6     

7     LONG TITLE
8     General Description:
9          This bill modifies provisions relating to clean energy.
10     Highlighted Provisions:
11          This bill:
12          ▸     changes the term renewable to clean where appropriate in statute.
13     Money Appropriated in this Bill:
14          None
15     Other Special Clauses:
16          This bill provides a coordination clause.
17     Utah Code Sections Affected:
18     AMENDS:
19          10-9a-401, as last amended by Laws of Utah 2023, Chapter 88
20          10-19-102, as last amended by Laws of Utah 2010, Chapters 119, 125 and 268
21          10-19-201, as enacted by Laws of Utah 2008, Chapter 374
22          10-19-202, as enacted by Laws of Utah 2008, Chapter 374
23          10-19-301, as enacted by Laws of Utah 2008, Chapter 374
24          11-13-218, as last amended by Laws of Utah 2016, Chapter 371
25          11-17-2, as last amended by Laws of Utah 2020, Chapter 354

26          11-42a-102, as last amended by Laws of Utah 2023, Chapter 16
27          11-42a-103, as enacted by Laws of Utah 2017, Chapter 470
28          11-58-102, as last amended by Laws of Utah 2023, Chapters 16, 259
29          11-58-203, as last amended by Laws of Utah 2022, Chapter 82
30          11-59-102, as last amended by Laws of Utah 2023, Chapters 16, 263
31          11-59-202, as last amended by Laws of Utah 2023, Chapter 139
32          11-65-101, as last amended by Laws of Utah 2023, Chapter 16
33          11-65-203, as enacted by Laws of Utah 2022, Chapter 59
34          11-68-201, as renumbered and amended by Laws of Utah 2023, Chapter 502
35          17-27a-401, as last amended by Laws of Utah 2023, Chapters 34, 88
36          17-50-335, as last amended by Laws of Utah 2020, Chapter 354
37          17B-1-202, as last amended by Laws of Utah 2023, Chapter 15
38          17D-1-201, as last amended by Laws of Utah 2021, Chapter 339
39          54-17-502, as enacted by Laws of Utah 2008, Chapter 374
40          54-17-601, as last amended by Laws of Utah 2010, Chapters 119, 125 and 268
41          54-17-602, as enacted by Laws of Utah 2008, Chapter 374
42          54-17-604, as enacted by Laws of Utah 2008, Chapter 374
43          54-17-605, as enacted by Laws of Utah 2008, Chapter 374
44          54-17-801, as last amended by Laws of Utah 2017, Chapter 409
45          54-17-802, as enacted by Laws of Utah 2012, Chapter 182
46          54-17-803, as enacted by Laws of Utah 2012, Chapter 182
47          54-17-804, as enacted by Laws of Utah 2012, Chapter 182
48          54-17-805, as enacted by Laws of Utah 2012, Chapter 182
49          54-17-806, as last amended by Laws of Utah 2020, Chapter 126
50          54-17-807, as last amended by Laws of Utah 2019, Chapter 136
51          54-17-901, as enacted by Laws of Utah 2019, Chapter 471
52          54-17-902, as enacted by Laws of Utah 2019, Chapter 471
53          54-17-903, as enacted by Laws of Utah 2019, Chapter 471
54          54-17-904, as enacted by Laws of Utah 2019, Chapter 471
55          54-17-905, as enacted by Laws of Utah 2019, Chapter 471
56          54-17-906, as enacted by Laws of Utah 2019, Chapter 471

57          54-17-908, as enacted by Laws of Utah 2019, Chapter 471
58          59-2-102, as last amended by Laws of Utah 2023, Chapter 16
59          59-7-614, as last amended by Laws of Utah 2023, Chapter 482
60          59-10-1014, as last amended by Laws of Utah 2021, Chapter 280
61          59-10-1106, as last amended by Laws of Utah 2023, Chapter 482
62          63A-5b-702, as last amended by Laws of Utah 2021, Chapter 382
63          63H-1-201, as last amended by Laws of Utah 2022, Chapter 274
64          63L-11-304, as renumbered and amended by Laws of Utah 2021, Chapter 382
65          79-3-202, as last amended by Laws of Utah 2022, Chapter 216
66     Utah Code Sections Affected By Coordination Clause:
67          11-42a-102, as last amended by Laws of Utah 2023, Chapter 16
68     

69     Be it enacted by the Legislature of the state of Utah:
70          Section 1. Section 10-9a-401 is amended to read:
71          10-9a-401. General plan required -- Content.
72          (1) To accomplish the purposes of this chapter, a municipality shall prepare and adopt
73     a comprehensive, long-range general plan for:
74          (a) present and future needs of the municipality; and
75          (b) growth and development of all or any part of the land within the municipality.
76          (2) The general plan may provide for:
77          (a) health, general welfare, safety, energy conservation, transportation, prosperity, civic
78     activities, aesthetics, and recreational, educational, and cultural opportunities;
79          (b) the reduction of the waste of physical, financial, or human resources that result
80     from either excessive congestion or excessive scattering of population;
81          (c) the efficient and economical use, conservation, and production of the supply of:
82          (i) food and water; and
83          (ii) drainage, sanitary, and other facilities and resources;
84          (d) the use of energy conservation and solar and [renewable] clean energy resources;
85          (e) the protection of urban development;
86          (f) if the municipality is a town, the protection or promotion of moderate income
87     housing;

88          (g) the protection and promotion of air quality;
89          (h) historic preservation;
90          (i) identifying future uses of land that are likely to require an expansion or significant
91     modification of services or facilities provided by an affected entity; and
92          (j) an official map.
93          (3) (a) The general plan of a specified municipality, as defined in Section 10-9a-408,
94     shall include a moderate income housing element that meets the requirements of Subsection
95     10-9a-403(2)(a)(iii).
96          (b) (i) This Subsection (3)(b) applies to a municipality that is not a specified
97     municipality as of January 1, 2023.
98          (ii) As of January 1, if a municipality described in Subsection (3)(b)(i) changes from
99     one class to another or grows in population to qualify as a specified municipality as defined in
100     Section 10-9a-408, the municipality shall amend the municipality's general plan to comply with
101     Subsection (3)(a) on or before August 1 of the first calendar year beginning on January 1 in
102     which the municipality qualifies as a specified municipality.
103          (4) Subject to Subsection 10-9a-403(2), the municipality may determine the
104     comprehensiveness, extent, and format of the general plan.
105          (5) Except for a city of the fifth class or a town, on or before December 31, 2025, a
106     municipality that has a general plan that does not include a water use and preservation element
107     that complies with Section 10-9a-403 shall amend the municipality's general plan to comply
108     with Section 10-9a-403.
109          Section 2. Section 10-19-102 is amended to read:
110          10-19-102. Definitions.
111          As used in this chapter:
112          (1) "Adjusted retail electric sales" means the total kilowatt-hours of retail electric sales
113     of a municipal electric utility to customers in this state in a calendar year, reduced by:
114          (a) the amount of those kilowatt-hours attributable to electricity generated or purchased
115     in that calendar year from qualifying zero carbon emissions generation and qualifying carbon
116     sequestration generation;
117          (b) the amount of those kilowatt-hours attributable to electricity generated or purchased
118     in that calendar year from generation located within the geographic boundary of the Western

119     Electricity Coordinating Council that derives its energy from one or more of the following but
120     that does not satisfy the definition of a [renewable] clean energy source or that otherwise has
121     not been used to satisfy Subsection 10-19-201(1):
122          (i) wind energy;
123          (ii) solar photovoltaic and solar thermal energy;
124          (iii) wave, tidal, and ocean thermal energy;
125          (iv) except for combustion of wood that has been treated with chemical preservatives
126     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
127     byproducts, including:
128          (A) organic waste;
129          (B) forest or rangeland woody debris from harvesting or thinning conducted to improve
130     forest or rangeland ecological health and to reduce wildfire risk;
131          (C) agricultural residues;
132          (D) dedicated energy crops; and
133          (E) landfill gas or biogas produced from organic matter, wastewater, anaerobic
134     digesters, or municipal solid waste;
135          (v) geothermal energy;
136          (vi) hydro-electric energy; or
137          (vii) waste gas and waste heat capture or recovery; and
138          (c) the number of kilowatt-hours attributable to reductions in retail sales in that
139     calendar year from activities or programs promoting electric energy efficiency or conservation
140     or more efficient management of electric energy load.
141          (2) "Amount of kilowatt-hours attributable to electricity generated or purchased in that
142     calendar year from qualifying carbon sequestration generation," for qualifying carbon
143     sequestration generation, means the kilowatt-hours supplied by a facility during the calendar
144     year multiplied by the ratio of the amount of carbon dioxide captured from the facility and
145     sequestered to the sum of the amount of carbon dioxide captured from the facility and
146     sequestered plus the amount of carbon dioxide emitted from the facility during the same
147     calendar year.
148          (3) "Banked renewable energy certificate" means a bundled or unbundled renewable
149     energy certificate that is:

150          (a) not used in a calendar year to comply with this part or with a renewable energy
151     program in another state; and
152          (b) carried forward into a subsequent year.
153          (4) "Bundled renewable energy certificate" means a renewable energy certificate for
154     qualifying electricity that is acquired:
155          (a) by a municipal electric utility by a trade, purchase, or other transfer of electricity
156     that includes the renewable energy attributes of, or certificate that is issued for, the electricity;
157     or
158          (b) by a municipal electric utility by generating the electricity for which the renewable
159     energy certificate is issued.
160          (5) "Clean energy source" means:
161          (a) an electric generation facility or generation capability or upgrade that becomes
162     operational on or after January 1, 1995, that derives energy from one or more of the following:
163          (i) wind energy;
164          (ii) solar photovoltaic and solar thermal energy;
165          (iii) wave, tidal, and ocean thermal energy;
166          (iv) except for combustion of wood that has been treated with chemical preservatives
167     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
168     byproducts, including:
169          (A) organic waste;
170          (B) forest or rangeland woody debris from harvesting or thinning conducted to improve
171     forest or rangeland ecological health and to reduce wildfire risk;
172          (C) agricultural residues;
173          (D) dedicated energy crops; and
174          (E) landfill gas or biogas produced from organic matter, wastewater, anaerobic
175     digesters, or municipal solid waste;
176          (v) geothermal energy located outside the state;
177          (vi) waste gas and waste heat capture or recovery, including methane gas from:
178          (A) an abandoned coal mine; or
179          (B) a coal degassing operation associated with a state-approved mine permit;
180          (vii) efficiency upgrades to a hydroelectric facility, without regard to the date upon

181     which the facility became operational, if the upgrades become operational on or after January
182     1, 1995;
183          (viii) a compressed air energy storage process, if:
184          (A) the process used to compress the air is a renewable energy source and the
185     associated renewable energy certificates are retired for the purpose of the compressed air
186     energy storage process; or
187          (B) equivalent renewable energy certificates are obtained and retired for the purpose of
188     the compressed air energy storage process;
189          (ix) municipal solid waste;
190          (x) nuclear fuel; or
191          (xi) carbon capture utilization and sequestration;
192          (b) any of the following:
193          (i) up to 50 average megawatts of electricity per year per municipal electric utility from
194     a certified low-impact hydroelectric facility, without regard to the date upon which the facility
195     becomes operational, if the facility is certified as a low-impact hydroelectric facility on or after
196     January 1, 1995, by a national certification organization;
197          (ii) geothermal energy if located within the state, without regard to the date upon which
198     the facility becomes operational; and
199          (iii) hydroelectric energy if located within the state, without regard to the date upon
200     which the facility becomes operational;
201          (c) hydrogen gas derived from any source of energy described in Subsection (5)(a) or
202     (b);
203          (d) if an electric generation facility employs multiple energy sources, that portion of the
204     electricity generated that is attributable to energy sources described in Subsections (5)(a)
205     through (c); and
206          (e) any of the following located in the state and owned by a user of energy:
207          (i) a demand side management measure, as defined by Subsection 54-7-12.8(1) with
208     the quantity of renewable energy certificates to which the user is entitled determined by the
209     equivalent energy saved by the measure;
210          (ii) a solar thermal system that reduces the consumption of fossil fuels, with the
211     quantity of renewable energy certificates to which the user is entitled determined by the

212     equivalent kilowatt-hours saved, except to the extent the commission determines otherwise
213     with respect to net-metered energy;
214          (iii) a solar photovoltaic system that reduces the consumption of fossil fuels with the
215     quantity of renewable energy certificates to which the user is entitled determined by the total
216     production of the system, except to the extent the commission determines otherwise with
217     respect to net-metered energy;
218          (iv) a hydroelectric or geothermal facility, with the quantity of renewable energy
219     certificates to which the user is entitled determined by the total production of the facility,
220     except to the extent the commission determines otherwise with respect to net-metered energy;
221          (v) a waste gas or waste heat capture or recovery system other than from a combined
222     cycle combustion turbine that does not use waste gas or waste heat, with the quantity of
223     renewable energy certificates to which the user is entitled determined by the total production of
224     the system, except to the extent the commission determines otherwise with respect to
225     net-metered energy; and
226          (vi) the station use of solar thermal energy, solar photovoltaic energy, hydroelectric
227     energy, geothermal energy, waste gas, or waste heat capture and recovery.
228          [(5)] (6) "Commission" means the Public Service Commission.
229          [(6)] (7) "Municipal electric utility" means any municipality that owns, operates,
230     controls, or manages a facility that provides electric power for a retail customer, whether
231     domestic, commercial, industrial, or otherwise.
232          [(7)] (8) "Qualifying carbon sequestration generation" means a fossil-fueled generating
233     facility located within the geographic boundary of the Western Electricity Coordinating
234     Council that:
235          (a) becomes operational or is retrofitted on or after January 1, 2008; and
236          (b) reduces carbon dioxide emissions into the atmosphere through permanent
237     geological sequestration or through other verifiably permanent reductions in carbon dioxide
238     emissions through the use of technology.
239          [(8)] (9) "Qualifying electricity" means electricity generated on or after January 1, 1995
240     from a renewable energy source if:
241          (a) (i) the [renewable] clean energy source is located within the geographic boundary of
242     the Western Electricity Coordinating Council; or

243          (ii) the qualifying electricity is delivered to the transmission system of a municipal
244     electric utility or a delivery point designated by the municipal electric utility for the purpose of
245     subsequent delivery to the municipal electric utility; and
246          (b) the [renewable] clean energy attributes of the electricity are not traded, sold,
247     transferred, or otherwise used to satisfy another state's renewable energy program.
248          [(9)] (10) "Qualifying zero carbon emissions generation":
249          (a) means a generation facility located within the geographic boundary of the Western
250     Electricity Coordinating Council that:
251          (i) becomes operational on or after January 1, 2008; and
252          (ii) does not produce carbon as a byproduct of the generation process;
253          (b) includes generation powered by nuclear fuel; and
254          (c) does not include [renewable] clean energy sources used to satisfy a target
255     established under Section 10-19-201.
256          [(10)] (11) "Renewable energy certificate" means a certificate issued in accordance
257     with the requirements of Sections 10-19-202 and 54-17-603.
258          [(11) "Renewable energy source" means:]
259          [(a) an electric generation facility or generation capability or upgrade that becomes
260     operational on or after January 1, 1995 that derives its energy from one or more of the
261     following:]
262          [(i) wind energy;]
263          [(ii) solar photovoltaic and solar thermal energy;]
264          [(iii) wave, tidal, and ocean thermal energy;]
265          [(iv) except for combustion of wood that has been treated with chemical preservatives
266     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
267     byproducts, including:]
268          [(A) organic waste;]
269          [(B) forest or rangeland woody debris from harvesting or thinning conducted to
270     improve forest or rangeland ecological health and to reduce wildfire risk;]
271          [(C) agricultural residues;]
272          [(D) dedicated energy crops; and]
273          [(E) landfill gas or biogas produced from organic matter, wastewater, anaerobic

274     digesters, or municipal solid waste;]
275          [(v) geothermal energy located outside the state;]
276          [(vi) waste gas and waste heat capture or recovery whether or not it is renewable,
277     including methane gas from:]
278          [(A) an abandoned coal mine; or]
279          [(B) a coal degassing operation associated with a state-approved mine permit;]
280          [(vii) efficiency upgrades to a hydroelectric facility, without regard to the date upon
281     which the facility became operational, if the upgrades become operational on or after January
282     1, 1995;]
283          [(viii) a compressed air energy storage process, if:]
284          [(A) the process used to compress the air is a renewable energy source and the
285     associated renewable energy certificates are retired for the purpose of the compressed air
286     energy storage process; or]
287          [(B) equivalent renewable energy certificates are obtained and retired for the purpose
288     of the compressed air energy storage process; or]
289          [(ix) municipal solid waste;]
290          [(b) any of the following:]
291          [(i) up to 50 average megawatts of electricity per year per municipal electric utility
292     from a certified low-impact hydroelectric facility, without regard to the date upon which the
293     facility becomes operational, if the facility is certified as a low-impact hydroelectric facility on
294     or after January 1, 1995, by a national certification organization;]
295          [(ii) geothermal energy if located within the state, without regard to the date upon
296     which the facility becomes operational; and]
297          [(iii) hydroelectric energy if located within the state, without regard to the date upon
298     which the facility becomes operational;]
299          [(c) hydrogen gas derived from any source of energy described in Subsection (11)(a) or
300     (b);]
301          [(d) if an electric generation facility employs multiple energy sources, that portion of
302     the electricity generated that is attributable to energy sources described in Subsections (11)(a)
303     through (c); and]
304          [(e) any of the following located in the state and owned by a user of energy:]

305          [(i) a demand side management measure, as defined by Subsection 54-7-12.8(1) with
306     the quantity of renewable energy certificates to which the user is entitled determined by the
307     equivalent energy saved by the measure;]
308          [(ii) a solar thermal system that reduces the consumption of fossil fuels, with the
309     quantity of renewable energy certificates to which the user is entitled determined by the
310     equivalent kilowatt-hours saved, except to the extent the commission determines otherwise
311     with respect to net-metered energy;]
312          [(iii) a solar photovoltaic system that reduces the consumption of fossil fuels with the
313     quantity of renewable energy certificates to which the user is entitled determined by the total
314     production of the system, except to the extent the commission determines otherwise with
315     respect to net-metered energy;]
316          [(iv) a hydroelectric or geothermal facility, with the quantity of renewable energy
317     certificates to which the user is entitled determined by the total production of the facility,
318     except to the extent the commission determines otherwise with respect to net-metered energy;]
319          [(v) a waste gas or waste heat capture or recovery system other than from a combined
320     cycle combustion turbine that does not use waste gas or waste heat, with the quantity of
321     renewable energy certificates to which the user is entitled determined by the total production of
322     the system, except to the extent the commission determines otherwise with respect to
323     net-metered energy; and]
324          [(vi) the station use of solar thermal energy, solar photovoltaic energy, hydroelectric
325     energy, geothermal energy, waste gas, or waste heat capture and recovery.]
326          (12) "Unbundled renewable energy certificate" means a renewable energy certificate
327     associated with:
328          (a) qualifying electricity that is acquired by a municipal electric utility or other person
329     by trade, purchase, or other transfer without acquiring the electricity for which the certificate
330     was issued; or
331          (b) activities listed in Subsection [(11)(e)] (5)(e).
332          Section 3. Section 10-19-201 is amended to read:
333          10-19-201. Target amount of qualifying electricity -- Renewable energy certificate
334     -- Cost-effectiveness.
335          (1) (a) To the extent that it is cost-effective to do so, beginning in 2025 the annual

336     retail electric sales in this state of each municipal electric utility shall consist of qualifying
337     electricity or renewable energy certificates in an amount equal to at least 20% of adjusted retail
338     electric sales.
339          (b) The amount under Subsection (1)(a) is computed based upon adjusted retail sales
340     for the calendar year commencing 36 months before the first day of the year for which the
341     target calculated under Subsection (1)(a) applies.
342          (c) Notwithstanding Subsections (1)(a) and (b) an increase in the annual target from
343     one year to the next is limited to the greater of:
344          (i) 17,500 megawatt-hours; or
345          (ii) 20% of the prior year's amount under Subsections (1)(a) and (b).
346          (2) Cost-effectiveness under Subsection (1) is determined using any criteria applicable
347     to the municipal electric utility's acquisition of a significant energy resource established by the
348     municipality's legislative body.
349          (3) This section does not require a municipal electric utility to:
350          (a) substitute qualifying electricity for electricity from a generation source owned or
351     contractually committed, or from a contractual commitment for a power purchase;
352          (b) enter into any additional electric sales commitment or any other arrangement for the
353     sale or other disposition of electricity that is not already, or would not be, entered into by the
354     municipal electric utility; or
355          (c) acquire qualifying electricity in excess of its adjusted retail electric sales.
356          (4) A municipal electrical corporation may combine the following to meet Subsection
357     (1):
358          (a) qualifying electricity from a [renewable] clean energy source owned by the
359     municipal electric utility;
360          (b) qualifying electricity acquired by the municipal electric utility through trade, power
361     purchase, or other transfer; and
362          (c) a bundled or unbundled renewable energy certificate, including a banked renewable
363     energy certificate.
364          (5) To meet Subsection (1), a municipal electric utility may also count:
365          (a) qualifying electricity generated or acquired or renewable energy certificates
366     acquired for a program permitting the municipal electric utility's customers to voluntarily

367     contribute to a renewable energy source; and
368          (b) electricity allocated to this state that is produced by a hydroelectric facility
369     becoming operational after December 31, 2007, if the hydroelectric facility is located in any
370     state in which the municipal electric utility, or the interlocal entity with which the municipal
371     electric utility has a contract, provides electric service.
372          Section 4. Section 10-19-202 is amended to read:
373          10-19-202. Renewable energy certificate -- Use to satisfy other requirements.
374          (1) A municipal electric utility may buy, sell, trade, or otherwise transfer a renewable
375     energy certificate issued or recognized under Section 54-17-603.
376          (2) For the purpose of satisfying Subsection 10-19-201(1) and the issuance of a
377     renewable energy certificate under Section 54-17-603:
378          (a) a [renewable] clean energy source located in this state that derives its energy from
379     solar photovoltaic and solar thermal energy shall be credited for 2.4 kilowatt-hours of
380     qualifying electricity for each 1.0 kilowatt-hour generated; and
381          (b) if two or more municipal electric utilities jointly own a renewable energy resource,
382     each municipal electric utility shall be credited with 1.0 kilowatt-hour of qualifying electricity
383     for 1.0 kilowatt-hour of the renewable energy resource allocated to the municipal electric utility
384     by contract, unless the contract otherwise provides.
385          (3) A renewable energy certificate:
386          (a) may be used only once to satisfy Subsection 10-19-201(1);
387          (b) may be used to satisfy Subsection 10-19-201(1) and the qualifying electricity on
388     which the renewable energy certificate is based may be used to satisfy any federal renewable
389     energy requirement; and
390          (c) may not be used if it has been used to satisfy any other state's renewable energy
391     requirement.
392          Section 5. Section 10-19-301 is amended to read:
393          10-19-301. Plans and reports.
394          (1) A municipal electric utility shall develop and maintain a plan for implementing
395     Subsection 10-19-201(1).
396          (2) A progress report concerning a plan under Subsection (1) shall be filed with the
397     municipality's legislative body by January 1 of each of the years 2010, 2015, 2020, and 2024.

398          (3) The progress report under Subsection (2) shall contain:
399          (a) the actual and projected amount of qualifying electricity through 2025;
400          (b) the source of qualifying electricity;
401          (c) an estimate of the cost of achieving the target;
402          (d) a discussion of conditions impacting the [renewable] clean energy source and
403     qualifying electricity markets; and
404          (e) any recommendation for a suggested legislative or program change.
405          (4) The plan and progress report required by Subsections (1) and (2) may include
406     procedures that will be used by the municipal electric utility to identify and select any
407     cost-effective [renewable] clean energy resource and qualifying electricity.
408          (5) By July 1, 2026, the municipal electric utility shall file a final progress report
409     demonstrating:
410          (a) how Subsection 10-19-201(1) is satisfied for the year 2025; or
411          (b) the reason why Subsection 10-19-201(1) is not satisfied for the year 2025, if it is
412     not satisfied.
413          (6) The plan and any progress report filed under this section shall be publicly available
414     at the municipal legislative body's office.
415          Section 6. Section 11-13-218 is amended to read:
416          11-13-218. Authority of public agencies or interlocal entities to issue bonds --
417     Applicable provisions.
418          (1) A public agency may, in the same manner as it may issue bonds for its individual
419     acquisition of a facility or improvement or for constructing, improving, or extending a facility
420     or improvement, issue bonds to:
421          (a) acquire an interest in a jointly owned facility or improvement, a combination of a
422     jointly owned facility or improvement, or any other facility or improvement; or
423          (b) pay all or part of the cost of constructing, improving, or extending a jointly owned
424     facility or improvement, a combination of a jointly owned facility or improvement, or any other
425     facility or improvement.
426          (2) (a) An interlocal entity may issue bonds or notes under a resolution, trust indenture,
427     or other security instrument for the purpose of:
428          (i) financing its facilities or improvements; or

429          (ii) providing for or financing an energy efficiency upgrade, a [renewable] clean energy
430     system, or electric vehicle charging infrastructure in accordance with Title 11, Chapter 42,
431     Assessment Area Act.
432          (b) The bonds or notes may be sold at public or private sale, mature at such times and
433     bear interest at such rates, and have such other terms and security as the entity determines.
434          (c) The bonds or notes described in this Subsection (2) are not a debt of any public
435     agency that is a party to the agreement.
436          (3) The governing board may, by resolution, delegate to one or more officers of the
437     interlocal entity or to a committee of designated members of the governing board the authority
438     to:
439          (a) in accordance with and within the parameters set forth in the resolution, approve the
440     final interest rate, price, principal amount, maturity, redemption features, or other terms of a
441     bond or note; and
442          (b) approve and execute all documents relating to the issuance of the bond or note.
443          (4) Bonds and notes issued under this chapter are declared to be negotiable instruments
444     and their form and substance need not comply with the Uniform Commercial Code.
445          (5) (a) An interlocal entity shall issue bonds in accordance with, as applicable:
446          (i) Chapter 14, Local Government Bonding Act;
447          (ii) Chapter 27, Utah Refunding Bond Act;
448          (iii) this chapter; or
449          (iv) any other provision of state law that authorizes issuance of bonds by a public body.
450          (b) An interlocal entity is a public body as defined in Section 11-30-2.
451          Section 7. Section 11-17-2 is amended to read:
452          11-17-2. Definitions.
453          As used in this chapter:
454          (1) "Bonds" means bonds, notes, or other evidences of indebtedness.
455          (2) "Clean energy system" means a product, system, device, or interacting group of
456     devices that is permanently affixed to real property and that produces energy from clean
457     resources, including:
458          (a) a photovoltaic system;
459          (b) a solar thermal system;

460          (c) a wind system;
461          (d) a geothermal system, including:
462          (i) a direct-use system; or
463          (ii) a ground source heat pump system;
464          (e) a micro-hydro system;
465          (f) nuclear fuel;
466          (g) carbon capture utilization and sequestration; or
467          (h) another clean energy system approved by the governing body.
468          [(2)] (3) "Energy efficiency upgrade" means an improvement that is permanently
469     affixed to real property and that is designed to reduce energy consumption, including:
470          (a) insulation in:
471          (i) a wall, ceiling, roof, floor, or foundation; or
472          (ii) a heating or cooling distribution system;
473          (b) an insulated window or door, including:
474          (i) a storm window or door;
475          (ii) a multiglazed window or door;
476          (iii) a heat-absorbing window or door;
477          (iv) a heat-reflective glazed and coated window or door;
478          (v) additional window or door glazing;
479          (vi) a window or door with reduced glass area; or
480          (vii) other window or door modifications that reduce energy loss;
481          (c) an automatic energy control system;
482          (d) in a building or a central plant, a heating, ventilation, or air conditioning and
483     distribution system;
484          (e) caulking or weatherstripping;
485          (f) a light fixture that does not increase the overall illumination of a building unless an
486     increase is necessary to conform with the applicable building code;
487          (g) an energy recovery system;
488          (h) a daylighting system;
489          (i) measures to reduce the consumption of water, through conservation or more
490     efficient use of water, including:

491          (i) installation of a low-flow toilet or showerhead;
492          (ii) installation of a timer or timing system for a hot water heater; or
493          (iii) installation of a rain catchment system; or
494          (j) any other modified, installed, or remodeled fixture that is approved as a utility
495     cost-savings measure by the governing body.
496          [(3)] (4) "Finance" or "financing" includes the issuing of bonds by a municipality,
497     county, or state university for the purpose of using a portion, or all or substantially all of the
498     proceeds to pay for or to reimburse the user, lender, or the user or lender's designee for the
499     costs of the acquisition of facilities of a project, or to create funds for the project itself where
500     appropriate, whether these costs are incurred by the municipality, the county, the state
501     university, the user, or a designee of the user. If title to or in these facilities at all times remains
502     in the user, the bonds of the municipality or county shall be secured by a pledge of one or more
503     notes, debentures, bonds, other secured or unsecured debt obligations of the user or lender, or
504     the sinking fund or other arrangement as in the judgment of the governing body is appropriate
505     for the purpose of assuring repayment of the bond obligations to investors in accordance with
506     their terms.
507          [(4)] (5) "Governing body" means:
508          (a) for a county, city, town, or metro township, the legislative body of the county, city,
509     town, or metro township;
510          (b) for the military installation development authority created in Section 63H-1-201,
511     the board, as defined in Section 63H-1-102;
512          (c) for a state university except as provided in Subsection [(4)(d)] (5)(d), the board or
513     body having the control and supervision of the state university; and
514          (d) for a nonprofit corporation or foundation created by and operating under the
515     auspices of a state university, the board of directors or board of trustees of that corporation or
516     foundation.
517          [(5)] (6) (a) "Industrial park" means land, including all necessary rights, appurtenances,
518     easements, and franchises relating to it, acquired and developed by a municipality, county, or
519     state university for the establishment and location of a series of sites for plants and other
520     buildings for industrial, distribution, and wholesale use.
521          (b) "Industrial park" includes the development of the land for an industrial park under

522     this chapter or the acquisition and provision of water, sewerage, drainage, street, road,
523     sidewalk, curb, gutter, street lighting, electrical distribution, railroad, or docking facilities, or
524     any combination of them, but only to the extent that these facilities are incidental to the use of
525     the land as an industrial park.
526          [(6)] (7) "Lender" means a trust company, savings bank, savings and loan association,
527     bank, credit union, or any other lending institution that lends, loans, or leases proceeds of a
528     financing to the user or a user's designee.
529          [(7)] (8) "Mortgage" means a mortgage, trust deed, or other security device.
530          [(8)] (9) "Municipality" means any incorporated city, town, or metro township in the
531     state, including cities or towns operating under home rule charters.
532          [(9)] (10) "Pollution" means any form of environmental pollution including water
533     pollution, air pollution, pollution caused by solid waste disposal, thermal pollution, radiation
534     contamination, or noise pollution.
535          [(10)] (11) (a) "Project" means:
536          (i) an industrial park, land, interest in land, building, structure, facility, system, fixture,
537     improvement, appurtenance, machinery, equipment, or any combination of them, whether or
538     not in existence or under construction:
539          (A) that is suitable for industrial, manufacturing, warehousing, research, business, and
540     professional office building facilities, commercial, shopping services, food, lodging, low
541     income rental housing, recreational, or any other business purposes;
542          (B) that is suitable to provide services to the general public;
543          (C) that is suitable for use by any corporation, person, or entity engaged in health care
544     services, including hospitals, nursing homes, extended care facilities, facilities for the care of
545     persons with a physical or mental disability, and administrative and support facilities; or
546          (D) that is suitable for use by a state university for the purpose of aiding in the
547     accomplishment of its authorized academic, scientific, engineering, technical, and economic
548     development functions;
549          (ii) any land, interest in land, building, structure, facility, system, fixture, improvement,
550     appurtenance, machinery, equipment, or any combination of them, used by any individual,
551     partnership, firm, company, corporation, public utility, association, trust, estate, political
552     subdivision, state agency, or any other legal entity, or its legal representative, agent, or assigns,

553     for the reduction, abatement, or prevention of pollution, including the removal or treatment of
554     any substance in process material, if that material would cause pollution if used without the
555     removal or treatment;
556          (iii) an energy efficiency upgrade;
557          (iv) a [renewable] clean energy system;
558          (v) facilities, machinery, or equipment, the manufacturing and financing of which will
559     maintain or enlarge domestic or foreign markets for Utah industrial products; or
560          (vi) any economic development or new venture investment fund to be raised other than
561     from:
562          (A) municipal or county general fund money;
563          (B) money raised under the taxing power of any county or municipality; or
564          (C) money raised against the general credit of any county or municipality.
565          (b) "Project" does not include any property, real, personal, or mixed, for the purpose of
566     the construction, reconstruction, improvement, or maintenance of a public utility as defined in
567     Section 54-2-1.
568          [(11) "Renewable energy system" means a product, system, device, or interacting group
569     of devices that is permanently affixed to real property and that produces energy from renewable
570     resources, including:]
571          [(a) a photovoltaic system;]
572          [(b) a solar thermal system;]
573          [(c) a wind system;]
574          [(d) a geothermal system, including:]
575          [(i) a direct-use system; or]
576          [(ii) a ground source heat pump system;]
577          [(e) a micro-hydro system; or]
578          [(f) another renewable energy system approved by the governing body.]
579          (12) "State university" means an institution of higher education as described in Section
580     53B-2-101 and includes any nonprofit corporation or foundation created by and operating
581     under their authority.
582          (13) "User" means the person, whether natural or corporate, who will occupy, operate,
583     maintain, and employ the facilities of, or manage and administer a project after the financing,

584     acquisition, or construction of it, whether as owner, manager, purchaser, lessee, or otherwise.
585     The following section is affected by a coordination clause at the end of this bill.
586          Section 8. Section 11-42a-102 is amended to read:
587          11-42a-102. Definitions.
588          (1) "Air quality standards" means that a vehicle's emissions are equal to or cleaner than
589     the standards established in bin 4 Table S04-1, of 40 C.F.R. 86.1811-04(c)(6).
590          (2) (a) "Assessment" means the assessment that a local entity or the C-PACE district
591     levies on private property under this chapter to cover the costs of an energy efficiency upgrade,
592     a [renewable] clean energy system, or an electric vehicle charging infrastructure.
593          (b) "Assessment" does not constitute a property tax but shares the same priority lien as
594     a property tax.
595          (3) "Assessment fund" means a special fund that a local entity establishes under
596     Section 11-42a-206.
597          (4) "Benefitted property" means private property within an energy assessment area that
598     directly benefits from improvements.
599          (5) "Bond" means an assessment bond and a refunding assessment bond.
600          (6) (a) "Clean energy system" means a product, system, device, or interacting group of
601     devices that is permanently affixed to commercial or industrial real property not located in the
602     certified service area of a distribution electrical cooperative, as that term is defined in Section
603     54-2-1, and:
604          (i) produces energy from clean resources, including:
605          (A) a photovoltaic system;
606          (B) a solar thermal system;
607          (C) a wind system;
608          (D) a geothermal system, including a generation system, a direct-use system, or a
609     ground source heat pump system;
610          (E) a micro-hydro system;
611          (F) a biofuel system;
612          (G) energy derived from nuclear fuel; or
613          (H) any other clean source system that the governing body of the local entity approves;
614          (ii) stores energy, including:

615          (A) a battery storage system; or
616          (B) any other energy storing system that the governing body or chief executive officer
617     of a local entity approves; or
618          (iii) any improvement that relates physically or functionally to any of the products,
619     systems, or devices listed in Subsection (6)(a)(i) or (ii).
620          (b) "Clean energy system" does not include a system described in Subsection (6)(a)(i)
621     if the system provides energy to property outside the energy assessment area, unless the system:
622          (i) (A) existed before the creation of the energy assessment area; and
623          (B) beginning before January 1, 2017, provides energy to property outside of the area
624     that became the energy assessment area; or
625          (ii) provides energy to property outside the energy assessment area under an agreement
626     with a public electrical utility that is substantially similar to agreements for other renewable
627     energy systems that are not funded under this chapter.
628          [(6)] (7) (a) "Commercial or industrial real property" means private real property used
629     directly or indirectly or held for one of the following purposes or activities, regardless of
630     whether the purpose or activity is for profit:
631          (i) commercial;
632          (ii) mining;
633          (iii) agricultural;
634          (iv) industrial;
635          (v) manufacturing;
636          (vi) trade;
637          (vii) professional;
638          (viii) a private or public club;
639          (ix) a lodge;
640          (x) a business; or
641          (xi) a similar purpose.
642          (b) "Commercial or industrial real property" includes:
643          (i) private real property that is used as or held for dwelling purposes and contains:
644          (A) more than four rental units; or
645          (B) one or more owner-occupied or rental condominium units affiliated with a hotel;

646     and
647          (ii) real property owned by:
648          (A) the military installation development authority, created in Section 63H-1-201; or
649          (B) the Utah Inland Port Authority, created in Section 11-58-201.
650          [(7)] (8) "Contract price" means:
651          (a) up to 100% of the cost of installing, acquiring, refinancing, or reimbursing for an
652     improvement, as determined by the owner of the property benefitting from the improvement; or
653          (b) the amount payable to one or more contractors for the assessment, design,
654     engineering, inspection, and construction of an improvement.
655          [(8)] (9) "C-PACE" means commercial property assessed clean energy.
656          [(9)] (10) "C-PACE district" means the statewide authority established in Section
657     11-42a-106 to implement the C-PACE Act in collaboration with governing bodies, under the
658     direction of OED.
659          [(10)] (11) "Electric vehicle charging infrastructure" means equipment that is:
660          (a) permanently affixed to commercial or industrial real property; and
661          (b) designed to deliver electric energy to a qualifying electric vehicle or a qualifying
662     plug-in hybrid vehicle.
663          [(11)] (12) "Energy assessment area" means an area:
664          (a) within the jurisdictional boundaries of a local entity that approves an energy
665     assessment area or, if the C-PACE district or a state interlocal entity levies the assessment, the
666     C-PACE district or the state interlocal entity;
667          (b) containing only the commercial or industrial real property of owners who have
668     voluntarily consented to an assessment under this chapter for the purpose of financing the costs
669     of improvements that benefit property within the energy assessment area; and
670          (c) in which the proposed benefitted properties in the area are:
671          (i) contiguous; or
672          (ii) located on one or more contiguous or adjacent tracts of land that would be
673     contiguous or adjacent property but for an intervening right-of-way, including a sidewalk,
674     street, road, fixed guideway, or waterway.
675          [(12)] (13) "Energy assessment bond" means a bond:
676          (a) issued under Section 11-42a-401; and

677          (b) payable in part or in whole from assessments levied in an energy assessment area.
678          [(13)] (14) "Energy assessment lien" means a lien on property within an energy
679     assessment area that arises from the levy of an assessment in accordance with Section
680     11-42a-301.
681          [(14)] (15) "Energy assessment ordinance" means an ordinance that a local entity
682     adopts under Section 11-42a-201 that:
683          (a) designates an energy assessment area;
684          (b) levies an assessment on benefitted property within the energy assessment area; and
685          (c) if applicable, authorizes the issuance of energy assessment bonds.
686          [(15)] (16) "Energy assessment resolution" means one or more resolutions adopted by a
687     local entity under Section 11-42a-201 that:
688          (a) designates an energy assessment area;
689          (b) levies an assessment on benefitted property within the energy assessment area; and
690          (c) if applicable, authorizes the issuance of energy assessment bonds.
691          [(16)] (17) "Energy efficiency upgrade" means an improvement that is:
692          (a) permanently affixed to commercial or industrial real property; and
693          (b) designed to reduce energy or water consumption, including:
694          (i) insulation in:
695          (A) a wall, roof, floor, or foundation; or
696          (B) a heating and cooling distribution system;
697          (ii) a window or door, including:
698          (A) a storm window or door;
699          (B) a multiglazed window or door;
700          (C) a heat-absorbing window or door;
701          (D) a heat-reflective glazed and coated window or door;
702          (E) additional window or door glazing;
703          (F) a window or door with reduced glass area; or
704          (G) other window or door modifications;
705          (iii) an automatic energy control system;
706          (iv) in a building or a central plant, a heating, ventilation, or air conditioning and
707     distribution system;

708          (v) caulk or weatherstripping;
709          (vi) a light fixture that does not increase the overall illumination of a building, unless
710     an increase is necessary to conform with the applicable building code;
711          (vii) an energy recovery system;
712          (viii) a daylighting system;
713          (ix) measures to reduce the consumption of water, through conservation or more
714     efficient use of water, including installation of:
715          (A) low-flow toilets and showerheads;
716          (B) timer or timing systems for a hot water heater; or
717          (C) rain catchment systems;
718          (x) a modified, installed, or remodeled fixture that is approved as a utility cost-saving
719     measure by the governing body or executive of a local entity;
720          (xi) measures or other improvements to effect seismic upgrades;
721          (xii) structures, measures, or other improvements to provide automated parking or
722     parking that reduces land use;
723          (xiii) the extension of an existing natural gas distribution company line;
724          (xiv) an energy efficient elevator, escalator, or other vertical transport device;
725          (xv) any other improvement that the governing body or executive of a local entity
726     approves as an energy efficiency upgrade; or
727          (xvi) any improvement that relates physically or functionally to any of the
728     improvements listed in Subsections [(16)(b)(i)] (17)(b)(i) through (xv).
729          [(17)] (18) "Governing body" means:
730          (a) for a county, city, town, or metro township, the legislative body of the county, city,
731     town, or metro township;
732          (b) for a special district, the board of trustees of the special district;
733          (c) for a special service district:
734          (i) if no administrative control board has been appointed under Section 17D-1-301, the
735     legislative body of the county, city, town, or metro township that established the special service
736     district; or
737          (ii) if an administrative control board has been appointed under Section 17D-1-301, the
738     administrative control board of the special service district;

739          (d) for the military installation development authority created in Section 63H-1-201,
740     the board, as that term is defined in Section 63H-1-102; and
741          (e) for the Utah Inland Port Authority, created in Section 11-58-201, the board, as
742     defined in Section 11-58-102.
743          [(18)] (19) "Improvement" means a publicly or privately owned energy efficiency
744     upgrade, [renewable] clean energy system, or electric vehicle charging infrastructure that:
745          (a) a property owner has requested; or
746          (b) has been or is being installed on a property for the benefit of the property owner.
747          [(19)] (20) "Incidental refunding costs" means any costs of issuing a refunding
748     assessment bond and calling, retiring, or paying prior bonds, including:
749          (a) legal and accounting fees;
750          (b) charges of financial advisors, escrow agents, certified public accountant verification
751     entities, and trustees;
752          (c) underwriting discount costs, printing costs, and the costs of giving notice;
753          (d) any premium necessary in the calling or retiring of prior bonds;
754          (e) fees to be paid to the local entity to issue the refunding assessment bond and to
755     refund the outstanding prior bonds;
756          (f) any other costs that the governing body determines are necessary and proper to incur
757     in connection with the issuance of a refunding assessment bond; and
758          (g) any interest on the prior bonds that is required to be paid in connection with the
759     issuance of the refunding assessment bond.
760          [(20)] (21) "Installment payment date" means the date on which an installment
761     payment of an assessment is payable.
762          [(21)] (22) "Jurisdictional boundaries" means:
763          (a) for the C-PACE district or any state interlocal entity, the boundaries of the state;
764     and
765          (b) for each local entity, the boundaries of the local entity.
766          [(22)] (23) (a) "Local entity" means:
767          (i) a county, city, town, or metro township;
768          (ii) a special service district, a special district, or an interlocal entity as that term is
769     defined in Section 11-13-103;

770          (iii) a state interlocal entity;
771          (iv) the military installation development authority, created in Section 63H-1-201;
772          (v) the Utah Inland Port Authority, created in Section 11-58-201; or
773          (vi) any political subdivision of the state.
774          (b) "Local entity" includes the C-PACE district solely in connection with:
775          (i) the designation of an energy assessment area;
776          (ii) the levying of an assessment; and
777          (iii) the assignment of an energy assessment lien to a third-party lender under Section
778     11-42a-302.
779          [(23)] (24) "Local entity obligations" means energy assessment bonds and refunding
780     assessment bonds that a local entity issues.
781          [(24)] (25) "OED" means the Office of Energy Development created in Section
782     79-6-401.
783          [(25)] (26) "OEM vehicle" means the same as that term is defined in Section 19-1-402.
784          [(26)] (27) "Overhead costs" means the actual costs incurred or the estimated costs to
785     be incurred in connection with an energy assessment area, including:
786          (a) appraisals, legal fees, filing fees, facilitation fees, and financial advisory charges;
787          (b) underwriting fees, placement fees, escrow fees, trustee fees, and paying agent fees;
788          (c) publishing and mailing costs;
789          (d) costs of levying an assessment;
790          (e) recording costs; and
791          (f) all other incidental costs.
792          [(27)] (28) "Parameters resolution" means a resolution or ordinance that a local entity
793     adopts in accordance with Section 11-42a-201.
794          [(28)] (29) "Prior bonds" means the energy assessment bonds refunded in part or in
795     whole by a refunding assessment bond.
796          [(29)] (30) "Prior energy assessment ordinance" means the ordinance levying the
797     assessments from which the prior bonds are payable.
798          [(30)] (31) "Prior energy assessment resolution" means the resolution levying the
799     assessments from which the prior bonds are payable.
800          [(31)] (32) "Property" includes real property and any interest in real property, including

801     water rights and leasehold rights.
802          [(32)] (33) "Public electrical utility" means a large-scale electric utility as that term is
803     defined in Section 54-2-1.
804          [(33)] (34) "Qualifying electric vehicle" means a vehicle that:
805          (a) meets air quality standards;
806          (b) is not fueled by natural gas;
807          (c) draws propulsion energy from a battery with at least 10 kilowatt hours of capacity;
808     and
809          (d) is an OEM vehicle except that the vehicle is fueled by a fuel described in
810     Subsection [(33)(c)] (34)(c).
811          [(34)] (35) "Qualifying plug-in hybrid vehicle" means a vehicle that:
812          (a) meets air quality standards;
813          (b) is not fueled by natural gas or propane;
814          (c) has a battery capacity that meets or exceeds the battery capacity described in
815     Subsection 30D(b)(3), Internal Revenue Code; and
816          (d) is fueled by a combination of electricity and:
817          (i) diesel fuel;
818          (ii) gasoline; or
819          (iii) a mixture of gasoline and ethanol.
820          [(35)] (36) "Reduced payment obligation" means the full obligation of an owner of
821     property within an energy assessment area to pay an assessment levied on the property after the
822     local entity has reduced the assessment because of the issuance of a refunding assessment
823     bond, in accordance with Section 11-42a-403.
824          [(36)] (37) "Refunding assessment bond" means an assessment bond that a local entity
825     issues under Section 11-42a-403 to refund, in part or in whole, energy assessment bonds.
826          [(37) (a) "Renewable energy system" means a product, system, device, or interacting
827     group of devices that is permanently affixed to commercial or industrial real property not
828     located in the certified service area of a distribution electrical cooperative, as that term is
829     defined in Section 54-2-1, and:]
830          [(i) produces energy from renewable resources, including:]
831          [(A) a photovoltaic system;]

832          [(B) a solar thermal system;]
833          [(C) a wind system;]
834          [(D) a geothermal system, including a generation system, a direct-use system, or a
835     ground source heat pump system;]
836          [(E) a microhydro system;]
837          [(F) a biofuel system; or]
838          [(G) any other renewable source system that the governing body of the local entity
839     approves;]
840          [(ii) stores energy, including:]
841          [(A) a battery storage system; or]
842          [(B) any other energy storing system that the governing body or chief executive officer
843     of a local entity approves; or]
844          [(iii) any improvement that relates physically or functionally to any of the products,
845     systems, or devices listed in Subsection (37)(a)(i) or (ii).]
846          [(b) "Renewable energy system" does not include a system described in Subsection
847     (37)(a)(i) if the system provides energy to property outside the energy assessment area, unless
848     the system:]
849          [(i) (A) existed before the creation of the energy assessment area; and]
850          [(B) beginning before January 1, 2017, provides energy to property outside of the area
851     that became the energy assessment area; or]
852          [(ii) provides energy to property outside the energy assessment area under an
853     agreement with a public electrical utility that is substantially similar to agreements for other
854     renewable energy systems that are not funded under this chapter.]
855          (38) "Special district" means a special district under Title 17B, Limited Purpose Local
856     Government Entities - Special Districts.
857          (39) "Special service district" means the same as that term is defined in Section
858     17D-1-102.
859          (40) "State interlocal entity" means:
860          (a) an interlocal entity created under Chapter 13, Interlocal Cooperation Act, by two or
861     more counties, cities, towns, or metro townships that collectively represent at least a majority
862     of the state's population; or

863          (b) an entity that another state authorized, before January 1, 2017, to issue bonds,
864     notes, or other obligations or refunding obligations to finance or refinance projects in the state.
865          (41) "Third-party lender" means a trust company, savings bank, savings and loan
866     association, bank, credit union, or any other entity that provides loans directly to property
867     owners for improvements authorized under this chapter.
868          Section 9. Section 11-42a-103 is amended to read:
869          11-42a-103. No limitation on other local entity powers -- Conflict with other
870     statutory provisions.
871          (1) This chapter does not limit a power that a local entity has under other applicable
872     law to:
873          (a) make an improvement or provide a service;
874          (b) create a district;
875          (c) levy an assessment or tax; or
876          (d) issue a bond or a refunding bond.
877          (2) If there is a conflict between a provision of this chapter and any other statutory
878     provision, the provision of this chapter governs.
879          (3) After January 1, 2017, a local entity or the C-PACE district may create an energy
880     assessment area within the certificated service territory of a public electrical utility for the
881     installation of a [renewable] clean energy system with a nameplate rating of:
882          (a) no more than 2.0 megawatts; or
883          (b) more than 2.0 megawatts to serve load that the public electrical utility does not
884     already serve.
885          Section 10. Section 11-58-102 is amended to read:
886          11-58-102. Definitions.
887          As used in this chapter:
888          (1) "Authority" means the Utah Inland Port Authority, created in Section 11-58-201.
889          (2) "Authority jurisdictional land" means land within the authority boundary
890     delineated:
891          (a) in the electronic shapefile that is the electronic component of H.B. 2001, Utah
892     Inland Port Authority Amendments, 2018 Second Special Session; and
893          (b) beginning April 1, 2020, as provided in Subsection 11-58-202(3).

894          (3) "Base taxable value" means:
895          (a) (i) except as provided in Subsection (3)(a)(ii), for a project area that consists of the
896     authority jurisdictional land, the taxable value of authority jurisdictional land in calendar year
897     2018; and
898          (ii) for an area described in Section 11-58-600.7, the taxable value of that area in
899     calendar year 2017; or
900          (b) for a project area that consists of land outside the authority jurisdictional land, the
901     taxable value of property within any portion of a project area, as designated by board
902     resolution, from which the property tax differential will be collected, as shown upon the
903     assessment roll last equalized before the year in which the authority adopts a project area plan
904     for that area.
905          (4) "Board" means the authority's governing body, created in Section 11-58-301.
906          (5) "Business plan" means a plan designed to facilitate, encourage, and bring about
907     development of the authority jurisdictional land to achieve the goals and objectives described
908     in Subsection 11-58-203(1), including the development and establishment of an inland port.
909          (6) "Contaminated land" means land:
910          (a) within a project area; and
911          (b) that contains hazardous materials, as defined in Section 19-6-302, hazardous
912     substances, as defined in Section 19-6-302, or landfill material on, in, or under the land.
913          (7) "Development" means:
914          (a) the demolition, construction, reconstruction, modification, expansion, or
915     improvement of a building, utility, infrastructure, landscape, parking lot, park, trail,
916     recreational amenity, or other facility, including public infrastructure and improvements; and
917          (b) the planning of, arranging for, or participation in any of the activities listed in
918     Subsection (7)(a).
919          (8) "Development project" means a project for the development of land within a
920     project area.
921          (9) "Inland port" means one or more sites that:
922          (a) contain multimodal facilities, intermodal facilities, or other facilities that:
923          (i) are related but may be separately owned and managed; and
924          (ii) together are intended to:

925          (A) allow global trade to be processed and altered by value-added services as goods
926     move through the supply chain;
927          (B) provide a regional merging point for transportation modes for the distribution of
928     goods to and from ports and other locations in other regions;
929          (C) provide cargo-handling services to allow freight consolidation and distribution,
930     temporary storage, customs clearance, and connection between transport modes; and
931          (D) provide international logistics and distribution services, including freight
932     forwarding, customs brokerage, integrated logistics, and information systems; and
933          (b) may include a satellite customs clearance terminal, an intermodal facility, a
934     customs pre-clearance for international trade, or other facilities that facilitate, encourage, and
935     enhance regional, national, and international trade.
936          (10) "Inland port use" means a use of land:
937          (a) for an inland port;
938          (b) that directly implements or furthers the purposes of an inland port, as stated in
939     Subsection (9);
940          (c) that complements or supports the purposes of an inland port, as stated in Subsection
941     (9); or
942          (d) that depends upon the presence of the inland port for the viability of the use.
943          (11) "Intermodal facility" means a facility for transferring containerized cargo between
944     rail, truck, air, or other transportation modes.
945          (12) "Landfill material" means garbage, waste, debris, or other materials disposed of or
946     placed in a landfill.
947          (13) "Multimodal facility" means a hub or other facility for trade combining any
948     combination of rail, trucking, air cargo, and other transportation services.
949          (14) "Nonvoting member" means an individual appointed as a member of the board
950     under Subsection 11-58-302(3) who does not have the power to vote on matters of authority
951     business.
952          (15) "Project area" means:
953          (a) the authority jurisdictional land, subject to Section 11-58-605; or
954          (b) land outside the authority jurisdictional land, whether consisting of a single
955     contiguous area or multiple noncontiguous areas, described in a project area plan or draft

956     project area plan, where the development project set forth in the project area plan or draft
957     project area plan takes place or is proposed to take place.
958          (16) "Project area budget" means a multiyear projection of annual or cumulative
959     revenues and expenses and other fiscal matters pertaining to the project area.
960          (17) "Project area plan" means a written plan that, after its effective date, guides and
961     controls the development within a project area.
962          (18) "Property tax" includes a privilege tax and each levy on an ad valorem basis on
963     tangible or intangible personal or real property.
964          (19) "Property tax differential":
965          (a) means the difference between:
966          (i) the amount of property tax revenues generated each tax year by all taxing entities
967     from a project area, using the current assessed value of the property; and
968          (ii) the amount of property tax revenues that would be generated from that same area
969     using the base taxable value of the property; and
970          (b) does not include property tax revenue from:
971          (i) a county additional property tax or multicounty assessing and collecting levy
972     imposed in accordance with Section 59-2-1602;
973          (ii) a judgment levy imposed by a taxing entity under Section 59-2-1328 or 59-2-1330;
974     or
975          (iii) a levy imposed by a taxing entity under Section 11-14-310 to pay for a general
976     obligation bond.
977          (20) "Public entity" means:
978          (a) the state, including each department, division, or other agency of the state; or
979          (b) a county, city, town, metro township, school district, special district, special service
980     district, interlocal cooperation entity, community reinvestment agency, or other political
981     subdivision of the state, including the authority.
982          (21) (a) "Public infrastructure and improvements" means infrastructure, improvements,
983     facilities, or buildings that:
984          (i) (A) benefit the public and are owned by a public entity or a utility; or
985          (B) benefit the public and are publicly maintained or operated by a public entity; or
986          (ii) (A) are privately owned;

987          (B) benefit the public;
988          (C) as determined by the board, provide a substantial benefit to the development and
989     operation of a project area; and
990          (D) are built according to applicable county or municipal design and safety standards.
991          (b) "Public infrastructure and improvements" includes:
992          (i) facilities, lines, or systems that provide:
993          (A) water, chilled water, or steam; or
994          (B) sewer, storm drainage, natural gas, electricity, energy storage, [renewable] clean
995     energy, microgrids, or telecommunications service;
996          (ii) streets, roads, curb, gutter, sidewalk, walkways, solid waste facilities, parking
997     facilities, rail lines, intermodal facilities, multimodal facilities, and public transportation
998     facilities;
999          (iii) an inland port; and
1000          (iv) infrastructure, improvements, facilities, or buildings that are developed as part of a
1001     remediation project.
1002          (22) "Remediation" includes:
1003          (a) activities for the cleanup, rehabilitation, and development of contaminated land;
1004     and
1005          (b) acquiring an interest in land within a remediation project area.
1006          (23) "Remediation differential" means property tax differential generated from a
1007     remediation project area.
1008          (24) "Remediation project" means a project for the remediation of contaminated land
1009     that:
1010          (a) is owned by:
1011          (i) the state or a department, division, or other instrumentality of the state;
1012          (ii) an independent entity, as defined in Section 63E-1-102; or
1013          (iii) a political subdivision of the state; and
1014          (b) became contaminated land before the owner described in Subsection (24)(a)
1015     obtained ownership of the land.
1016          (25) "Remediation project area" means a project area consisting of contaminated land
1017     that is or is expected to become the subject of a remediation project.

1018          (26) "Shapefile" means the digital vector storage format for storing geometric location
1019     and associated attribute information.
1020          (27) "Taxable value" means the value of property as shown on the last equalized
1021     assessment roll.
1022          (28) "Taxing entity":
1023          (a) means a public entity that levies a tax on property within a project area; and
1024          (b) does not include a public infrastructure district that the authority creates under Title
1025     17D, Chapter 4, Public Infrastructure District Act.
1026          (29) "Voting member" means an individual appointed or designated as a member of the
1027     board under Subsection 11-58-302(2).
1028          Section 11. Section 11-58-203 is amended to read:
1029          11-58-203. Policies and objectives of the authority -- Additional duties of the
1030     authority.
1031          (1) The policies and objectives of the authority are to:
1032          (a) maximize long-term economic benefits to the area, the region, and the state;
1033          (b) maximize the creation of high-quality jobs;
1034          (c) respect and maintain sensitivity to the unique natural environment of areas in
1035     proximity to the authority jurisdictional land and land in other authority project areas;
1036          (d) improve air quality and minimize resource use;
1037          (e) respect existing land use and other agreements and arrangements between property
1038     owners within the authority jurisdictional land and within other authority project areas and
1039     applicable governmental authorities;
1040          (f) promote and encourage development and uses that are compatible with or
1041     complement uses in areas in proximity to the authority jurisdictional land or land in other
1042     authority project areas;
1043          (g) take advantage of the authority jurisdictional land's strategic location and other
1044     features, including the proximity to transportation and other infrastructure and facilities, that
1045     make the authority jurisdictional land attractive to:
1046          (i) businesses that engage in regional, national, or international trade; and
1047          (ii) businesses that complement businesses engaged in regional, national, or
1048     international trade;

1049          (h) facilitate the transportation of goods;
1050          (i) coordinate trade-related opportunities to export Utah products nationally and
1051     internationally;
1052          (j) support and promote land uses on the authority jurisdictional land and land in other
1053     authority project areas that generate economic development, including rural economic
1054     development;
1055          (k) establish a project of regional significance;
1056          (l) facilitate an intermodal facility;
1057          (m) support uses of the authority jurisdictional land for inland port uses, including
1058     warehousing, light manufacturing, and distribution facilities;
1059          (n) facilitate an increase in trade in the region and in global commerce;
1060          (o) promote the development of facilities that help connect local businesses to potential
1061     foreign markets for exporting or that increase foreign direct investment;
1062          (p) encourage all class 5 though 8 designated truck traffic entering the authority
1063     jurisdictional land to meet the heavy-duty highway compression-ignition diesel engine and
1064     urban bus exhaust emission standards for year 2007 and later;
1065          (q) encourage the development and use of cost-efficient [renewable] clean energy in
1066     project areas;
1067          (r) aggressively pursue world-class businesses that employ cutting-edge technologies to
1068     locate within a project area; and
1069          (s) pursue land remediation and development opportunities for publicly owned land to
1070     add value to a project area.
1071          (2) In fulfilling its duties and responsibilities relating to the development of the
1072     authority jurisdictional land and land in other authority project areas and to achieve and
1073     implement the development policies and objectives under Subsection (1), the authority shall:
1074          (a) work to identify funding sources, including federal, state, and local government
1075     funding and private funding, for capital improvement projects in and around the authority
1076     jurisdictional land and land in other authority project areas and for an inland port;
1077          (b) review and identify land use and zoning policies and practices to recommend to
1078     municipal land use policymakers and administrators that are consistent with and will help to
1079     achieve:

1080          (i) the policies and objectives stated in Subsection (1); and
1081          (ii) the mutual goals of the state and local governments that have authority
1082     jurisdictional land with their boundaries with respect to the authority jurisdictional land;
1083          (c) consult and coordinate with other applicable governmental entities to improve and
1084     enhance transportation and other infrastructure and facilities in order to maximize the potential
1085     of the authority jurisdictional land to attract, retain, and service users who will help maximize
1086     the long-term economic benefit to the state; and
1087          (d) pursue policies that the board determines are designed to avoid or minimize
1088     negative environmental impacts of development.
1089          (3) The board may consider the emissions profile of road, yard, or rail vehicles:
1090          (a) in determining access by those vehicles to facilities that the authority owns or
1091     finances; or
1092          (b) in setting fees applicable to those vehicles for the use of facilities that the authority
1093     owns or finances.
1094          Section 12. Section 11-59-102 is amended to read:
1095          11-59-102. Definitions.
1096          As used in this chapter:
1097          (1) "Authority" means the Point of the Mountain State Land Authority, created in
1098     Section 11-59-201.
1099          (2) "Board" means the authority's board, created in Section 11-59-301.
1100          (3) "Development":
1101          (a) means the construction, reconstruction, modification, expansion, or improvement of
1102     a building, utility, infrastructure, landscape, parking lot, park, trail, recreational amenity, or
1103     other facility, including:
1104          (i) the demolition or preservation or repurposing of a building, infrastructure, or other
1105     facility;
1106          (ii) surveying, testing, locating existing utilities and other infrastructure, and other
1107     preliminary site work; and
1108          (iii) any associated planning, design, engineering, and related activities; and
1109          (b) includes all activities associated with:
1110          (i) marketing and business recruiting activities and efforts;

1111          (ii) leasing, or selling or otherwise disposing of, all or any part of the point of the
1112     mountain state land; and
1113          (iii) planning and funding for mass transit infrastructure to service the point of the
1114     mountain state land.
1115          (4) "Facilities division" means the Division of Facilities Construction and
1116     Management, created in Section 63A-5b-301.
1117          (5) "New correctional facility" means the state correctional facility being developed in
1118     Salt Lake City to replace the state correctional facility in Draper.
1119          (6) "Point of the mountain state land" means the approximately 700 acres of
1120     state-owned land in Draper, including land used for the operation of a state correctional facility
1121     until completion of the new correctional facility and state-owned land in the vicinity of the
1122     current state correctional facility.
1123          (7) "Public entity" means:
1124          (a) the state, including each department, division, or other agency of the state; or
1125          (b) a county, city, town, metro township, school district, special district, special service
1126     district, interlocal cooperation entity, community reinvestment agency, or other political
1127     subdivision of the state, including the authority.
1128          (8) "Publicly owned infrastructure and improvements":
1129          (a) means infrastructure, improvements, facilities, or buildings that:
1130          (i) benefit the public; and
1131          (ii) (A) are owned by a public entity or a utility; or
1132          (B) are publicly maintained or operated by a public entity; and
1133          (b) includes:
1134          (i) facilities, lines, or systems that provide:
1135          (A) water, chilled water, or steam; or
1136          (B) sewer, storm drainage, natural gas, electricity, energy storage, [renewable] clean
1137     energy, microgrids, or telecommunications service;
1138          (ii) streets, roads, curb, gutter, sidewalk, walkways, solid waste facilities, parking
1139     facilities, and public transportation facilities; and
1140          (iii) greenspace, parks, trails, recreational amenities, or other similar facilities.
1141          (9) "Taxing entity" means the same as that term is defined in Section 59-2-102.

1142          Section 13. Section 11-59-202 is amended to read:
1143          11-59-202. Authority powers.
1144          (1) The authority may:
1145          (a) as provided in this chapter, plan, manage, and implement the development of the
1146     point of the mountain state land, including the ongoing operation of facilities on the point of
1147     the mountain state land;
1148          (b) undertake, or engage a consultant to undertake, any study, effort, or activity the
1149     board considers appropriate to assist or inform the board about any aspect of the proposed
1150     development of the point of the mountain state land, including the best development model and
1151     financial projections relevant to the authority's efforts to fulfill its duties and responsibilities
1152     under this section and Section 11-59-203;
1153          (c) sue and be sued;
1154          (d) enter into contracts generally, including a contract for the sharing of records under
1155     Section 63G-2-206;
1156          (e) buy, obtain an option upon, or otherwise acquire any interest in real or personal
1157     property, as necessary to accomplish the duties and responsibilities of the authority, including
1158     an interest in real property, apart from point of the mountain state land, or personal property,
1159     outside point of the mountain state land, for publicly owned infrastructure and improvements,
1160     if the board considers the purchase, option, or other interest acquisition to be necessary for
1161     fulfilling the authority's development objectives;
1162          (f) sell, convey, grant, dispose of by gift, or otherwise dispose of any interest in real or
1163     personal property;
1164          (g) enter into a lease agreement on real or personal property, either as lessee or lessor;
1165          (h) provide for the development of the point of the mountain state land under one or
1166     more contracts, including the development of publicly owned infrastructure and improvements
1167     and other infrastructure and improvements on or related to the point of the mountain state land;
1168          (i) exercise powers and perform functions under a contract, as authorized in the
1169     contract;
1170          (j) accept financial or other assistance from any public or private source for the
1171     authority's activities, powers, and duties, and expend any funds so received for any of the
1172     purposes of this chapter;

1173          (k) borrow money, contract with, or accept financial or other assistance from the
1174     federal government, a public entity, or any other source for any of the purposes of this chapter
1175     and comply with any conditions of the loan, contract, or assistance;
1176          (l) subject to Subsection (2), issue bonds to finance the undertaking of any
1177     development objectives of the authority, including bonds under Title 11, Chapter 17, Utah
1178     Industrial Facilities and Development Act, and bonds under Title 11, Chapter 42, Assessment
1179     Area Act;
1180          (m) hire employees, including contract employees, in addition to or in place of staff
1181     provided under Section 11-59-304;
1182          (n) transact other business and exercise all other powers provided for in this chapter;
1183          (o) enter into a development agreement with a developer of some or all of the point of
1184     the mountain state land;
1185          (p) provide for or finance an energy efficiency upgrade, a [renewable] clean energy
1186     system, or electric vehicle charging infrastructure as defined in Section 11-42a-102, in
1187     accordance with Title 11, Chapter 42a, Commercial Property Assessed Clean Energy Act;
1188          (q) exercise powers and perform functions that the authority is authorized by statute to
1189     exercise or perform;
1190          (r) enter into one or more interlocal agreements under Title 11, Chapter 13, Interlocal
1191     Cooperation Act, with one or more local government entities for the delivery of services to the
1192     point of the mountain state land;
1193          (s) enter into an agreement with the federal government or an agency of the federal
1194     government, as the board considers necessary or advisable, to enable or assist the authority to
1195     exercise its powers or fulfill its duties and responsibilities under this chapter;
1196          (t) provide funding for the development of publicly owned infrastructure and
1197     improvements or other infrastructure and improvements on or related to the point of the
1198     mountain state land; and
1199          (u) impose impact fees under Title 11, Chapter 36a, Impact Fees Act, and other fees
1200     related to development activities.
1201          (2) The authority may not issue bonds under this part unless the board first:
1202          (a) adopts a parameters resolution for the bonds that sets forth:
1203          (i) the maximum:

1204          (A) amount of bonds;
1205          (B) term; and
1206          (C) interest rate; and
1207          (ii) the expected security for the bonds; and
1208          (b) submits the parameters resolution for review and recommendation to the State
1209     Finance Review Commission created in Section 63C-25-201.
1210          (3) No later than 60 days after the closing day of any bonds, the authority shall report
1211     the bonds issuance, including the amount of the bonds, terms, interest rate, and security, to:
1212          (a) the Executive Appropriations Committee; and
1213          (b) the State Finance Review Commission created in Section 63C-25-201.
1214          Section 14. Section 11-65-101 is amended to read:
1215          11-65-101. Definitions.
1216          As used in this chapter:
1217          (1) "Adjacent political subdivision" means a political subdivision of the state with a
1218     boundary that abuts the lake authority boundary or includes lake authority land.
1219          (2) "Board" means the lake authority's governing body, created in Section 11-65-301.
1220          (3) "Lake authority" means the Utah Lake Authority, created in Section 11-65-201.
1221          (4) "Lake authority boundary" means the boundary:
1222          (a) defined by recorded boundary settlement agreements between private landowners
1223     and the Division of Forestry, Fire, and State Lands; and
1224          (b) that separates privately owned land from Utah Lake sovereign land.
1225          (5) "Lake authority land" means land on the lake side of the lake authority boundary.
1226          (6) "Management" means work to coordinate and facilitate the improvement of Utah
1227     Lake, including work to enhance the long-term viability and health of Utah Lake and to
1228     produce economic, aesthetic, recreational, environmental, and other benefits for the state,
1229     consistent with the strategies, policies, and objectives described in this chapter.
1230          (7) "Management plan" means a plan to conceptualize, design, facilitate, coordinate,
1231     encourage, and bring about the management of the lake authority land to achieve the policies
1232     and objectives described in Section 11-65-203.
1233          (8) "Nonvoting member" means an individual appointed as a member of the board
1234     under Subsection 11-65-302(6) who does not have the power to vote on matters of lake

1235     authority business.
1236          (9) "Project area" means an area that is identified in a project area plan as the area
1237     where the management described in the project area plan will occur.
1238          (10) "Project area budget" means a multiyear projection of annual or cumulative
1239     revenues and expenses and other fiscal matters pertaining to a project area.
1240          (11) "Project area plan" means a written plan that, after the plan's effective date,
1241     manages activity within a project area within the scope of a management plan.
1242          (12) "Public entity" means:
1243          (a) the state, including each department, division, or other agency of the state; or
1244          (b) a county, city, town, metro township, school district, special district, special service
1245     district, interlocal cooperation entity, community reinvestment agency, or other political
1246     subdivision of the state.
1247          (13) "Publicly owned infrastructure and improvements":
1248          (a) means infrastructure, improvements, facilities, or buildings that:
1249          (i) benefit the public; and
1250          (ii) (A) are owned by a public entity or a utility; or
1251          (B) are publicly maintained or operated by a public entity; and
1252          (b) includes:
1253          (i) facilities, lines, or systems that provide:
1254          (A) water, chilled water, or steam; or
1255          (B) sewer, storm drainage, natural gas, electricity, energy storage, [renewable] clean
1256     energy, microgrids, or telecommunications service; and
1257          (ii) streets, roads, curbs, gutters, sidewalks, walkways, solid waste facilities, parking
1258     facilities, and public transportation facilities.
1259          (14) "Sovereign land" means land:
1260          (a) lying below the ordinary high water mark of a navigable body of water at the date
1261     of statehood; and
1262          (b) owned by the state by virtue of the state's sovereignty.
1263          (15) "Utah Lake" includes all waters of Utah Lake and all land, whether or not
1264     submerged under water, within the lake authority boundary.
1265          (16) "Voting member" means an individual appointed as a member of the board under

1266     Subsection 11-65-302(2).
1267          Section 15. Section 11-65-203 is amended to read:
1268          11-65-203. Policies and objectives of the lake authority -- Additional duties of the
1269     lake authority.
1270          (1) The policies and objectives of the lake authority are to:
1271          (a) protect and improve:
1272          (i) the quality of Utah Lake's water, consistent with the Clean Water Act, 33 U.S.C.
1273     Sec. 1251 et seq., and Title 19, Chapter 5, Water Quality Act;
1274          (ii) the beneficial and public trust uses of Utah Lake;
1275          (iii) Utah Lake's environmental quality; and
1276          (iv) the quality of Utah Lake's lakebed and sediments;
1277          (b) enhance the recreational opportunities afforded by Utah Lake;
1278          (c) enhance long-term economic benefits to the area, the region, and the state;
1279          (d) respect and maintain sensitivity to the unique natural environment of areas in and
1280     around the lake authority boundary;
1281          (e) improve air quality and minimize resource use;
1282          (f) comply with existing land use and other agreements and arrangements between
1283     property owners and applicable governmental authorities;
1284          (g) promote and encourage management and uses that are compatible with or
1285     complement the public trust and uses in areas in proximity to Utah Lake;
1286          (h) take advantage of Utah Lake's strategic location and other features that make Utah
1287     Lake attractive:
1288          (i) to residents for recreational purposes;
1289          (ii) for tourism and leisure; and
1290          (iii) for business opportunities;
1291          (i) encourage the development and use of cost-efficient [renewable] clean energy in
1292     project areas;
1293          (j) as consistent with applicable public trust, support and promote land uses on land
1294     within the lake authority boundary and land in adjacent political subdivisions that generate
1295     economic development, including rural economic development;
1296          (k) respect and not interfere with water rights or the operation of water facilities or

1297     water projects associated with Utah Lake;
1298          (l) respect and maintain sensitivity to the unique Native American history, historical
1299     sites, and artifacts within and around the lake authority boundary; and
1300          (m) protect the ability of the Provo airport to operate and grow, consistent with
1301     applicable environmental regulations, recognizing the significant state investment in the airport
1302     and the benefits that a thriving airport provides to the quality of life and the economy.
1303          (2) In fulfilling the lake authority's duties and responsibilities relating to the
1304     management of Utah Lake and to achieve and implement the management policies and
1305     objectives under Subsection (1), the lake authority shall:
1306          (a) work to identify funding sources, including federal, state, and local government
1307     funding and private funding, for capital improvement projects in and around Utah Lake;
1308          (b) review and identify land use and zoning policies and practices to recommend to
1309     land use policymakers and administrators of adjoining municipalities that are consistent with
1310     and will help to achieve the policies and objectives stated in Subsection (1);
1311          (c) consult and coordinate with other applicable governmental entities to improve and
1312     enhance transportation and other infrastructure and facilities in order to maximize the potential
1313     of Utah Lake to attract, retain, and service users who will help enhance the long-term economic
1314     benefit to the state; and
1315          (d) pursue policies that the board determines are designed to avoid or minimize
1316     negative environmental impacts of management.
1317          (3) The lake authority shall respect:
1318          (a) a permit issued by a governmental entity applicable to Utah Lake;
1319          (b) a governmental entity's easement or other interest affecting Utah Lake;
1320          (c) an agreement between governmental entities, including between a state agency and
1321     the federal government, relating to Utah Lake; and
1322          (d) the public trust doctrine as applicable to land within the lake authority boundary.
1323          (4) (a) The lake authority may use lake authority money to encourage, incentivize,
1324     fund, or require development that:
1325          (i) mitigates noise, air pollution, light pollution, surface and groundwater pollution,
1326     and other negative environmental impacts;
1327          (ii) includes building or project designs that minimize negative impacts to the June

1328     Sucker, avian species, and other wildlife;
1329          (iii) mitigates traffic congestion; or
1330          (iv) uses high efficiency building construction and operation.
1331          (b) In consultation with the municipality in which management is expected to occur
1332     and applicable state agencies, the lake authority shall establish minimum mitigation and
1333     environmental standards for management occurring on land within the lake authority boundary.
1334          Section 16. Section 11-68-201 is amended to read:
1335          11-68-201. State Fair Park Authority -- Legal status -- Powers.
1336          (1) There is created the State Fair Park Authority.
1337          (2) The authority is:
1338          (a) an independent, nonprofit, separate body corporate and politic, with perpetual
1339     succession;
1340          (b) a political subdivision of the state; and
1341          (c) a public corporation, as defined in Section 63E-1-102.
1342          (3) (a) The fair corporation is dissolved and ceases to exist, subject to any winding
1343     down and other actions necessary for a transition to the authority.
1344          (b) The authority:
1345          (i) replaces and is the successor to the fair corporation;
1346          (ii) succeeds to all rights, obligations, privileges, immunities, and assets of the fair
1347     corporation; and
1348          (iii) shall fulfill and perform all contractual and other obligations of the fair
1349     corporation.
1350          (c) The board shall take all actions necessary and appropriate to wind down the affairs
1351     of the fair corporation as quickly as practicable and to make a transition from the fair
1352     corporation to the authority.
1353          (4) The authority shall:
1354          (a) manage, supervise, and control:
1355          (i) all activities relating to the annual exhibition described in Subsection (4)(j); and
1356          (ii) except as otherwise provided by statute, all state expositions, including setting the
1357     time, place, and purpose of any state exposition;
1358          (b) for public entertainment, displays, and exhibits or similar events held at the state

1359     fair park:
1360          (i) provide, sponsor, or arrange the events;
1361          (ii) publicize and promote the events; and
1362          (iii) secure funds to cover the cost of the exhibits from:
1363          (A) private contributions;
1364          (B) public appropriations;
1365          (C) admission charges; and
1366          (D) other lawful means;
1367          (c) acquire and designate exposition sites;
1368          (d) use generally accepted accounting principles in accounting for the authority's assets,
1369     liabilities, and operations;
1370          (e) seek corporate sponsorships for the state fair park or for individual buildings or
1371     facilities on fair park land;
1372          (f) work with county and municipal governments, the Salt Lake Convention and
1373     Visitor's Bureau, the Utah Office of Tourism, and other entities to develop and promote
1374     expositions and the use of fair park land;
1375          (g) develop and maintain a marketing program to promote expositions and the use of
1376     fair park land;
1377          (h) in accordance with provisions of this chapter, operate and maintain state-owned
1378     buildings and facilities on fair park land, including the physical appearance and structural
1379     integrity of those buildings and facilities;
1380          (i) prepare an economic development plan for the fair park land;
1381          (j) hold an annual exhibition on fair park land that:
1382          (i) is called the state fair or a similar name;
1383          (ii) promotes and highlights agriculture throughout the state;
1384          (iii) includes expositions of livestock, poultry, agricultural, domestic science,
1385     horticultural, floricultural, mineral and industrial products, manufactured articles, and domestic
1386     animals that, in the board's opinion, will best stimulate agricultural, industrial, artistic, and
1387     educational pursuits and the sharing of talents among the people of the state;
1388          (iv) includes the award of premiums for the best specimens of the exhibited articles
1389     and animals;

1390          (v) permits competition by livestock exhibited by citizens of other states and territories
1391     of the United States; and
1392          (vi) is arranged according to plans approved by the board;
1393          (k) fix the conditions of entry to the annual exhibition described in Subsection (4)(j);
1394     and
1395          (l) publish a list of premiums that will be awarded at the annual exhibition described in
1396     Subsection (4)(j) for the best specimens of exhibited articles and animals.
1397          (5) In addition to the annual exhibition described in Subsection (4)(j), the authority
1398     may hold other exhibitions of livestock, poultry, agricultural, domestic science, horticultural,
1399     floricultural, mineral and industrial products, manufactured articles, and domestic animals that,
1400     in the corporation's opinion, will best stimulate agricultural, industrial, artistic, and educational
1401     pursuits and the sharing of talents among the people of the state.
1402          (6) The authority may:
1403          (a) employ advisers, consultants, and agents, including financial experts and
1404     independent legal counsel, and fix their compensation;
1405          (b) (i) participate in the state's Risk Management Fund created under Section
1406     63A-4-201 or any captive insurance company created by the risk manager; or
1407          (ii) procure insurance against any loss in connection with the authority's property and
1408     other assets;
1409          (c) receive and accept aid or contributions of money, property, labor, or other things of
1410     value from any source, including any grants or appropriations from any department, agency, or
1411     instrumentality of the United States or the state;
1412          (d) hold, use, loan, grant, and apply that aid and those contributions to carry out the
1413     purposes of the authority, subject to the conditions, if any, upon which the aid and
1414     contributions are made;
1415          (e) enter into management agreements with any person or entity for the performance of
1416     the authority's functions or powers;
1417          (f) establish accounts and procedures that are necessary to budget, receive, disburse,
1418     account for, and audit all funds received, appropriated, or generated;
1419          (g) subject to Subsection (8), lease any of the state-owned buildings or facilities located
1420     on fair park land;

1421          (h) sponsor events as approved by the board;
1422          (i) subject to Subsection (11), acquire any interest in real property that the board
1423     considers necessary or advisable to further a purpose of the authority or facilitate the authority's
1424     fulfillment of a duty under this chapter;
1425          (j) in accordance with Title 11, Chapter 42a, Commercial Property Assessed Clean
1426     Energy Act, provide for or finance an energy efficiency upgrade, a [renewable] clean energy
1427     system, or electric vehicle charging infrastructure, as those terms are defined in Section
1428     11-42a-102; and
1429          (k) enter into one or more agreements to develop the fair park land.
1430          (7) The authority shall comply with:
1431          (a) Title 51, Chapter 5, Funds Consolidation Act;
1432          (b) Title 51, Chapter 7, State Money Management Act;
1433          (c) Title 52, Chapter 4, Open and Public Meetings Act;
1434          (d) Title 63G, Chapter 2, Government Records Access and Management Act;
1435          (e) the provisions of Section 67-3-12;
1436          (f) Title 63G, Chapter 6a, Utah Procurement Code, except for a procurement for:
1437          (i) entertainment provided at the state fair park;
1438          (ii) judges for competitive exhibits; or
1439          (iii) sponsorship of an event on fair park land; and
1440          (g) the legislative approval requirements for capital development projects established
1441     in Section 63A-5b-404.
1442          (8) (a) Before the authority executes a lease described in Subsection (6)(g) with a term
1443     of 10 or more years, the authority shall:
1444          (i) submit the proposed lease to the division for the division's approval or rejection; and
1445          (ii) if the division approves the proposed lease, submit the proposed lease to the
1446     Executive Appropriations Committee for the Executive Appropriation Committee's review and
1447     recommendation in accordance with Subsection (8)(b).
1448          (b) The Executive Appropriations Committee shall review a proposed lease submitted
1449     in accordance with Subsection (8)(a) and recommend to the authority that the authority:
1450          (i) execute the proposed lease, either as proposed or with changes recommended by the
1451     Executive Appropriations Committee; or

1452          (ii) reject the proposed lease.
1453          (9) (a) Subject to Subsection (9)(b), a department, division, or other instrumentality of
1454     the state and a political subdivision of the state shall cooperate with the authority to the fullest
1455     extent possible to provide whatever support, information, or other assistance the authority
1456     requests that is reasonably necessary to help the authority fulfill the authority's duties and
1457     responsibilities under this chapter.
1458          (b) The division shall provide assistance and resources to the authority as the division
1459     director determines is appropriate.
1460          (10) The authority may share authority revenue with a municipality in which the fair
1461     park land is located, as provided in an agreement between the authority and the municipality, to
1462     pay for municipal services provided by the municipality.
1463          (11) (a) As used in this Subsection (11), "new land" means land that, if acquired by the
1464     authority, would result in the authority having acquired over three acres of land more than the
1465     land described in Subsection 11-68-101(9)(a).
1466          (b) In conjunction with the authority's acquisition of new land, the authority shall enter
1467     an agreement with the municipality in which the new land is located.
1468          (c) To provide funds for the cost of increased municipal services that the municipality
1469     will provide to the new land, an agreement under Subsection (11)(b) shall:
1470          (i) provide for:
1471          (A) the payment of impact fees to the municipality for development activity on the new
1472     land; and
1473          (B) the authority's sharing with the municipality tax revenue generated from the new
1474     land; and
1475          (ii) be structured in a way that recognizes the needs of the authority and furthers mutual
1476     goals of the authority and the municipality.
1477          Section 17. Section 17-27a-401 is amended to read:
1478          17-27a-401. General plan required -- Content -- Resource management plan --
1479     Provisions related to radioactive waste facility.
1480          (1) To accomplish the purposes of this chapter, a county shall prepare and adopt a
1481     comprehensive, long-range general plan:
1482          (a) for present and future needs of the county;

1483          (b) (i) for growth and development of all or any part of the land within the
1484     unincorporated portions of the county; or
1485          (ii) if a county has designated a mountainous planning district, for growth and
1486     development of all or any part of the land within the mountainous planning district; and
1487          (c) as a basis for communicating and coordinating with the federal government on land
1488     and resource management issues.
1489          (2) To promote health, safety, and welfare, the general plan may provide for:
1490          (a) health, general welfare, safety, energy conservation, transportation, prosperity, civic
1491     activities, aesthetics, and recreational, educational, and cultural opportunities;
1492          (b) the reduction of the waste of physical, financial, or human resources that result
1493     from either excessive congestion or excessive scattering of population;
1494          (c) the efficient and economical use, conservation, and production of the supply of:
1495          (i) food and water; and
1496          (ii) drainage, sanitary, and other facilities and resources;
1497          (d) the use of energy conservation and solar and [renewable] clean energy resources;
1498          (e) the protection of urban development;
1499          (f) the protection and promotion of air quality;
1500          (g) historic preservation;
1501          (h) identifying future uses of land that are likely to require an expansion or significant
1502     modification of services or facilities provided by an affected entity; and
1503          (i) an official map.
1504          (3) (a) (i) The general plan of a specified county, as defined in Section 17-27a-408,
1505     shall include a moderate income housing element that meets the requirements of Subsection
1506     17-27a-403(2)(a)(iii).
1507          (ii) (A) This Subsection (3)(a)(ii) applies to a county that does not qualify as a
1508     specified county as of January 1, 2023.
1509          (B) As of January 1, if a county described in Subsection (3)(a)(ii)(A) changes from one
1510     class to another or grows in population to qualify as a specified county as defined in Section
1511     17-27a-408, the county shall amend the county's general plan to comply with Subsection
1512     (3)(a)(i) on or before August 1 of the first calendar year beginning on January 1 in which the
1513     county qualifies as a specified county.

1514          (iii) A county described in Subsection (3)(a)(ii)(B) shall send a copy of the county's
1515     amended general plan to the association of governments, established pursuant to an interlocal
1516     agreement under Title 11, Chapter 13, Interlocal Cooperation Act, of which the county is a
1517     member.
1518          (b) The general plan shall contain a resource management plan for the public lands, as
1519     defined in Section 63L-6-102, within the county.
1520          (c) The resource management plan described in Subsection (3)(b) shall address:
1521          (i) mining;
1522          (ii) land use;
1523          (iii) livestock and grazing;
1524          (iv) irrigation;
1525          (v) agriculture;
1526          (vi) fire management;
1527          (vii) noxious weeds;
1528          (viii) forest management;
1529          (ix) water rights;
1530          (x) ditches and canals;
1531          (xi) water quality and hydrology;
1532          (xii) flood plains and river terraces;
1533          (xiii) wetlands;
1534          (xiv) riparian areas;
1535          (xv) predator control;
1536          (xvi) wildlife;
1537          (xvii) fisheries;
1538          (xviii) recreation and tourism;
1539          (xix) energy resources;
1540          (xx) mineral resources;
1541          (xxi) cultural, historical, geological, and paleontological resources;
1542          (xxii) wilderness;
1543          (xxiii) wild and scenic rivers;
1544          (xxiv) threatened, endangered, and sensitive species;

1545          (xxv) land access;
1546          (xxvi) law enforcement;
1547          (xxvii) economic considerations; and
1548          (xxviii) air.
1549          (d) For each item listed under Subsection (3)(c), a county's resource management plan
1550     shall:
1551          (i) establish findings pertaining to the item;
1552          (ii) establish defined objectives; and
1553          (iii) outline general policies and guidelines on how the objectives described in
1554     Subsection (3)(d)(ii) are to be accomplished.
1555          (4) (a) (i) The general plan shall include specific provisions related to an area within, or
1556     partially within, the exterior boundaries of the county, or contiguous to the boundaries of a
1557     county, which are proposed for the siting of a storage facility or transfer facility for the
1558     placement of high-level nuclear waste or greater than class C radioactive nuclear waste, as
1559     these wastes are defined in Section 19-3-303.
1560          (ii) The provisions described in Subsection (4)(a)(i) shall address the effects of the
1561     proposed site upon the health and general welfare of citizens of the state, and shall provide:
1562          (A) the information identified in Section 19-3-305;
1563          (B) information supported by credible studies that demonstrates that Subsection
1564     19-3-307(2) has been satisfied; and
1565          (C) specific measures to mitigate the effects of high-level nuclear waste and greater
1566     than class C radioactive waste and guarantee the health and safety of the citizens of the state.
1567          (b) A county may, in lieu of complying with Subsection (4)(a), adopt an ordinance
1568     indicating that all proposals for the siting of a storage facility or transfer facility for the
1569     placement of high-level nuclear waste or greater than class C radioactive waste wholly or
1570     partially within the county are rejected.
1571          (c) A county may adopt the ordinance listed in Subsection (4)(b) at any time.
1572          (d) The county shall send a certified copy of the ordinance described in Subsection
1573     (4)(b) to the executive director of the Department of Environmental Quality by certified mail
1574     within 30 days of enactment.
1575          (e) If a county repeals an ordinance adopted under Subsection (4)(b) the county shall:

1576          (i) comply with Subsection (4)(a) as soon as reasonably possible; and
1577          (ii) send a certified copy of the repeal to the executive director of the Department of
1578     Environmental Quality by certified mail within 30 days after the repeal.
1579          (5) The general plan may define the county's local customs, local culture, and the
1580     components necessary for the county's economic stability.
1581          (6) Subject to Subsection 17-27a-403(2), the county may determine the
1582     comprehensiveness, extent, and format of the general plan.
1583          (7) If a county has designated a mountainous planning district, the general plan for the
1584     mountainous planning district is the controlling plan.
1585          (8) Nothing in this part may be construed to limit the authority of the state to manage
1586     and protect wildlife under Title 23A, Wildlife Resources Act.
1587          (9) On or before December 31, 2025, a county that has a general plan that does not
1588     include a water use and preservation element that complies with Section 17-27a-403 shall
1589     amend the county's general plan to comply with Section 17-27a-403.
1590          Section 18. Section 17-50-335 is amended to read:
1591          17-50-335. Energy efficiency upgrade, clean energy system, or electric vehicle
1592     charging infrastructure.
1593          A county may provide or finance an energy efficiency upgrade, a [renewable] clean
1594     energy system, or electric vehicle charging infrastructure as defined in Section 11-42a-102, in a
1595     designated voluntary assessment area in accordance with Title 11, Chapter 42a, Commercial
1596     Property Assessed Clean Energy Act.
1597          Section 19. Section 17B-1-202 is amended to read:
1598          17B-1-202. Special district may be created -- Services that may be provided --
1599     Limitations.
1600          (1) (a) A special district may be created as provided in this part to provide within its
1601     boundaries service consisting of:
1602          (i) the operation of an airport;
1603          (ii) the operation of a cemetery;
1604          (iii) fire protection, paramedic, and emergency services, including consolidated 911
1605     and emergency dispatch services;
1606          (iv) garbage collection and disposal;

1607          (v) health care, including health department or hospital service;
1608          (vi) the operation of a library;
1609          (vii) abatement or control of mosquitos and other insects;
1610          (viii) the operation of parks or recreation facilities or services;
1611          (ix) the operation of a sewage system;
1612          (x) the construction and maintenance of a right-of-way, including:
1613          (A) a curb;
1614          (B) a gutter;
1615          (C) a sidewalk;
1616          (D) a street;
1617          (E) a road;
1618          (F) a water line;
1619          (G) a sewage line;
1620          (H) a storm drain;
1621          (I) an electricity line;
1622          (J) a communications line;
1623          (K) a natural gas line; or
1624          (L) street lighting;
1625          (xi) transportation, including public transit and providing streets and roads;
1626          (xii) the operation of a system, or one or more components of a system, for the
1627     collection, storage, retention, control, conservation, treatment, supplying, distribution, or
1628     reclamation of water, including storm, flood, sewage, irrigation, and culinary water, whether
1629     the system is operated on a wholesale or retail level or both;
1630          (xiii) in accordance with Subsection (1)(c), the acquisition or assessment of a
1631     groundwater right for the development and execution of a groundwater management plan in
1632     cooperation with and approved by the state engineer in accordance with Section 73-5-15;
1633          (xiv) law enforcement service;
1634          (xv) subject to Subsection (1)(b), the underground installation of an electric utility line
1635     or the conversion to underground of an existing electric utility line;
1636          (xvi) the control or abatement of earth movement or a landslide;
1637          (xvii) the operation of animal control services and facilities; or

1638          (xviii) an energy efficiency upgrade, a [renewable] clean energy system, or electric
1639     vehicle charging infrastructure as defined in Section 11-42a-102, in accordance with Title 11,
1640     Chapter 42a, Commercial Property Assessed Clean Energy Act.
1641          (b) Each special district that provides the service of the underground installation of an
1642     electric utility line or the conversion to underground of an existing electric utility line shall, in
1643     installing or converting the line, provide advance notice to and coordinate with the utility that
1644     owns the line.
1645          (c) A groundwater management plan described in Subsection (1)(a)(xiii) may include
1646     the banking of groundwater rights by a special district in a critical management area as defined
1647     in Section 73-5-15 following the adoption of a groundwater management plan by the state
1648     engineer under Section 73-5-15.
1649          (i) A special district may manage the groundwater rights it acquires under Subsection
1650     17B-1-103(2)(a) or (b) consistent with the provisions of a groundwater management plan
1651     described in this Subsection (1)(c).
1652          (ii) A groundwater right held by a special district to satisfy the provisions of a
1653     groundwater management plan is not subject to the forfeiture provisions of Section 73-1-4.
1654          (iii) (A) A special district may divest itself of a groundwater right subject to a
1655     determination that the groundwater right is not required to facilitate the groundwater
1656     management plan described in this Subsection (1)(c).
1657          (B) The groundwater right described in Subsection (1)(c)(iii)(A) is subject to Section
1658     73-1-4 beginning on the date of divestiture.
1659          (iv) Upon a determination by the state engineer that an area is no longer a critical
1660     management area as defined in Section 73-5-15, a groundwater right held by the special district
1661     is subject to Section 73-1-4.
1662          (v) A special district created in accordance with Subsection (1)(a)(xiii) to develop and
1663     execute a groundwater management plan may hold or acquire a right to surface waters that are
1664     naturally tributary to the groundwater basin subject to the groundwater management plan if the
1665     surface waters are appropriated in accordance with Title 73, Water and Irrigation, and used in
1666     accordance with Title 73, Chapter 3b, Groundwater Recharge and Recovery Act.
1667          (2) As used in this section:
1668          (a) "Operation" means all activities involved in providing the indicated service

1669     including acquisition and ownership of property reasonably necessary to provide the indicated
1670     service and acquisition, construction, and maintenance of facilities and equipment reasonably
1671     necessary to provide the indicated service.
1672          (b) "System" means the aggregate of interrelated components that combine together to
1673     provide the indicated service including, for a sewage system, collection and treatment.
1674          (3) (a) A special district may not be created to provide and may not after its creation
1675     provide more than four of the services listed in Subsection (1).
1676          (b) Subsection (3)(a) may not be construed to prohibit a special district from providing
1677     more than four services if, before April 30, 2007, the special district was authorized to provide
1678     those services.
1679          (4) (a) Except as provided in Subsection (4)(b), a special district may not be created to
1680     provide and may not after its creation provide to an area the same service that may already be
1681     provided to that area by another political subdivision, unless the other political subdivision
1682     gives its written consent.
1683          (b) For purposes of Subsection (4)(a), a special district does not provide the same
1684     service as another political subdivision if it operates a component of a system that is different
1685     from a component operated by another political subdivision but within the same:
1686          (i) sewage system; or
1687          (ii) water system.
1688          (5) (a) Except for a special district in the creation of which an election is not required
1689     under Subsection 17B-1-214(3)(d), the area of a special district may include all or part of the
1690     unincorporated area of one or more counties and all or part of one or more municipalities.
1691          (b) The area of a special district need not be contiguous.
1692          (6) For a special district created before May 5, 2008, the authority to provide fire
1693     protection service also includes the authority to provide:
1694          (a) paramedic service; and
1695          (b) emergency service, including hazardous materials response service.
1696          (7) A special district created before May 11, 2010, authorized to provide the
1697     construction and maintenance of curb, gutter, or sidewalk may provide a service described in
1698     Subsection (1)(a)(x) on or after May 11, 2010.
1699          (8) A special district created before May 10, 2011, authorized to provide culinary,

1700     irrigation, sewage, or storm water services may provide a service described in Subsection
1701     (1)(a)(xii) on or after May 10, 2011.
1702          (9) A special district may not be created under this chapter for two years after the date
1703     on which a special district is dissolved as provided in Section 17B-1-217 if the special district
1704     proposed for creation:
1705          (a) provides the same or a substantially similar service as the dissolved special district;
1706     and
1707          (b) is located in substantially the same area as the dissolved special district.
1708          Section 20. Section 17D-1-201 is amended to read:
1709          17D-1-201. Services that a special service district may be created to provide.
1710          As provided in this part, a county or municipality may create a special service district to
1711     provide any combination of the following services:
1712          (1) water;
1713          (2) sewerage;
1714          (3) drainage;
1715          (4) flood control;
1716          (5) garbage collection and disposal;
1717          (6) health care;
1718          (7) transportation, including the receipt of federal secure rural school funds under
1719     Section 51-9-603 for the purposes of constructing, improving, repairing, or maintaining public
1720     roads;
1721          (8) recreation;
1722          (9) fire protection, including:
1723          (a) emergency medical services, ambulance services, and search and rescue services, if
1724     fire protection service is also provided;
1725          (b) Firewise Communities programs and the development of community wildfire
1726     protection plans; and
1727          (c) the receipt of federal secure rural school funds as provided under Section 51-9-603
1728     for the purposes of carrying out Firewise Communities programs, developing community
1729     wildfire protection plans, and performing emergency services, including firefighting on federal
1730     land and other services authorized under this Subsection (9);

1731          (10) providing, operating, and maintaining correctional and rehabilitative facilities and
1732     programs for municipal, state, and other detainees and prisoners;
1733          (11) street lighting;
1734          (12) consolidated 911 and emergency dispatch;
1735          (13) animal shelter and control;
1736          (14) receiving federal mineral lease funds under Title 59, Chapter 21, Mineral Lease
1737     Funds, and expending those funds to be used in accordance with state and federal law;
1738          (15) in a county of the first class, extended police protection;
1739          (16) control or abatement of earth movement or a landslide;
1740          (17) an energy efficiency upgrade, a [renewable] clean energy system, or electric
1741     vehicle charging infrastructure as defined in Section 11-42a-102, in accordance with Title 11,
1742     Chapter 42a, Commercial Property Assessed Clean Energy Act; or
1743          (18) cemetery.
1744          Section 21. Section 54-17-502 is amended to read:
1745          54-17-502. Clean energy source -- Solicitation -- Consultant.
1746          (1) Sections 54-17-102 through 54-17-404 do not apply to a significant energy resource
1747     that is a [renewable] clean energy source as defined in Section 54-17-601 if the nameplate
1748     capacity of the [renewable] clean energy source does not exceed 300 megawatts or, if
1749     applicable, the quantity of capacity that is the subject of a contract for the purchase of
1750     electricity from a [renewable] clean energy source does not exceed 300 megawatts.
1751          (2) (a) (i) An affected electrical utility shall issue a public solicitation of bids for a
1752     [renewable] clean energy source up to 300 megawatts in size by January 31 of each year in
1753     which it reasonably anticipates that it will need to acquire or commence construction of a
1754     [renewable] clean energy resource.
1755          (ii) A solicitation for a [renewable] clean energy source issued by January 31, 2008 for
1756     up to 99 megawatts satisfies the requirement of this Subsection (2) for the year 2008 if:
1757          (A) not later than 30 days after the day on which this section takes effect, the affected
1758     electrical utility amends the solicitation or initiates a new solicitation to seek bids for
1759     [renewable] clean energy source projects up to 300 megawatts in size; and
1760          (B) within 60 days after the day on which this section takes effect and as soon as
1761     practicable, the commission retains a consultant in accordance with Subsection (3).

1762          (b) A consultant hired under Subsection (2)(a)(ii)(B) shall perform the consultant's
1763     duties under Subsection (3) in relation to the status of the solicitation process at the time the
1764     consultant is retained and may not unreasonably delay the solicitation process.
1765          (c) For a solicitation issued after January 31, 2008:
1766          (i) the affected electrical utility shall develop a reasonable process for pre-approval of
1767     bidders; and
1768          (ii) in addition to publicly issuing the solicitation in Subsection (2)(a)(i), the affected
1769     electrical utility shall send copies of the solicitation to each potential bidder who is
1770     pre-approved.
1771          (d) The affected electrical utility shall evaluate in good faith each bid that is received
1772     and negotiate in good faith with each bidder whose bid appears to be cost effective, as defined
1773     in Section 54-17-602.
1774          (e) Beginning on August 1, 2008, and on each August 1 thereafter, the affected
1775     electrical utility shall file a notice with the commission indicating whether it reasonably
1776     anticipates that it will need to acquire or commence construction of a [renewable] clean energy
1777     resource during the following year.
1778          (3) (a) If the commission receives a notice under Subsection (2)(e) that the affected
1779     electrical utility reasonably anticipates that it will need to acquire or commence construction of
1780     a [renewable] clean energy source during the following year, the commission shall promptly
1781     retain a consultant to:
1782          (i) validate that the affected electrical utility is following the bidder pre-approval
1783     process developed pursuant to Subsection (2)(c) and make recommendations for changes to the
1784     pre-approval process for future solicitations;
1785          (ii) monitor and document all material aspects of the bids, bid evaluations, and bid
1786     negotiations between the affected electrical utility and any bidders in the solicitation process;
1787          (iii) maintain adequate documentation of each bid, including the solicitation,
1788     evaluation, and negotiation processes and the reason for the conclusion of negotiations, which
1789     documentation shall be transmitted to the commission at the conclusion of all negotiations in
1790     the solicitation; and
1791          (iv) be available to testify under oath before the commission in any relevant proceeding
1792     concerning all aspects of the public solicitation process.

1793          (b) The commission and the consultant shall use all reasonable efforts to not delay the
1794     solicitation process.
1795          (4) Documentation provided to the commission by the consultant shall be available to
1796     the affected electrical utility, any bidder, or other interested person under terms and conditions
1797     and at times determined appropriate by the commission.
1798          (5) (a) The commission and the consultant shall execute a contract approved by the
1799     commission with terms and conditions approved by the commission.
1800          (b) Unless otherwise provided by contract, an invoice for the consultant's services shall
1801     be sent to the Division of Public Utilities for review and approval.
1802          (c) After approval under Subsection (5)(b), the invoice shall be forwarded to the
1803     affected electrical utility for payment to the consultant.
1804          (d) The affected electrical utility may, in a general rate case or other appropriate
1805     commission proceeding, include, and the commission shall allow, recovery by the affected
1806     electrical utility of any amount paid by the affected electrical utility for the consultant.
1807          (6) (a) Nothing in this section precludes an affected electrical utility from constructing
1808     or acquiring any [renewable] clean energy source project outside the solicitation process
1809     provided for in this section, including purchasing electricity from any [renewable] clean energy
1810     source project that chooses to self-certify as a qualifying facility under the federal Public Utility
1811     Regulatory Policies Act of 1978.
1812          (b) An affected electrical utility that constructs a [renewable] clean energy source
1813     outside the solicitation process of this section or Section 54-17-201 shall file a notice with the
1814     commission at least 60 days before the date of commencement of construction, indicating the
1815     size and location of the [renewable] clean energy source.
1816          (c) The date of commencement of construction under Subsection (6)(b) is the date of
1817     any directive from an affected electrical utility to the person responsible for the construction of
1818     the [renewable] clean energy source authorizing or directing the person to proceed with
1819     construction.
1820          (d) For an affected electrical utility whose rates are regulated by the commission, the
1821     utility has the burden of proving in a rate case or other appropriate commission proceeding the
1822     prudence, reasonableness, and cost-effectiveness of construction under this Subsection (6),
1823     including the method used to evaluate the risks and value of any bid submitted in the

1824     solicitation under this section.
1825          (7) Nothing in this section requires an affected electrical utility to enter into any
1826     transaction that it reasonably believes is not cost effective or otherwise is not in the public
1827     interest.
1828          Section 22. Section 54-17-601 is amended to read:
1829          54-17-601. Definitions.
1830          As used in this part:
1831          (1) "Adjusted retail electric sales" means the total kilowatt-hours of retail electric sales
1832     of an electrical corporation to customers in this state in a calendar year, reduced by:
1833          (a) the amount of those kilowatt-hours attributable to electricity generated or purchased
1834     in that calendar year from qualifying zero carbon emissions generation and qualifying carbon
1835     sequestration generation;
1836          (b) the amount of those kilowatt-hours attributable to electricity generated or purchased
1837     in that calendar year from generation located within the geographic boundary of the Western
1838     Electricity Coordinating Council that derives its energy from one or more of the following but
1839     that does not satisfy the definition of a [renewable] clean energy source or that otherwise has
1840     not been used to satisfy Subsection 54-17-602(1):
1841          (i) wind energy;
1842          (ii) solar photovoltaic and solar thermal energy;
1843          (iii) wave, tidal, and ocean thermal energy;
1844          (iv) except for combustion of wood that has been treated with chemical preservatives
1845     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
1846     byproducts, including:
1847          (A) organic waste;
1848          (B) forest or rangeland woody debris from harvesting or thinning conducted to improve
1849     forest or rangeland ecological health and to reduce wildfire risk;
1850          (C) agricultural residues;
1851          (D) dedicated energy crops; and
1852          (E) landfill gas or biogas produced from organic matter, wastewater, anaerobic
1853     digesters, or municipal solid waste;
1854          (v) geothermal energy;

1855          (vi) hydroelectric energy; or
1856          (vii) waste gas and waste heat capture or recovery; and
1857          (c) the number of kilowatt-hours attributable to reductions in retail sales in that
1858     calendar year from demand side management as defined in Section 54-7-12.8, with the
1859     kilowatt-hours for an electrical corporation whose rates are regulated by the commission and
1860     adjusted by the commission to exclude kilowatt-hours for which a renewable energy certificate
1861     is issued under Subsection 54-17-603(4)(b).
1862          (2) "Amount of kilowatt-hours attributable to electricity generated or purchased in that
1863     calendar year from qualifying carbon sequestration generation," for qualifying carbon
1864     sequestration generation, means the kilowatt-hours supplied by a facility during the calendar
1865     year multiplied by the ratio of the amount of carbon dioxide captured from the facility and
1866     sequestered to the sum of the amount of carbon dioxide captured from the facility and
1867     sequestered plus the amount of carbon dioxide emitted from the facility during the same
1868     calendar year.
1869          (3) "Banked renewable energy certificate" means a bundled or unbundled renewable
1870     energy certificate that is:
1871          (a) not used in a calendar year to comply with this part or with a renewable energy
1872     program in another state; and
1873          (b) carried forward into a subsequent year.
1874          (4) "Bundled renewable energy certificate" means a renewable energy certificate for
1875     qualifying electricity that is acquired:
1876          (a) by an electrical corporation by a trade, purchase, or other transfer of electricity that
1877     includes the renewable energy attributes of, or certificate that is issued for, the electricity; or
1878          (b) by an electrical corporation by generating the electricity for which the renewable
1879     energy certificate is issued.
1880          (5) "Clean energy source" means:
1881          (a) an electric generation facility or generation capability or upgrade that becomes
1882     operational on or after January 1, 1995, that derives its energy from one or more of the
1883     following:
1884          (i) wind energy;
1885          (ii) solar photovoltaic and solar thermal energy;

1886          (iii) wave, tidal, and ocean thermal energy;
1887          (iv) except for combustion of wood that has been treated with chemical preservatives
1888     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
1889     byproducts, including:
1890          (A) organic waste;
1891          (B) forest or rangeland woody debris from harvesting or thinning conducted to improve
1892     forest or rangeland ecological health and to reduce wildfire risk;
1893          (C) agricultural residues;
1894          (D) dedicated energy crops; and
1895          (E) landfill gas or biogas produced from organic matter, wastewater, anaerobic
1896     digesters, or municipal solid waste;
1897          (v) geothermal energy located outside the state;
1898          (vi) waste gas and waste heat capture or recovery, including methane gas from:
1899          (A) an abandoned coal mine; or
1900          (B) a coal degassing operation associated with a state-approved mine permit;
1901          (vii) efficiency upgrades to a hydroelectric facility, without regard to the date upon
1902     which the facility became operational, if the upgrades become operational on or after January
1903     1, 1995;
1904          (viii) compressed air, if:
1905          (A) the compressed air is taken from compressed air energy storage; and
1906          (B) the energy used to compress the air is a clean energy source;
1907          (ix) municipal solid waste; or
1908          (x) energy derived from nuclear fuel;
1909          (b) any of the following:
1910          (i) up to 50 average megawatts of electricity per year per electrical corporation from a
1911     certified low-impact hydroelectric facility, without regard to the date upon which the facility
1912     becomes operational, if the facility is certified as a low-impact hydroelectric facility on or after
1913     January 1, 1995, by a national certification organization;
1914          (ii) geothermal energy if located within the state, without regard to the date upon which
1915     the facility becomes operational; or
1916          (iii) hydroelectric energy if located within the state, without regard to the date upon

1917     which the facility becomes operational;
1918          (c) hydrogen gas derived from any source of energy described in Subsection (5)(a) or
1919     (b);
1920          (d) if an electric generation facility employs multiple energy sources, that portion of the
1921     electricity generated that is attributable to energy sources described in Subsections (5)(a)
1922     through (c); and
1923          (e) any of the following located in the state and owned by a user of energy:
1924          (i) a demand side management measure, as defined by Subsection 54-7-12.8(1), with
1925     the quantity of renewable energy certificates to which the user is entitled determined by the
1926     equivalent energy saved by the measure;
1927          (ii) a solar thermal system that reduces the consumption of fossil fuels, with the
1928     quantity of renewable energy certificates to which the user is entitled determined by the
1929     equivalent kilowatt-hours saved, except to the extent the commission determines otherwise
1930     with respect to net-metered energy;
1931          (iii) a solar photovoltaic system that reduces the consumption of fossil fuels with the
1932     quantity of renewable energy certificates to which the user is entitled determined by the total
1933     production of the system, except to the extent the commission determines otherwise with
1934     respect to net-metered energy;
1935          (iv) a hydroelectric or geothermal facility with the quantity of renewable energy
1936     certificates to which the user is entitled determined by the total production of the facility,
1937     except to the extent the commission determines otherwise with respect to net-metered energy;
1938          (v) a waste gas or waste heat capture or recovery system, other than from a combined
1939     cycle combustion turbine that does not use waste gas or waste heat, with the quantity of
1940     renewable energy certificates to which the user is entitled determined by the total production of
1941     the system, except to the extent the commission determines otherwise with respect to
1942     net-metered energy; and
1943          (vi) the station use of solar thermal energy, solar photovoltaic energy, hydroelectric
1944     energy, geothermal energy, waste gas, or waste heat capture and recovery.
1945          [(5)] (6) "Electrical corporation":
1946          (a) is as defined in Section 54-2-1; and
1947          (b) does not include a person generating electricity that is not for sale to the public.

1948          [(6)] (7) "Qualifying carbon sequestration generation" means a fossil-fueled generating
1949     facility located within the geographic boundary of the Western Electricity Coordinating
1950     Council that:
1951          (a) becomes operational or is retrofitted on or after January 1, 2008; and
1952          (b) reduces carbon dioxide emissions into the atmosphere through permanent
1953     geological sequestration or through another verifiably permanent reduction in carbon dioxide
1954     emissions through the use of technology.
1955          [(7)] (8) "Qualifying electricity" means electricity generated on or after January 1,
1956     1995, from a [renewable] clean energy source if:
1957          (a) (i) the renewable energy source is located within the geographic boundary of the
1958     Western Electricity Coordinating Council; or
1959          (ii) the qualifying electricity is delivered to the transmission system of an electrical
1960     corporation or a delivery point designated by the electrical corporation for the purpose of
1961     subsequent delivery to the electrical corporation; and
1962          (b) the renewable energy attributes of the electricity are not traded, sold, transferred, or
1963     otherwise used to satisfy another state's renewable energy program.
1964          [(8)] (9) "Qualifying zero carbon emissions generation":
1965          (a) means a generation facility located within the geographic boundary of the Western
1966     Electricity Coordinating Council that:
1967          (i) becomes operational on or after January 1, 2008; and
1968          (ii) does not produce carbon as a byproduct of the generation process;
1969          (b) includes generation powered by nuclear fuel; and
1970          (c) does not include renewable energy sources used to satisfy the requirement
1971     established under Subsection 54-17-602(1).
1972          [(9)] (10) "Renewable energy certificate" means a certificate issued under Section
1973     54-17-603.
1974          [(10) "Renewable energy source" means:]
1975          [(a) an electric generation facility or generation capability or upgrade that becomes
1976     operational on or after January 1, 1995 that derives its energy from one or more of the
1977     following:]
1978          [(i) wind energy;]

1979          [(ii) solar photovoltaic and solar thermal energy;]
1980          [(iii) wave, tidal, and ocean thermal energy;]
1981          [(iv) except for combustion of wood that has been treated with chemical preservatives
1982     such as creosote, pentachlorophenol or chromated copper arsenate, biomass and biomass
1983     byproducts, including:]
1984          [(A) organic waste;]
1985          [(B) forest or rangeland woody debris from harvesting or thinning conducted to
1986     improve forest or rangeland ecological health and to reduce wildfire risk;]
1987          [(C) agricultural residues;]
1988          [(D) dedicated energy crops; and]
1989          [(E) landfill gas or biogas produced from organic matter, wastewater, anaerobic
1990     digesters, or municipal solid waste;]
1991          [(v) geothermal energy located outside the state;]
1992          [(vi) waste gas and waste heat capture or recovery whether or not it is renewable,
1993     including methane gas from:]
1994          [(A) an abandoned coal mine; or]
1995          [(B) a coal degassing operation associated with a state-approved mine permit;]
1996          [(vii) efficiency upgrades to a hydroelectric facility, without regard to the date upon
1997     which the facility became operational, if the upgrades become operational on or after January
1998     1, 1995;]
1999          [(viii) compressed air, if:]
2000          [(A) the compressed air is taken from compressed air energy storage; and]
2001          [(B) the energy used to compress the air is a renewable energy source; or]
2002          [(ix) municipal solid waste;]
2003          [(b) any of the following:]
2004          [(i) up to 50 average megawatts of electricity per year per electrical corporation from a
2005     certified low-impact hydroelectric facility, without regard to the date upon which the facility
2006     becomes operational, if the facility is certified as a low-impact hydroelectric facility on or after
2007     January 1, 1995, by a national certification organization;]
2008          [(ii) geothermal energy if located within the state, without regard to the date upon
2009     which the facility becomes operational; or]

2010          [(iii) hydroelectric energy if located within the state, without regard to the date upon
2011     which the facility becomes operational;]
2012          [(c) hydrogen gas derived from any source of energy described in Subsection (10)(a) or
2013     (b);]
2014          [(d) if an electric generation facility employs multiple energy sources, that portion of
2015     the electricity generated that is attributable to energy sources described in Subsections (10)(a)
2016     through (c); and]
2017          [(e) any of the following located in the state and owned by a user of energy:]
2018          [(i) a demand side management measure, as defined by Subsection 54-7-12.8(1), with
2019     the quantity of renewable energy certificates to which the user is entitled determined by the
2020     equivalent energy saved by the measure;]
2021          [(ii) a solar thermal system that reduces the consumption of fossil fuels, with the
2022     quantity of renewable energy certificates to which the user is entitled determined by the
2023     equivalent kilowatt-hours saved, except to the extent the commission determines otherwise
2024     with respect to net-metered energy;]
2025          [(iii) a solar photovoltaic system that reduces the consumption of fossil fuels with the
2026     quantity of renewable energy certificates to which the user is entitled determined by the total
2027     production of the system, except to the extent the commission determines otherwise with
2028     respect to net-metered energy;]
2029          [(iv) a hydroelectric or geothermal facility with the quantity of renewable energy
2030     certificates to which the user is entitled determined by the total production of the facility,
2031     except to the extent the commission determines otherwise with respect to net-metered energy;]
2032          [(v) a waste gas or waste heat capture or recovery system, other than from a combined
2033     cycle combustion turbine that does not use waste gas or waste heat, with the quantity of
2034     renewable energy certificates to which the user is entitled determined by the total production of
2035     the system, except to the extent the commission determines otherwise with respect to
2036     net-metered energy; and]
2037          [(vi) the station use of solar thermal energy, solar photovoltaic energy, hydroelectric
2038     energy, geothermal energy, waste gas, or waste heat capture and recovery.]
2039          (11) "Unbundled renewable energy certificate" means a renewable energy certificate
2040     associated with:

2041          (a) qualifying electricity that is acquired by an electrical corporation or other person by
2042     trade, purchase, or other transfer without acquiring the electricity for which the certificate was
2043     issued; or
2044          (b) activities listed in Subsection [(10)(e)] (5)(e).
2045          Section 23. Section 54-17-602 is amended to read:
2046          54-17-602. Target amount of qualifying electricity -- Renewable energy certificate
2047     -- Cost-effectiveness -- Cooperatives.
2048          (1) (a) To the extent that it is cost effective to do so, beginning in 2025 the annual retail
2049     electric sales in this state of each electrical corporation shall consist of qualifying electricity or
2050     renewable energy certificates in an amount equal to at least 20% of adjusted retail electric
2051     sales.
2052          (b) The amount under Subsection (1)(a) is computed based upon adjusted retail electric
2053     sales for the calendar year commencing 36 months before the first day of the year for which the
2054     target calculated under Subsection (1)(a) applies.
2055          (c) Notwithstanding Subsections (1)(a) and (b), an increase in the annual target from
2056     one year to the next may not exceed the greater of:
2057          (i) 17,500 megawatt-hours; or
2058          (ii) 20% of the prior year's amount under Subsections (1)(a) and (b).
2059          (2) (a) Cost-effectiveness under Subsection (1) for other than a cooperative association
2060     is determined in comparison to other viable resource options using the criteria provided by
2061     Subsection 54-17-201(2)(c)(ii).
2062          (b) For an electrical corporation that is a cooperative association, cost-effectiveness is
2063     determined using criteria applicable to the cooperative association's acquisition of a significant
2064     energy resource established by the cooperative association's board of directors.
2065          (3) This section does not require an electrical corporation to:
2066          (a) substitute qualifying electricity for electricity from a generation source owned or
2067     contractually committed, or from a contractual commitment for a power purchase;
2068          (b) enter into any additional electric sales commitment or any other arrangement for the
2069     sale or other disposition of electricity that is not already, or would not be, entered into by the
2070     electrical corporation; or
2071          (c) acquire qualifying electricity in excess of its adjusted retail electric sales.

2072          (4) For the purpose of Subsection (1), an electrical corporation may combine the
2073     following:
2074          (a) qualifying electricity from a renewable energy source owned by the electrical
2075     corporation;
2076          (b) qualifying electricity acquired by the electrical corporation through trade, power
2077     purchase, or other transfer; and
2078          (c) a bundled or unbundled renewable energy certificate, including a banked renewable
2079     energy certificate.
2080          (5) For an electrical corporation whose rates the commission regulates, the following
2081     rules concerning renewable energy certificates apply:
2082          (a) a banked renewable energy certificate with an older issuance date shall be used
2083     before any other banked renewable energy certificate issued at a later date is used; and
2084          (b) the total of all unbundled renewable energy certificates, including unbundled
2085     banked renewable energy certificates, may not exceed 20% of the amount of the annual target
2086     provided for in Subsection (1).
2087          (6) An electrical corporation that is a cooperative association may count towards
2088     Subsection (1) any of the following:
2089          (a) electric production allocated to this state from hydroelectric facilities becoming
2090     operational after December 31, 2007, if the facilities are located in any state in which the
2091     cooperative association, or a generation and transmission cooperative with which the
2092     cooperative association has a contract, provides electric service;
2093          (b) qualifying electricity generated or acquired or renewable energy certificates
2094     acquired for a program that permits a retail customer to voluntarily contribute to a [renewable]
2095     clean energy source; and
2096          (c) notwithstanding Subsection 54-17-601(7), an unbundled renewable energy
2097     certificate purchased from a renewable energy source located outside the geographic boundary
2098     of the Western Electricity Coordinating Council if the electricity on which the unbundled
2099     renewable energy certificate is based would be considered qualifying electricity if the
2100     renewable energy source was located within the geographic boundary of the Western
2101     Electricity Coordinating Council.
2102          (7) The use of the renewable attributes associated with qualifying electricity to satisfy

2103     any federal renewable energy requirement does not preclude the electricity from being
2104     qualifying electricity for the purpose of this chapter.
2105          Section 24. Section 54-17-604 is amended to read:
2106          54-17-604. Plans and reports.
2107          (1) An electrical corporation shall develop and maintain a plan for implementing
2108     Subsection 54-17-602(1), consistent with the cost-effectiveness criteria of Subsection
2109     54-17-201(2)(c)(ii).
2110          (2) (a) A progress report concerning a plan under Subsection (1) for other than a
2111     cooperative association shall be filed with the commission by January 1 of each of the years
2112     2010, 2015, 2020, and 2024.
2113          (b) For an electrical corporation that is a cooperative association, a progress report
2114     shall be filed with the cooperative association's board of directors by January 1 of each of the
2115     years 2010, 2015, 2020, and 2024.
2116          (3) The progress report under Subsection (2) shall contain:
2117          (a) the actual and projected amount of qualifying electricity through 2025;
2118          (b) the source of qualifying electricity;
2119          (c) (i) an analysis of the cost-effectiveness of [renewable] clean energy sources for
2120     other than a cooperative association; or
2121          (ii) an estimate of the cost of achieving the target for an electrical corporation that is a
2122     cooperative association;
2123          (d) a discussion of conditions impacting the [renewable] clean energy source and
2124     qualifying electricity markets;
2125          (e) any recommendation for a suggested legislative or program change; and
2126          (f) for other than a cooperative association, any other information requested by the
2127     commission or considered relevant by the electrical corporation.
2128          (4) The plan and progress report required by Subsections (1) and (2) may include
2129     procedures that will be used by the electrical corporation to identify and select any [renewable]
2130     clean energy resource and qualifying electricity that satisfy the criteria of Subsection
2131     54-17-201(2)(c)(ii).
2132          (5) By July 1, 2026, each electrical corporation shall file a final progress report
2133     demonstrating:

2134          (a) how Subsection 54-17-602(1) is satisfied for the year 2025; or
2135          (b) the reason why Subsection 54-17-602(1) is not satisfied for the year 2025, if it is
2136     not satisfied.
2137          (6) By January 1 of each of the years 2011, 2016, 2021, and 2025, the Division of
2138     Public Utilities shall submit to the Legislature a report containing a summary of any progress
2139     report filed under Subsections (2) through (5).
2140          (7) The summary required by Subsection (6) shall include any recommendation for
2141     legislative changes.
2142          (8) (a) By July 1, 2027, the commission shall submit to the Legislature a report
2143     summarizing the final progress reports and recommending any legislative changes.
2144          (b) The 2027 summary may contain a recommendation to the Legislature concerning
2145     any action to be taken with respect to an electrical corporation that does not satisfy Subsection
2146     54-17-602(1) for 2025.
2147          (c) The commission shall provide an opportunity for public comment and take
2148     evidence before recommending any action to be taken with respect to an electrical corporation
2149     that does not satisfy Subsection 54-17-602(1) for 2025.
2150          (9) If a recommendation containing a penalty for failure to satisfy Subsection
2151     54-17-602(1) is made under Subsection (8), the proposal shall require that any amount paid by
2152     an electrical corporation as a penalty be utilized to fund demand-side management for the retail
2153     customers of the electrical corporation paying the penalty.
2154          (10) A penalty may not be proposed under this section if an electrical corporation's
2155     failure to satisfy Subsection 54-17-602(1) is due to:
2156          (a) a lack of cost-effective means to satisfy the requirement; or
2157          (b) force majeure.
2158          (11) By July 1, 2026, an electrical corporation that is a cooperative association shall
2159     file a final progress report demonstrating:
2160          (a) how Subsection 54-17-602(1) is satisfied for the year 2025; or
2161          (b) the reason why Subsection 54-17-602(1) is not satisfied for the year 2025 if it is not
2162     satisfied.
2163          (12) The plan and any progress report file under this section by an electrical
2164     corporation that is cooperative association shall be publicly available at the cooperative

2165     association's office or posted on the cooperative association's website.
2166          Section 25. Section 54-17-605 is amended to read:
2167          54-17-605. Recovery of costs for clean energy activities.
2168          (1) In accordance with other law, the commission shall include in the retail electric
2169     rates of an electrical corporation whose rates the commission regulates the state's share of any
2170     of the costs listed in Subsection (2) that are relevant to the proceeding in which the commission
2171     is considering the electrical corporation's rates:
2172          (a) if the costs are prudently incurred by the electrical corporation in connection with:
2173          (i) the acquisition of a renewable energy certificate;
2174          (ii) the acquisition of qualifying electricity for which a renewable energy certificate
2175     will be issued after the acquisition; and
2176          (iii) the acquisition, construction, and use of a [renewable] clean energy source; and
2177          (b) to the extent any qualifying electricity or [renewable] clean energy source under
2178     Subsection (1)(a) satisfies the cost-effectiveness criteria of Subsection 54-17-201(2)(c)(ii).
2179          (2) The following are costs that may be recoverable under Subsection (1):
2180          (a) a cost of siting, acquisition of property rights, equipment, design, licensing,
2181     permitting, construction, owning, operating, or otherwise acquiring a [renewable] clean energy
2182     source and any associated asset, including transmission;
2183          (b) a cost to acquire qualifying electricity through trade, power purchase, or other
2184     transfer;
2185          (c) a cost to acquire a bundled or unbundled renewable energy certificate, if any net
2186     revenue from the sale of a renewable energy certificate allocable to this state is also included in
2187     rates;
2188          (d) a cost to interconnect a [renewable] clean energy source to the electrical
2189     corporation's transmission and distribution system;
2190          (e) a cost associated with using a physical or financial asset to integrate, firm, or shape
2191     a [renewable] clean energy source on a firm annual basis to meet a retail electricity need; and
2192          (f) any cost associated with transmission and delivery of qualifying electricity to a
2193     retail electricity consumer.
2194          (3) (a) The commission may allow an electrical corporation to use an adjustment
2195     mechanism or reasonable method other than a rate case under Sections 54-4-4 and 54-7-12 to

2196     allow recovery of costs identified in Subsection (2).
2197          (b) If the commission allows the use of an adjustment mechanism, both the costs and
2198     any associated benefit shall be reflected in the mechanism, to the extent practicable.
2199          (c) This Subsection (3) creates no presumption for or against the use of an adjustment
2200     mechanism.
2201          (4) (a) The commission may permit an electrical corporation to include in its retail
2202     electric rates the state's share of costs prudently incurred by the electrical corporation in
2203     connection with a [renewable] clean energy source, whether or not the [renewable] clean
2204     energy source ultimately becomes operational, including costs of:
2205          (i) siting;
2206          (ii) property acquisition;
2207          (iii) equipment;
2208          (iv) design;
2209          (v) licensing;
2210          (vi) permitting; and
2211          (vii) other reasonable items related to the [renewable] clean energy source.
2212          (b) Subsection (4)(a) creates no presumption concerning the prudence or recoverability
2213     of the costs identified.
2214          (c) To the extent deferral is consistent with other applicable law, the commission may
2215     allow an electrical corporation to defer costs recoverable under Subsection (4)(a) until the
2216     recovery of the deferred costs can be considered in a rate proceeding or an adjustment
2217     mechanism created under Subsection (3).
2218          (d) An application to defer costs shall be filed within 60 days after the day on which
2219     the electrical corporation determines that the [renewable] clean energy source project is
2220     impaired under generally accepted accounting principles and will not become operational.
2221          (e) Notwithstanding the opportunity to defer costs under Subsection (4)(c), a cost
2222     incurred by an electrical corporation for siting, property acquisition, equipment, design,
2223     licensing, and permitting of a [renewable] clean energy source that the electrical corporation
2224     proposes to construct shall be included in the electrical corporation's project costs for the
2225     purpose of evaluating the project's cost-effectiveness.
2226          (f) A deferred cost under Subsection (4)(a) may not be added to, or otherwise

2227     considered in the evaluation of, the cost of a project proposed by any person other than the
2228     electrical corporation for the purpose of evaluating that person's proposal.
2229          Section 26. Section 54-17-801 is amended to read:
2230          54-17-801. Definitions.
2231          As used in this part:
2232          (1) "Clean energy contract" means a contract under this part for the delivery of
2233     electricity from one or more clean energy facilities to a contract customer requiring the use of a
2234     qualified utility's transmission or distribution system to deliver the electricity from a clean
2235     energy facility to the contract customer.
2236          (2) (a) "Clean energy facility" means a clean energy source as defined in Section
2237     54-17-601 that:
2238          (i) is located in the state; or
2239          (ii) (A) is located outside the state; and
2240          (B) provides energy from baseload clean resources.
2241          (b) "Clean energy facility" does not include an electric generating facility for which the
2242     electric generating facility's costs are included in a qualified utility's rates as a facility that
2243     provides electric service to the qualified utility's system.
2244          (3) "Clean energy tariff" means a tariff offered by a qualified utility that allows the
2245     qualified utility to procure clean generation on behalf of and to serve its customers.
2246          (4) "Contract customer" means a person who executes or will execute a [renewable]
2247     clean energy contract with a qualified utility.
2248          [(2)] (5) "Qualified utility" means an electric corporation that serves more than 200,000
2249     retail customers in the state.
2250          [(3) "Renewable energy contract" means a contract under this part for the delivery of
2251     electricity from one or more renewable energy facilities to a contract customer requiring the use
2252     of a qualified utility's transmission or distribution system to deliver the electricity from a
2253     renewable energy facility to the contract customer.]
2254          [(4) (a) "Renewable energy facility" means a renewable energy source as defined in
2255     Section 54-17-601 that:]
2256          [(i) is located in the state; or]
2257          [(ii) (A) is located outside the state; and]

2258          [(B) provides energy from baseload renewable resources.]
2259          [(b) "Renewable energy facility" does not include an electric generating facility for
2260     which the electric generating facility's costs are included in a qualified utility's rates as a facility
2261     that provides electric service to the qualified utility's system.]
2262          [(5) "Renewable energy tariff" means a tariff offered by a qualified utility that allows
2263     the qualified utility to procure renewable generation on behalf of and to serve its customers.]
2264          Section 27. Section 54-17-802 is amended to read:
2265          54-17-802. Contracts for the purchase of electricity from a clean energy facility.
2266          (1) Within a reasonable time after receiving a request from a contract customer and
2267     subject to reasonable credit requirements, a qualified utility shall enter into a [renewable] clean
2268     energy contract with the requesting contract customer to supply some or all of the contract
2269     customer's electric service from one or more [renewable] clean energy facilities selected by the
2270     contract customer.
2271          (2) Subject to a contract customer agreeing to pay the qualified utility for all
2272     incremental costs associated with metering facilities, communication facilities, and
2273     administration, a [renewable] clean energy contract may provide for electricity to be delivered
2274     to a contract customer:
2275          (a) from one [renewable] clean energy facility to a contract customer's single metered
2276     delivery location;
2277          (b) from multiple [renewable] clean energy facilities to a contract customer's single
2278     metered delivery location; or
2279          (c) from one or more [renewable] clean energy facilities to a single contract customer's
2280     multiple metered delivery locations.
2281          (3) (a) A single contract customer may aggregate multiple metered delivery locations to
2282     satisfy the minimum megawatt limit under Subsection (4).
2283          (b) Multiple contract customers may not aggregate their separate metered delivery
2284     locations to satisfy the minimum megawatt limit under Subsection (4).
2285          (4) The amount of electricity provided to a contract customer under a [renewable] clean
2286     energy contract may not be less than 2.0 megawatts.
2287          (5) The amount of electricity provided in any hour to a contract customer under a
2288     [renewable] clean energy contract may not exceed the contract customer's metered

2289     kilowatt-hour load in that hour at the metered delivery locations under the contract.
2290          (6) A [renewable] clean energy contract that meets the requirements of Subsection (4)
2291     may provide for one or more increases in the amount of electricity to be provided under the
2292     contract even though the amount of electricity to be provided by the increase is less than the
2293     minimum amount required under Subsection (4).
2294          (7) The total amount of electricity to be generated by [renewable] clean energy
2295     facilities and delivered to contract customers at any one time under all [renewable] clean
2296     energy contracts may not exceed 300 megawatts, unless the commission approves in advance a
2297     higher amount.
2298          (8) Electricity generated by a [renewable] clean energy facility and delivered to a
2299     contract customer under a [renewable] clean energy contract may not be included in a net
2300     metering program under Chapter 15, Net Metering of Electricity.
2301          Section 28. Section 54-17-803 is amended to read:
2302          54-17-803. Ownership of a clean energy facility -- Joint ownership -- Ownership
2303     of environmental attributes.
2304          (1) A [renewable] clean energy facility may be owned:
2305          (a) by a person who will be a contract customer receiving electricity from the
2306     [renewable] clean energy facility;
2307          (b) by a qualified utility;
2308          (c) by a person other than a contract customer or qualified utility; or
2309          (d) jointly by any combination of Subsections (1)(a), (b), and (c), whether in equal
2310     shares or otherwise.
2311          (2) A qualified utility may be a joint owner of a [renewable] clean energy facility only
2312     if:
2313          (a) the qualified utility consents to being a joint owner; and
2314          (b) the joint ownership agreement requires the qualified utility to recover from contract
2315     customers receiving electricity from the [renewable] clean energy facility all of the qualified
2316     utility's costs associated with its ownership of the [renewable] clean energy facility, including
2317     administrative, acquisition, operation, and maintenance costs, unless the commission, in an
2318     order issued in a separate regulatory proceeding:
2319          (i) authorizes the qualified utility to recover some of those costs from customers other

2320     than contract customers;
2321          (ii) determines that the rate to be paid for electricity from the [renewable] clean energy
2322     facility by customers other than contract customers is cost effective; and
2323          (iii) approves the inclusion of the rate determined under Subsection (2)(b)(ii) in general
2324     rates or through a commission approved cost recovery mechanism.
2325          (3) To the extent that any electricity from a [renewable] clean energy facility to be
2326     delivered to a contract customer is owned by a person other than the contract customer:
2327          (a) the qualified utility shall, by contract with the owner of the electricity to be sold
2328     from the [renewable] clean energy facility, purchase electricity for resale to one or more
2329     contract customers;
2330          (b) the qualified utility shall sell that electricity to the contract customer or customers
2331     under [renewable] clean energy contracts with the same duration and pricing as the contract
2332     between the qualified utility and the owner of the electricity to be sold from the [renewable]
2333     clean energy facility; and
2334          (c) the qualified utility's contract with the owner of the electricity to be sold from the
2335     [renewable] clean energy facility shall provide that the qualified utility's obligation to purchase
2336     electricity under that contract ceases if the contract customer defaults in its obligation to
2337     purchase and pay for the electricity under the contract with the qualified utility.
2338          (4) The right to any environmental attribute associated with a [renewable] clean energy
2339     facility shall remain the property of the [renewable] clean energy facility's owner, except to the
2340     extent that a contract to which the owner is a party provides otherwise.
2341          Section 29. Section 54-17-804 is amended to read:
2342          54-17-804. Exemption from certificate of convenience and necessity
2343     requirements.
2344          (1) A qualified utility is not required to comply with Section 54-4-25 with respect to a
2345     [renewable] clean energy facility that is the subject of a [renewable] clean energy contract if:
2346          (a) each contract necessary for the commission to determine compliance with this part
2347     is filed with the commission; and
2348          (b) the commission determines that each contract relating to the [renewable] clean
2349     energy facility complies with this part.
2350          (2) In making its determination under Subsection (1)(b), the commission may process

2351     and consider together multiple [renewable] clean energy contracts between the same contract
2352     customer and the qualified utility providing for the delivery of electricity from a [renewable]
2353     clean energy facility to the contract customer's multiple metered delivery locations.
2354          Section 30. Section 54-17-805 is amended to read:
2355          54-17-805. Costs associated with delivering electricity from a clean energy facility
2356     to a contract customer.
2357          (1) To the extent that a [renewable] clean energy contract provides for the delivery of
2358     electricity from a [renewable] clean energy facility owned by the contract customer, the
2359     [renewable] clean energy contract shall require the contract customer to pay for the use of the
2360     qualified utility's transmission or distribution facilities at the qualified utility's applicable rates,
2361     which may include transmission costs at the qualified utility's applicable rate approved by the
2362     Federal Energy Regulatory Commission.
2363          (2) To the extent that a [renewable] clean energy contract provides for the delivery of
2364     electricity from a [renewable] clean energy facility owned by a person other than the qualified
2365     utility or the contract customer, the [renewable] clean energy contract shall require the contract
2366     customer to bear all reasonably identifiable costs that the qualified utility incurs in delivering
2367     the electricity from the [renewable] clean energy facility to the contract customer, including all
2368     costs to procure and deliver electricity and for billing, administrative, and related activities, as
2369     determined by the commission.
2370          (3) A qualified utility that enters a [renewable] clean energy contract shall charge a
2371     contract customer for all metered electric service delivered to the contract customer, including
2372     generation, transmission, and distribution service, at the qualified utility's applicable tariff
2373     rates, excluding:
2374          (a) any kilowatt hours of electricity delivered from the [renewable] clean energy
2375     facility, based on the time of delivery, adjusted for transmission losses;
2376          (b) any kilowatts of electricity delivered from the [renewable] clean energy facility that
2377     coincide with the contract customer's monthly metered kilowatt demand measurement, adjusted
2378     for transmission losses;
2379          (c) any transmission and distribution service that the contract customer pays for under
2380     Subsection (1) or (2); and
2381          (d) any transmission service that the contract customer provides under Subsection (2)

2382     to deliver generation from the [renewable] clean energy facility.
2383          Section 31. Section 54-17-806 is amended to read:
2384          54-17-806. Qualified utility clean energy tariff.
2385          (1) The commission may authorize a qualified utility to implement a [renewable] clean
2386     energy tariff in accordance with this section if the commission determines the tariff that the
2387     qualified utility proposes is reasonable and in the public interest.
2388          (2) The commission may authorize a tariff under Subsection (1) to apply to:
2389          (a) a qualified utility customer with an aggregated electrical load of at least five
2390     megawatts; or
2391          (b) a combination of qualified utility customers who are separately metered if:
2392          (i) the aggregated electrical load of the qualified utility customers is at least five
2393     megawatts; and
2394          (ii) each of the qualified utility customers is located within a project area, as defined in
2395     Section 11-58-102.
2396          (3) A customer who agrees to take service that is subject to the [renewable] clean
2397     energy tariff under this section shall pay:
2398          (a) the customer's normal tariff rate;
2399          (b) an incremental charge in an amount equal to the difference between the cost to the
2400     qualified utility to supply [renewable] clean generation to the [renewable] clean energy tariff
2401     customer and the qualified utility's avoided costs as defined in Subsection 54-2-1(1), or a
2402     different methodology recommended by the qualified utility; and
2403          (c) an administrative fee in an amount approved by the commission.
2404          (4) The commission shall allow a qualified utility to recover the qualified utility's
2405     prudently incurred cost of [renewable] clean generation procured pursuant to the tariff
2406     established in this section that is not otherwise recovered from the proceeds of the tariff paid by
2407     customers agreeing to service that is subject to the [renewable] clean energy tariff.
2408          Section 32. Section 54-17-807 is amended to read:
2409          54-17-807. Solar photovoltaic or thermal solar energy facilities.
2410          (1) As used in this section, "acquire" means to purchase, construct, or purchase the
2411     output from a photovoltaic or thermal solar energy resource.
2412          (2) (a) In accordance with this section, a qualified utility may file an application with

2413     the commission for approval to acquire a photovoltaic or thermal solar energy resource using
2414     rate recovery based on a competitive market price, except as provided in Subsection (2)(b).
2415          (b) A qualified utility may not, under this section, acquire a photovoltaic or thermal
2416     solar energy resource with a generating capacity that is two megawatts or less per meter if that
2417     resource is located on the customer's side of the meter.
2418          (3) The energy resource acquired pursuant to this section may be owned solely or
2419     jointly by a qualified utility or another entity:
2420          (a) to provide [renewable] clean energy to a contract customer as provided in Section
2421     54-17-803;
2422          (b) to serve energy to a qualified utility customer as provided in Section 54-17-806;
2423          (c) to serve energy to any customers of the qualified utility if the proposed energy
2424     resource's nameplate capacity does not exceed 300 megawatts or, if applicable, the quantity of
2425     capacity that is the subject of a contract for the purchase of electricity does not exceed 300
2426     megawatts, so long as the qualified utility proceeds under and complies with Part 4, Voluntary
2427     Request for Resource Decision Review; or
2428          (d) to serve energy to any customers of the qualified utility if the proposed energy
2429     resource's nameplate capacity exceeds 300 megawatts or, if applicable, the quantity of capacity
2430     that is the subject of a contract for the purchase of electricity exceeds 300 megawatts, so long
2431     as the qualified utility complies with this chapter.
2432          (4) Except as provided in Subsections (3)(c) and (d), the following do not apply to an
2433     application submitted under Subsection (2):
2434          (a) Part 1, General Provisions;
2435          (b) Part 2, Solicitation Process;
2436          (c) Part 3, Resource Plans and Significant Energy Resource Approval;
2437          (d) Part 4, Voluntary Request for Resource Decision Review; and
2438          (e) Section 54-17-502.
2439          (5) The application described in Subsection (2) shall include:
2440          (a) a proposed solicitation process for the energy resource;
2441          (b) the criteria proposed to be used to evaluate the responses to the solicitation:
2442          (i) as determined by the customer, if the energy resource is sought to serve a customer
2443     pursuant to Subsection (3)(a) or (b); or

2444          (ii) as proposed by the qualified utility, if the energy resource is sought to serve the
2445     customers of the qualified utility pursuant to Subsection (3)(c) or (d); and
2446          (c) any other information the commission may require.
2447          (6) (a) Before approving a solicitation process under this section for an energy resource
2448     to serve customers of the qualified utility pursuant to Subsection (3)(c) or (d), the commission
2449     shall:
2450          (i) hold a public hearing; and
2451          (ii) provide an opportunity for public comment.
2452          (b) The commission may approve a solicitation process under this section only if the
2453     commission determines that the solicitation and evaluation processes to be used will create a
2454     level playing field in which the qualified utility and other bidders can compete fairly, including
2455     with respect to interconnection and transmission requirements imposed on bidders by the
2456     solicitation within the control of the commission and the qualified utility, excluding its
2457     federally regulated transmission function, and will otherwise serve the public interest.
2458          (7) (a) Upon completion of the solicitation process approved under Subsection (6), the
2459     qualified utility may seek approval from the commission to acquire the energy resource
2460     identified through the solicitation process as the winning bid.
2461          (b) Before approving acquisition of an energy resource acquired pursuant to this
2462     section, the commission shall:
2463          (i) hold a public hearing;
2464          (ii) provide an opportunity for public comment;
2465          (iii) determine whether the solicitation and evaluation processes complied with this
2466     section, commission rules, and the commission's order approving the solicitation process; and
2467          (iv) determine whether the acquisition of the energy resource is just and reasonable,
2468     and in the public interest.
2469          (c) The commission may approve a qualified utility's ownership of an energy resource
2470     or a power purchase agreement containing a purchase option under Subsection (3)(c) or (d)
2471     with rate recovery based on a competitive market price only if the commission determines that
2472     the qualified utility's bid is the lowest cost ownership option for the qualified utility.
2473          (d) If the commission approves a qualified utility's acquisition of an energy resource
2474     under Subsection (3), including entering into a power purchase agreement containing a

2475     purchase option, using rate recovery based on a competitive market price:
2476          (i) the prices approved by the commission shall constitute competitive market prices
2477     for purposes of this section; and
2478          (ii) assets owned by the qualified utility and used to provide service as approved under
2479     this section are not public utility property.
2480          (8) If upon completion of a solicitation process approved under Subsection (6) the
2481     qualified utility proposes not to acquire an energy resource, the qualified utility shall file with
2482     the commission a report explaining its reasons for not acquiring the lowest cost resource bid
2483     into the solicitation, along with any other information the commission requires.
2484          (9) Within six months after a competitive market price for a solar energy resource
2485     acquired under Subsection (3)(c) or (d) has been identified pursuant to this section, or for such
2486     longer period as the commission may determine to be in the public interest, a qualified utility
2487     may file an application with the commission seeking approval to acquire another energy
2488     resource similar to the energy resource for which a competitive market price was established
2489     without going through a new solicitation process. The commission may approve the application
2490     if the qualified utility demonstrates a need to acquire the energy resource, that the competitive
2491     market price remains reasonable, and that the acquisition is in the public interest.
2492          (10) No later than 180 days before the end of the term approved by the commission for
2493     an energy resource acquired under this section and owned by the qualified utility, the qualified
2494     utility shall file with the commission a request for determination of an appropriate disposition
2495     of the energy resource asset, except that the qualified utility is permitted to retain the benefits
2496     or proceeds and shall be required to assume the costs and risks of ownership of the energy
2497     resource.
2498          (11) The commission shall adopt rules, in accordance with Title 63G, Chapter 3, Utah
2499     Administrative Rulemaking Act:
2500          (a) addressing the content and filing of an application under this section;
2501          (b) to establish the solicitation process and criteria to be used to identify the
2502     competitive market price and select an energy resource; and
2503          (c) addressing other factors determined by the commission to be relevant to protect the
2504     public interest and to implement this section.
2505          Section 33. Section 54-17-901 is amended to read:

2506          54-17-901. Community Clean Energy Act.
2507          This part is known as the "Community [Renewable] Clean Energy Act."
2508          Section 34. Section 54-17-902 is amended to read:
2509          54-17-902. Definitions.
2510          As used in this part:
2511          (1) (a) "Auxiliary services" means those services necessary to safely and reliably:
2512          (i) interconnect and transmit electric power from any [renewable] clean energy
2513     resource constructed or acquired for a community [renewable] clean energy program; and
2514          (ii) integrate and supplement electric power from any [renewable] clean energy
2515     resource.
2516          (b) "Auxiliary services" shall include applicable Federal Energy Regulatory
2517     Commission requirements governing transmission and interconnection services.
2518          (2) "Clean electric energy supply" means incremental clean energy resources that are
2519     developed to meet the equivalent of the annual electric energy consumption of participating
2520     customers within a participating community.
2521          (3) "Clean energy resource" means:
2522          (a) electric energy generated by a source that is naturally replenished and includes one
2523     or more of the following:
2524          (i) wind;
2525          (ii) solar photovoltaic or thermal solar technology;
2526          (iii) a geothermal resource; or
2527          (iv) a hydroelectric plant including a pumped storage hydropower facility;
2528          (b) use of an energy efficient and sustainable technology the commission has approved
2529     for implementation that:
2530          (i) increases efficient energy usage;
2531          (ii) is capable of being used for demand response;
2532          (iii) facilitates the use and development of clean generation resources through electrical
2533     grid management or energy storage; or
2534          (iv) uses carbon capture utilization and sequestration; or
2535          (c) energy derived from nuclear fuel.
2536          [(2)] (4) "Commission" means the Public Service Commission created in Section

2537     54-1-1.
2538          [(3)] (5) "Community [renewable] clean energy program" means the program approved
2539     by the commission under Section 54-17-904 that allows a qualified utility to provide electric
2540     service from one or more [renewable] clean energy resources to a participating customer within
2541     a participating community.
2542          [(4)] (6) "County" means the unincorporated area of a county.
2543          [(5)] (7) "Division" means the Division of Public Utilities created in Section 54-4a-1.
2544          [(6)] (8) (a) "Initial opt-out period" means the period of time immediately after the
2545     community [renewable] clean energy program's commencement, as established by the
2546     commission by rule made pursuant to Section 54-17-909, during which a participating
2547     customer may elect to leave the program without penalty.
2548          (b) "Initial opt-out period" may not be shorter than three typical billing cycles of the
2549     qualified utility.
2550          [(7)] (9) "Municipality" means a city or a town as defined in Section 10-1-104.
2551          [(8)] (10) "Office" means the Office of Consumer Services created in Section
2552     54-10a-101.
2553          [(9)] (11) "Ongoing costs" means the costs allocated to the state for transmission and
2554     distribution facilities, retail services, and generation assets that are not replaced assets.
2555          [(10)] (12) "Participating community" means a municipality or a county:
2556          (a) whose residents are served by a qualified utility; and
2557          (b) the municipality or county meets the requirements in Section 54-17-903.
2558          [(11)] (13) "Participating customer" means:
2559          (a) a customer of a qualified utility located within the boundary of a municipality or
2560     county where a community [renewable] clean energy program has been approved by the
2561     commission; and
2562          (b) the customer has not exercised the right to not participate in the community
2563     [renewable] clean energy program as provided in Section 54-17-905.
2564          [(12)] (14) "Qualified utility" means the same as that term is defined in Section
2565     54-17-801.
2566          [(13) "Renewable electric energy supply" means incremental renewable energy
2567     resources that are developed to meet the equivalent of the annual electric energy consumption

2568     of participating customers within a participating community.]
2569          [(14) "Renewable energy resource" means:]
2570          [(a) electric energy generated by a source that is naturally replenished and includes one
2571     or more of the following:]
2572          [(i) wind;]
2573          [(ii) solar photovoltaic or thermal solar technology;]
2574          [(iii) a geothermal resource; or]
2575          [(iv) a hydroelectric plant; or]
2576          [(b) use of an energy efficient and sustainable technology the commission has approved
2577     for implementation that:]
2578          [(i) increases efficient energy usage;]
2579          [(ii) is capable of being used for demand response; or]
2580          [(iii) facilitates the use and development of renewable generation resources through
2581     electrical grid management or energy storage.]
2582          (15) "Replaced asset" means an existing thermal energy resource:
2583          (a) that was built or acquired, in whole or in part, by a qualified utility to serve the
2584     qualified utility's customers, including customers within a participating community;
2585          (b) that was built or acquired prior to commission approval and the effective date of the
2586     community [renewable] clean energy program; and
2587          (c) to the extent the asset is no longer used to serve participating customers.
2588          Section 35. Section 54-17-903 is amended to read:
2589          54-17-903. Program requirement for a municipality or county.
2590          (1) (a) As used in this section, "renewable energy resource" means the same as the term
2591     "clean energy resource" is defined in Section 54-17-902.
2592          (b) Customers of a qualified utility may be served by the community [renewable] clean
2593     energy program described in this part if the municipality or county satisfies the requirements of
2594     Subsection (2).
2595          (2) The municipality or county in which the customer resides shall:
2596          (a) adopt a resolution no later than December 31, 2019, that states a goal of achieving
2597     an amount equivalent to 100% of the annual electric energy supply for participating customers
2598     from a renewable energy resource by 2030;

2599          (b) enter into an agreement with a qualified utility:
2600          (i) with the stipulation of payment by the municipality or county to the qualified utility
2601     for the costs of:
2602          (A) third-party expertise contracted for by the division and the office, for assistance
2603     with activities associated with initial approval of the community [renewable] clean energy
2604     program; and
2605          (B) providing notice to the municipality's or county's customers as provided in Section
2606     54-17-905;
2607          (ii) determining the obligation for the payment of any termination charges under
2608     Subsection 54-17-905(3) that are not paid by a participating customer and not included in
2609     participating customer rates under Subsections 54-17-904(2) and (4); and
2610          (iii) identifying any initially proposed replaced asset;
2611          (c) adopt a local ordinance that:
2612          (i) establishes participation in the [renewable] clean energy program; and
2613          (ii) is consistent with the terms of the agreement entered into with the qualified utility
2614     under Subsection (2)(b); and
2615          (d) comply with any other terms or conditions required by the commission.
2616          (3) The local ordinance required in Subsection (2)(c) shall be adopted by the
2617     municipality or county within 90 days after the date of the commission order approving the
2618     community [renewable] clean energy program.
2619          Section 36. Section 54-17-904 is amended to read:
2620          54-17-904. Authority of commission to approve a community clean energy
2621     program.
2622          (1) After the commission has adopted administrative rules as required under Section
2623     54-17-909, a qualified utility may file an application with the commission for approval of a
2624     community [renewable] clean energy program.
2625          (2) The application shall include:
2626          (a) the names of each municipality and county to be served by the community
2627     [renewable] clean energy program;
2628          (b) a map of the geographic boundaries of each municipality and county;
2629          (c) the number of customers served by the qualified utility within those boundaries;

2630          (d) projected rates for participating customers that take into account:
2631          (i) the estimated number of customers expected to participate in the program;
2632          (ii) the quantifiable costs and benefits to the qualified utility and all of the qualified
2633     utility's customers in their capacity as ratepayers of the qualified utility, excluding costs or
2634     benefits that do not directly affect the qualified utility, including as applicable:
2635          (A) replaced assets;
2636          (B) auxiliary services; and
2637          (C) new [renewable] clean energy resources used to serve the community [renewable]
2638     clean energy program; and
2639          (iii) the ongoing costs at the time of the application;
2640          (e) the agreement entered into with the qualified utility under Section 54-17-903;
2641          (f) a proposed plan established by the participating community addressing low-income
2642     programs and assistance;
2643          (g) a proposed solicitation process for the acquisition of [renewable] clean energy
2644     resources as provided in Section 54-17-908; and
2645          (h) any other information the commission may require by rule.
2646          (3) The commission may approve an application for a community [renewable] clean
2647     energy program if the commission finds:
2648          (a) the application meets all of the requirements in this section and administrative rules
2649     adopted by the commission in accordance with Sections 54-17-908 and 54-17-909 to
2650     implement this part; and
2651          (b) the community [renewable] clean energy program is in the public interest.
2652          (4) The rates approved by the commission for participating customers:
2653          (a) shall be based on the factors included in Subsection (2)(d) and any other factor
2654     determined by the commission to be in the public interest;
2655          (b) may not result in any shift of costs or benefits to any nonparticipating customer, or
2656     any other customer of the qualified utility beyond the participating community boundaries; and
2657          (c) shall take into account any quantifiable benefits to the qualified utility, and the
2658     qualified utility's customers, including participating customers in their capacity as ratepayers of
2659     the qualified utility, excluding costs or benefits that do not directly affect the qualified utility's
2660     costs of service.

2661          (5) (a) Each municipality or county included in the application shall be a party to the
2662     regulatory proceeding.
2663          (b) A municipality or county identified in the application shall provide information to
2664     all relevant parties in accordance with the commission's rules for discovery, notwithstanding
2665     Title 63G, Chapter 2, Government Records Access and Management Act.
2666          (6) The community [renewable] clean energy program may not be implemented until
2667     after the municipality or county adopts the ordinance required in Section 54-17-903.
2668          Section 37. Section 54-17-905 is amended to read:
2669          54-17-905. Customer participation -- Election not to participate.
2670          (1) (a) After commission approval of a community [renewable] clean energy program
2671     and adoption of the ordinance by the participating community as required in Section
2672     54-17-903, a qualified utility shall provide notice to each of its customers within the
2673     participating community that includes:
2674          (i) the projected rates and terms of participation in the community [renewable] clean
2675     energy program approved by the commission;
2676          (ii) an estimated comparison to otherwise applicable existing rates;
2677          (iii) an explanation that the customer may elect to not participate in the community
2678     [renewable] clean energy program by notifying the qualified utility; and
2679          (iv) any other information required by the commission.
2680          (b) The qualified utility shall provide the notice required under Subsection (1)(a) to
2681     each customer:
2682          (i) no less than twice within the period of 60 days immediately preceding the date
2683     required to opt out of the community [renewable] clean energy program; and
2684          (ii) separately from the customer's monthly billing.
2685          (c) The qualified utility shall provide the information required under Subsection (1)(a)
2686     in person to each customer with an electric load of one megawatt or greater measured at a
2687     single meter.
2688          (2) (a) An existing customer of the qualified utility may elect to not participate in the
2689     community [renewable] clean energy program and continue to pay applicable existing rates by
2690     giving notice to the qualified utility in the manner and within the time period determined by the
2691     commission.

2692          (b) After implementation of the community [renewable] clean energy program:
2693          (i) a customer that previously elected not to participate in the program may become a
2694     participating customer as allowed by commission rules and by giving notice to the qualified
2695     utility in the manner required by the commission; and
2696          (ii) a customer of the qualified utility that begins taking electric service within a
2697     participating community after the date of implementation of the community [renewable] clean
2698     energy program shall:
2699          (A) be given notice as determined by the commission; and
2700          (B) shall become a participating customer unless the person elects not to participate by
2701     giving notice to the qualified utility in the manner and within the time period determined by the
2702     commission.
2703          (3) (a) A customer that does not opt out of the community [renewable] clean energy
2704     program under Subsection (2) may later discontinue participation in the community
2705     [renewable] clean energy program as allowed by the commission as described in Subsection
2706     (3)(b) or (c).
2707          (b) (i) During the initial opt-out period, a participating customer may elect to leave the
2708     program by giving notice to the qualified utility in the manner determined by the commission.
2709          (ii) A participating customer that opts out as described in Subsection (3)(b)(i) is not
2710     subject to a termination charge.
2711          (c) After the community [renewable] clean energy program's initial opt-out period, a
2712     participating customer may elect to leave the program by:
2713          (i) giving notice to the qualified utility in the manner determined by the commission;
2714     and
2715          (ii) paying a termination charge as determined by the commission that may include the
2716     cost of [renewable] clean energy resources acquired or constructed for the community
2717     [renewable] clean energy program that are not being utilized by participating customers as
2718     necessary to prevent shifting costs to other customers of the qualified utility.
2719          (4) (a) A customer of a qualified utility that is annexed into the boundaries of a
2720     participating community after the effective date of the community [renewable] clean energy
2721     program shall be given notice as provided in Subsection (1) advising the customer of the option
2722     to opt out of the program.

2723          (b) A participating customer located in a portion of a county that is annexed into a
2724     municipality that is not a participating community shall continue to be included in the
2725     [renewable] clean energy program if the customer remains a customer of the qualified utility.
2726          (c) If a participating customer is annexed into a municipality that provides electric
2727     service to the municipality's residents:
2728          (i) the customer may continue to be served by the qualified utility under the community
2729     [renewable] clean energy program if the qualified utility enters into an agreement with the
2730     municipality under Section 54-3-30; or
2731          (ii) the municipality shall pay the termination charge for each participating customer
2732     that is no longer served by the qualified utility.
2733          (5) A residential customer that is participating in the net metering program under Title
2734     54, Chapter 15, Net Metering of Electricity, may not be a participating customer under this
2735     part.
2736          (6) (a) The cost of providing notice under Subsection (1) shall be paid by the
2737     participating communities.
2738          (b) All other notices required under this section shall be paid for as program costs and
2739     recovered through participating customers' rates.
2740          Section 38. Section 54-17-906 is amended to read:
2741          54-17-906. Customer billing.
2742          The qualified utility shall:
2743          (1) include information on its monthly bills to participating customers identifying the
2744     community [renewable] clean energy program cost; and
2745          (2) provide notice to participating customers of any change in rate for participation in
2746     the community [renewable] clean energy program.
2747          Section 39. Section 54-17-908 is amended to read:
2748          54-17-908. Acquisition of clean energy resources.
2749          (1) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
2750     commission shall make rules outlining a competitive solicitation process for the acquisition of
2751     [renewable] clean assets acquired by the qualified utility for purposes of this act.
2752          (2) The solicitation rules shall include the following provisions:
2753          (a) solar photovoltaic or thermal solar energy facilities may be acquired under the

2754     provisions of Section 54-17-807;
2755          (b) [renewable] clean energy resources developed under this part shall be constructed
2756     or acquired subject to an option by the qualified utility to own the [renewable] clean energy
2757     resource so long as including the option in a solicitation is in the interest of participating
2758     customers and other customers of the qualified utility; and
2759          (c) any other requirement determined by the commission to be in the public interest.
2760          (3) Upon completion of a solicitation under this section and the rules adopted by the
2761     commission to implement this section, the commission may approve cost recovery for a
2762     [renewable] clean energy resource for the community [renewable] clean energy program if
2763     approval of the [renewable] clean energy resource:
2764          (a) complies with the provisions of this part;
2765          (b) does not result in shifting of costs or benefits to other customers of the qualified
2766     utility; and
2767          (c) is in the public interest.
2768          Section 40. Section 59-2-102 is amended to read:
2769          59-2-102. Definitions.
2770          As used in this chapter:
2771          (1) (a) "Acquisition cost" means any cost required to put an item of tangible personal
2772     property into service.
2773          (b) "Acquisition cost" includes:
2774          (i) the purchase price of a new or used item;
2775          (ii) the cost of freight, shipping, loading at origin, unloading at destination, crating,
2776     skidding, or any other applicable cost of shipping;
2777          (iii) the cost of installation, engineering, rigging, erection, or assembly, including
2778     foundations, pilings, utility connections, or similar costs; and
2779          (iv) sales and use taxes.
2780          (2) "Aerial applicator" means aircraft or rotorcraft used exclusively for the purpose of
2781     engaging in dispensing activities directly affecting agriculture or horticulture with an
2782     airworthiness certificate from the Federal Aviation Administration certifying the aircraft or
2783     rotorcraft's use for agricultural and pest control purposes.
2784          (3) "Air charter service" means an air carrier operation that requires the customer to

2785     hire an entire aircraft rather than book passage in whatever capacity is available on a scheduled
2786     trip.
2787          (4) "Air contract service" means an air carrier operation available only to customers
2788     that engage the services of the carrier through a contractual agreement and excess capacity on
2789     any trip and is not available to the public at large.
2790          (5) "Aircraft" means the same as that term is defined in Section 72-10-102.
2791          (6) (a) Except as provided in Subsection (6)(b), "airline" means an air carrier that:
2792          (i) operates:
2793          (A) on an interstate route; and
2794          (B) on a scheduled basis; and
2795          (ii) offers to fly one or more passengers or cargo on the basis of available capacity on a
2796     regularly scheduled route.
2797          (b) "Airline" does not include an:
2798          (i) air charter service; or
2799          (ii) air contract service.
2800          (7) "Assessment roll" or "assessment book" means a permanent record of the
2801     assessment of property as assessed by the county assessor and the commission and may be
2802     maintained manually or as a computerized file as a consolidated record or as multiple records
2803     by type, classification, or categories.
2804          (8) "Base parcel" means a parcel of property that was legally:
2805          (a) subdivided into two or more lots, parcels, or other divisions of land; or
2806          (b) (i) combined with one or more other parcels of property; and
2807          (ii) subdivided into two or more lots, parcels, or other divisions of land.
2808          (9) (a) "Certified revenue levy" means a property tax levy that provides an amount of
2809     ad valorem property tax revenue equal to the sum of:
2810          (i) the amount of ad valorem property tax revenue to be generated statewide in the
2811     previous year from imposing a multicounty assessing and collecting levy, as specified in
2812     Section 59-2-1602; and
2813          (ii) the product of:
2814          (A) eligible new growth, as defined in Section 59-2-924; and
2815          (B) the multicounty assessing and collecting levy certified by the commission for the

2816     previous year.
2817          (b) For purposes of this Subsection (9), "ad valorem property tax revenue" does not
2818     include property tax revenue received by a taxing entity from personal property that is:
2819          (i) assessed by a county assessor in accordance with Part 3, County Assessment; and
2820          (ii) semiconductor manufacturing equipment.
2821          (c) For purposes of calculating the certified revenue levy described in this Subsection
2822     (9), the commission shall use:
2823          (i) the taxable value of real property assessed by a county assessor contained on the
2824     assessment roll;
2825          (ii) the taxable value of real and personal property assessed by the commission; and
2826          (iii) the taxable year end value of personal property assessed by a county assessor
2827     contained on the prior year's assessment roll.
2828          (10) "County-assessed commercial vehicle" means:
2829          (a) any commercial vehicle, trailer, or semitrailer that is not apportioned under Section
2830     41-1a-301 and is not operated interstate to transport the vehicle owner's goods or property in
2831     furtherance of the owner's commercial enterprise;
2832          (b) any passenger vehicle owned by a business and used by its employees for
2833     transportation as a company car or vanpool vehicle; and
2834          (c) vehicles that are:
2835          (i) especially constructed for towing or wrecking, and that are not otherwise used to
2836     transport goods, merchandise, or people for compensation;
2837          (ii) used or licensed as taxicabs or limousines;
2838          (iii) used as rental passenger cars, travel trailers, or motor homes;
2839          (iv) used or licensed in this state for use as ambulances or hearses;
2840          (v) especially designed and used for garbage and rubbish collection; or
2841          (vi) used exclusively to transport students or their instructors to or from any private,
2842     public, or religious school or school activities.
2843          (11) "Eligible judgment" means a final and unappealable judgment or order under
2844     Section 59-2-1330:
2845          (a) that became a final and unappealable judgment or order no more than 14 months
2846     before the day on which the notice described in Section 59-2-919.1 is required to be provided;

2847     and
2848          (b) for which a taxing entity's share of the final and unappealable judgment or order is
2849     greater than or equal to the lesser of:
2850          (i) $5,000; or
2851          (ii) 2.5% of the total ad valorem property taxes collected by the taxing entity in the
2852     previous fiscal year.
2853          (12) (a) "Escaped property" means any property, whether personal, land, or any
2854     improvements to the property, that is subject to taxation and is:
2855          (i) inadvertently omitted from the tax rolls, assigned to the incorrect parcel, or assessed
2856     to the wrong taxpayer by the assessing authority;
2857          (ii) undervalued or omitted from the tax rolls because of the failure of the taxpayer to
2858     comply with the reporting requirements of this chapter; or
2859          (iii) undervalued because of errors made by the assessing authority based upon
2860     incomplete or erroneous information furnished by the taxpayer.
2861          (b) "Escaped property" does not include property that is undervalued because of the use
2862     of a different valuation methodology or because of a different application of the same valuation
2863     methodology.
2864          (13) (a) "Fair market value" means the amount at which property would change hands
2865     between a willing buyer and a willing seller, neither being under any compulsion to buy or sell
2866     and both having reasonable knowledge of the relevant facts.
2867          (b) For purposes of taxation, "fair market value" shall be determined using the current
2868     zoning laws applicable to the property in question, except in cases where there is a reasonable
2869     probability of a change in the zoning laws affecting that property in the tax year in question and
2870     the change would have an appreciable influence upon the value.
2871          (14) "Geothermal fluid" means water in any form at temperatures greater than 120
2872     degrees centigrade naturally present in a geothermal system.
2873          (15) "Geothermal resource" means:
2874          (a) the natural heat of the earth at temperatures greater than 120 degrees centigrade;
2875     and
2876          (b) the energy, in whatever form, including pressure, present in, resulting from, created
2877     by, or which may be extracted from that natural heat, directly or through a material medium.

2878          (16) (a) "Goodwill" means:
2879          (i) acquired goodwill that is reported as goodwill on the books and records that a
2880     taxpayer maintains for financial reporting purposes; or
2881          (ii) the ability of a business to:
2882          (A) generate income that exceeds a normal rate of return on assets and that results from
2883     a factor described in Subsection (16)(b); or
2884          (B) obtain an economic or competitive advantage resulting from a factor described in
2885     Subsection (16)(b).
2886          (b) The following factors apply to Subsection (16)(a)(ii):
2887          (i) superior management skills;
2888          (ii) reputation;
2889          (iii) customer relationships;
2890          (iv) patronage; or
2891          (v) a factor similar to Subsections (16)(b)(i) through (iv).
2892          (c) "Goodwill" does not include:
2893          (i) the intangible property described in Subsection (19)(a) or (b);
2894          (ii) locational attributes of real property, including:
2895          (A) zoning;
2896          (B) location;
2897          (C) view;
2898          (D) a geographic feature;
2899          (E) an easement;
2900          (F) a covenant;
2901          (G) proximity to raw materials;
2902          (H) the condition of surrounding property; or
2903          (I) proximity to markets;
2904          (iii) value attributable to the identification of an improvement to real property,
2905     including:
2906          (A) reputation of the designer, builder, or architect of the improvement;
2907          (B) a name given to, or associated with, the improvement; or
2908          (C) the historic significance of an improvement; or

2909          (iv) the enhancement or assemblage value specifically attributable to the interrelation
2910     of the existing tangible property in place working together as a unit.
2911          (17) "Governing body" means:
2912          (a) for a county, city, or town, the legislative body of the county, city, or town;
2913          (b) for a special district under Title 17B, Limited Purpose Local Government Entities -
2914     Special Districts, the special district's board of trustees;
2915          (c) for a school district, the local board of education;
2916          (d) for a special service district under Title 17D, Chapter 1, Special Service District
2917     Act:
2918          (i) the legislative body of the county or municipality that created the special service
2919     district, to the extent that the county or municipal legislative body has not delegated authority
2920     to an administrative control board established under Section 17D-1-301; or
2921          (ii) the administrative control board, to the extent that the county or municipal
2922     legislative body has delegated authority to an administrative control board established under
2923     Section 17D-1-301; or
2924          (e) for a public infrastructure district under Title 17D, Chapter 4, Public Infrastructure
2925     District Act, the public infrastructure district's board of trustees.
2926          (18) (a) Except as provided in Subsection (18)(c), "improvement" means a building,
2927     structure, fixture, fence, or other item that is permanently attached to land, regardless of
2928     whether the title has been acquired to the land, if:
2929          (i) (A) attachment to land is essential to the operation or use of the item; and
2930          (B) the manner of attachment to land suggests that the item will remain attached to the
2931     land in the same place over the useful life of the item; or
2932          (ii) removal of the item would:
2933          (A) cause substantial damage to the item; or
2934          (B) require substantial alteration or repair of a structure to which the item is attached.
2935          (b) "Improvement" includes:
2936          (i) an accessory to an item described in Subsection (18)(a) if the accessory is:
2937          (A) essential to the operation of the item described in Subsection (18)(a); and
2938          (B) installed solely to serve the operation of the item described in Subsection (18)(a);
2939     and

2940          (ii) an item described in Subsection (18)(a) that is temporarily detached from the land
2941     for repairs and remains located on the land.
2942          (c) "Improvement" does not include:
2943          (i) an item considered to be personal property pursuant to rules made in accordance
2944     with Section 59-2-107;
2945          (ii) a moveable item that is attached to land for stability only or for an obvious
2946     temporary purpose;
2947          (iii) (A) manufacturing equipment and machinery; or
2948          (B) essential accessories to manufacturing equipment and machinery;
2949          (iv) an item attached to the land in a manner that facilitates removal without substantial
2950     damage to the land or the item; or
2951          (v) a transportable factory-built housing unit as defined in Section 59-2-1502 if that
2952     transportable factory-built housing unit is considered to be personal property under Section
2953     59-2-1503.
2954          (19) "Intangible property" means:
2955          (a) property that is capable of private ownership separate from tangible property,
2956     including:
2957          (i) money;
2958          (ii) credits;
2959          (iii) bonds;
2960          (iv) stocks;
2961          (v) representative property;
2962          (vi) franchises;
2963          (vii) licenses;
2964          (viii) trade names;
2965          (ix) copyrights; and
2966          (x) patents;
2967          (b) a low-income housing tax credit;
2968          (c) goodwill; or
2969          (d) a clean or renewable energy tax credit or incentive, including:
2970          (i) a federal renewable energy production tax credit under Section 45, Internal Revenue

2971     Code;
2972          (ii) a federal energy credit for qualified renewable electricity production facilities under
2973     Section 48, Internal Revenue Code;
2974          (iii) a federal grant for a renewable energy property under American Recovery and
2975     Reinvestment Act of 2009, Pub. L. No. 111-5, Section 1603; and
2976          (iv) a tax credit under Subsection 59-7-614(5).
2977          (20) "Livestock" means:
2978          (a) a domestic animal;
2979          (b) a fish;
2980          (c) a fur-bearing animal;
2981          (d) a honeybee; or
2982          (e) poultry.
2983          (21) "Low-income housing tax credit" means:
2984          (a) a federal low-income housing tax credit under Section 42, Internal Revenue Code;
2985     or
2986          (b) a low-income housing tax credit under Section 59-7-607 or Section 59-10-1010.
2987          (22) "Metalliferous minerals" includes gold, silver, copper, lead, zinc, and uranium.
2988          (23) "Mine" means a natural deposit of either metalliferous or nonmetalliferous
2989     valuable mineral.
2990          (24) "Mining" means the process of producing, extracting, leaching, evaporating, or
2991     otherwise removing a mineral from a mine.
2992          (25) (a) "Mobile flight equipment" means tangible personal property that is owned or
2993     operated by an air charter service, air contract service, or airline and:
2994          (i) is capable of flight or is attached to an aircraft that is capable of flight; or
2995          (ii) is contained in an aircraft that is capable of flight if the tangible personal property
2996     is intended to be used:
2997          (A) during multiple flights;
2998          (B) during a takeoff, flight, or landing; and
2999          (C) as a service provided by an air charter service, air contract service, or airline.
3000          (b) (i) "Mobile flight equipment" does not include a spare part other than a spare
3001     engine that is rotated at regular intervals with an engine that is attached to the aircraft.

3002          (ii) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3003     commission may make rules defining the term "regular intervals."
3004          (26) "Nonmetalliferous minerals" includes, but is not limited to, oil, gas, coal, salts,
3005     sand, rock, gravel, and all carboniferous materials.
3006          (27) "Part-year residential property" means property that is not residential property on
3007     January 1 of a calendar year but becomes residential property after January 1 of the calendar
3008     year.
3009          (28) "Personal property" includes:
3010          (a) every class of property as defined in Subsection (29) that is the subject of
3011     ownership and is not real estate or an improvement;
3012          (b) any pipe laid in or affixed to land whether or not the ownership of the pipe is
3013     separate from the ownership of the underlying land, even if the pipe meets the definition of an
3014     improvement;
3015          (c) bridges and ferries;
3016          (d) livestock; and
3017          (e) outdoor advertising structures as defined in Section 72-7-502.
3018          (29) (a) "Property" means property that is subject to assessment and taxation according
3019     to its value.
3020          (b) "Property" does not include intangible property as defined in this section.
3021          (30) (a) "Public utility" means:
3022          (i) the operating property of a railroad, gas corporation, oil or gas transportation or
3023     pipeline company, coal slurry pipeline company, electrical corporation, sewerage corporation,
3024     or heat corporation where the company performs the service for, or delivers the commodity to,
3025     the public generally or companies serving the public generally, or in the case of a gas
3026     corporation or an electrical corporation, where the gas or electricity is sold or furnished to any
3027     member or consumers within the state for domestic, commercial, or industrial use; and
3028          (ii) the operating property of any entity or person defined under Section 54-2-1 except
3029     water corporations.
3030          (b) "Public utility" does not include the operating property of a telecommunications
3031     service provider.
3032          (31) (a) Subject to Subsection (31)(b), "qualifying exempt primary residential rental

3033     personal property" means household furnishings, furniture, and equipment that:
3034          (i) are used exclusively within a dwelling unit that is the primary residence of a tenant;
3035          (ii) are owned by the owner of the dwelling unit that is the primary residence of a
3036     tenant; and
3037          (iii) after applying the residential exemption described in Section 59-2-103, are exempt
3038     from taxation under this chapter in accordance with Subsection 59-2-1115(2).
3039          (b) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3040     commission may by rule define the term "dwelling unit" for purposes of this Subsection (31)
3041     and Subsection (34).
3042          (32) "Real estate" or "real property" includes:
3043          (a) the possession of, claim to, ownership of, or right to the possession of land;
3044          (b) all mines, minerals, and quarries in and under the land, all timber belonging to
3045     individuals or corporations growing or being on the lands of this state or the United States, and
3046     all rights and privileges appertaining to these; and
3047          (c) improvements.
3048          (33) (a) "Relationship with an owner of the property's land surface rights" means a
3049     relationship described in Subsection 267(b), Internal Revenue Code, except that the term 25%
3050     shall be substituted for the term 50% in Subsection 267(b), Internal Revenue Code.
3051          (b) For purposes of determining if a relationship described in Subsection 267(b),
3052     Internal Revenue Code, exists, the ownership of stock shall be determined using the ownership
3053     rules in Subsection 267(c), Internal Revenue Code.
3054          (34) (a) "Residential property," for purposes of the reductions and adjustments under
3055     this chapter, means any property used for residential purposes as a primary residence.
3056          (b) "Residential property" includes:
3057          (i) except as provided in Subsection (34)(b)(ii), includes household furnishings,
3058     furniture, and equipment if the household furnishings, furniture, and equipment are:
3059          (A) used exclusively within a dwelling unit that is the primary residence of a tenant;
3060     and
3061          (B) owned by the owner of the dwelling unit that is the primary residence of a tenant;
3062     and
3063          (ii) if the county assessor determines that the property will be used for residential

3064     purposes as a primary residence:
3065          (A) property under construction; or
3066          (B) unoccupied property.
3067          (c) "Residential property" does not include property used for transient residential use.
3068          (d) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3069     commission may by rule define the term "dwelling unit" for purposes of Subsection (31) and
3070     this Subsection (34).
3071          (35) "Split estate mineral rights owner" means a person that:
3072          (a) has a legal right to extract a mineral from property;
3073          (b) does not hold more than a 25% interest in:
3074          (i) the land surface rights of the property where the wellhead is located; or
3075          (ii) an entity with an ownership interest in the land surface rights of the property where
3076     the wellhead is located;
3077          (c) is not an entity in which the owner of the land surface rights of the property where
3078     the wellhead is located holds more than a 25% interest; and
3079          (d) does not have a relationship with an owner of the land surface rights of the property
3080     where the wellhead is located.
3081          (36) (a) "State-assessed commercial vehicle" means:
3082          (i) any commercial vehicle, trailer, or semitrailer that operates interstate or intrastate to
3083     transport passengers, freight, merchandise, or other property for hire; or
3084          (ii) any commercial vehicle, trailer, or semitrailer that operates interstate and transports
3085     the vehicle owner's goods or property in furtherance of the owner's commercial enterprise.
3086          (b) "State-assessed commercial vehicle" does not include vehicles used for hire that are
3087     specified in Subsection (10)(c) as county-assessed commercial vehicles.
3088          (37) "Subdivided lot" means a lot, parcel, or other division of land, that is a division of
3089     a base parcel.
3090          (38) "Tax area" means a geographic area created by the overlapping boundaries of one
3091     or more taxing entities.
3092          (39) "Taxable value" means fair market value less any applicable reduction allowed for
3093     residential property under Section 59-2-103.
3094          (40) "Taxing entity" means any county, city, town, school district, special taxing

3095     district, special district under Title 17B, Limited Purpose Local Government Entities - Special
3096     Districts, or other political subdivision of the state with the authority to levy a tax on property.
3097          (41) (a) "Tax roll" means a permanent record of the taxes charged on property, as
3098     extended on the assessment roll, and may be maintained on the same record or records as the
3099     assessment roll or may be maintained on a separate record properly indexed to the assessment
3100     roll.
3101          (b) "Tax roll" includes tax books, tax lists, and other similar materials.
3102          (42) "Telecommunications service provider" means the same as that term is defined in
3103     Section 59-12-102.
3104          Section 41. Section 59-7-614 is amended to read:
3105          59-7-614. Clean energy systems tax credits -- Definitions -- Certification --
3106     Rulemaking authority.
3107          (1) As used in this section:
3108          (a) (i) "Active solar system" means a system of equipment that is capable of:
3109          (A) collecting and converting incident solar radiation into thermal, mechanical, or
3110     electrical energy; and
3111          (B) transferring a form of energy described in Subsection (1)(a)(i)(A) by a separate
3112     apparatus to storage or to the point of use.
3113          (ii) "Active solar system" includes water heating, space heating or cooling, and
3114     electrical or mechanical energy generation.
3115          (b) "Biomass system" means a system of apparatus and equipment for use in:
3116          (i) converting material into biomass energy, as defined in Section 59-12-102; and
3117          (ii) transporting the biomass energy by separate apparatus to the point of use or storage.
3118          (c) "Clean energy source" means the same as that term is defined in Section 54-17-601.
3119          [(c)] (d) "Commercial energy system" means a system that is:
3120          (i) (A) an active solar system;
3121          (B) a biomass system;
3122          (C) a direct use geothermal system;
3123          (D) a geothermal electricity system;
3124          (E) a geothermal heat pump system;
3125          (F) a hydroenergy system;

3126          (G) a passive solar system; or
3127          (H) a wind system;
3128          (ii) located in the state; and
3129          (iii) used:
3130          (A) to supply energy to a commercial unit; or
3131          (B) as a commercial enterprise.
3132          [(d)] (e) "Commercial enterprise" means an entity, the purpose of which is to produce:
3133          (i) electrical, mechanical, or thermal energy for sale from a commercial energy system;
3134     or
3135          (ii) hydrogen for sale from a hydrogen production system.
3136          [(e)] (f) (i) "Commercial unit" means a building or structure that an entity uses to
3137     transact business.
3138          (ii) Notwithstanding Subsection [(1)(e)(i)] (1)(f)(i):
3139          (A) with respect to an active solar system used for agricultural water pumping or a
3140     wind system, each individual energy generating device is considered to be a commercial unit;
3141     or
3142          (B) if an energy system is the building or structure that an entity uses to transact
3143     business, a commercial unit is the complete energy system itself.
3144          [(f)] (g) "Direct use geothermal system" means a system of apparatus and equipment
3145     that enables the direct use of geothermal energy to meet energy needs, including heating a
3146     building, an industrial process, and aquaculture.
3147          [(g)] (h) "Geothermal electricity" means energy that is:
3148          (i) contained in heat that continuously flows outward from the earth; and
3149          (ii) used as a sole source of energy to produce electricity.
3150          [(h)] (i) "Geothermal energy" means energy generated by heat that is contained in the
3151     earth.
3152          [(i)] (j) "Geothermal heat pump system" means a system of apparatus and equipment
3153     that:
3154          (i) enables the use of thermal properties contained in the earth at temperatures well
3155     below 100 degrees Fahrenheit; and
3156          (ii) helps meet heating and cooling needs of a structure.

3157          [(j)] (k) "Hydroenergy system" means a system of apparatus and equipment that is
3158     capable of:
3159          (i) intercepting and converting kinetic water energy into electrical or mechanical
3160     energy; and
3161          (ii) transferring this form of energy by separate apparatus to the point of use or storage.
3162          [(k)] (l) "Hydrogen production system" means a system of apparatus and equipment,
3163     located in this state, that uses:
3164          (i) electricity from a [renewable] clean energy source to create hydrogen gas from
3165     water, regardless of whether the [renewable] clean energy source is at a separate facility or the
3166     same facility as the system of apparatus and equipment; or
3167          (ii) uses renewable natural gas to produce hydrogen gas.
3168          [(l)] (m) "Office" means the Office of Energy Development created in Section
3169     79-6-401.
3170          [(m)] (n) (i) "Passive solar system" means a direct thermal system that utilizes the
3171     structure of a building and the structure's operable components to provide for collection,
3172     storage, and distribution of heating or cooling during the appropriate times of the year by
3173     utilizing the climate resources available at the site.
3174          (ii) "Passive solar system" includes those portions and components of a building that
3175     are expressly designed and required for the collection, storage, and distribution of solar energy.
3176          [(n)] (o) "Photovoltaic system" means an active solar system that generates electricity
3177     from sunlight.
3178          [(o)] (p) (i) "Principal recovery portion" means the portion of a lease payment that
3179     constitutes the cost a person incurs in acquiring a commercial energy system.
3180          (ii) "Principal recovery portion" does not include:
3181          (A) an interest charge; or
3182          (B) a maintenance expense.
3183          [(p) "Renewable energy source" means the same as that term is defined in Section
3184     54-17-601.]
3185          (q) "Residential energy system" means the following used to supply energy to or for a
3186     residential unit:
3187          (i) an active solar system;

3188          (ii) a biomass system;
3189          (iii) a direct use geothermal system;
3190          (iv) a geothermal heat pump system;
3191          (v) a hydroenergy system;
3192          (vi) a passive solar system; or
3193          (vii) a wind system.
3194          (r) (i) "Residential unit" means a house, condominium, apartment, or similar dwelling
3195     unit that:
3196          (A) is located in the state; and
3197          (B) serves as a dwelling for a person, group of persons, or a family.
3198          (ii) "Residential unit" does not include property subject to a fee under:
3199          (A) Section 59-2-405;
3200          (B) Section 59-2-405.1;
3201          (C) Section 59-2-405.2;
3202          (D) Section 59-2-405.3; or
3203          (E) Section 72-10-110.5.
3204          (s) "Wind system" means a system of apparatus and equipment that is capable of:
3205          (i) intercepting and converting wind energy into mechanical or electrical energy; and
3206          (ii) transferring these forms of energy by a separate apparatus to the point of use, sale,
3207     or storage.
3208          (2) A taxpayer may claim an energy system tax credit as provided in this section
3209     against a tax due under this chapter for a taxable year.
3210          (3) (a) Subject to the other provisions of this Subsection (3), a taxpayer may claim a
3211     nonrefundable tax credit under this Subsection (3) with respect to a residential unit the taxpayer
3212     owns or uses if:
3213          (i) the taxpayer:
3214          (A) purchases and completes a residential energy system to supply all or part of the
3215     energy required for the residential unit; or
3216          (B) participates in the financing of a residential energy system to supply all or part of
3217     the energy required for the residential unit; and
3218          (ii) the taxpayer obtains a written certification from the office in accordance with

3219     Subsection (8).
3220          (b) (i) Subject to Subsections (3)(b)(ii) through (iv) and, as applicable, Subsection
3221     (3)(c) or (d), the tax credit is equal to 25% of the reasonable costs of each residential energy
3222     system installed with respect to each residential unit the taxpayer owns or uses.
3223          (ii) A tax credit under this Subsection (3) may include installation costs.
3224          (iii) A taxpayer may claim a tax credit under this Subsection (3) for the taxable year in
3225     which the residential energy system is completed and placed in service.
3226          (iv) If the amount of a tax credit under this Subsection (3) exceeds a taxpayer's tax
3227     liability under this chapter for a taxable year, the taxpayer may carry forward the amount of the
3228     tax credit exceeding the liability for a period that does not exceed the next four taxable years.
3229          (c) The total amount of tax credit a taxpayer may claim under this Subsection (3) for a
3230     residential energy system, other than a photovoltaic system, may not exceed $2,000 per
3231     residential unit.
3232          (d) The total amount of tax credit a taxpayer may claim under this Subsection (3) for a
3233     photovoltaic system may not exceed:
3234          (i) for a system installed on or after January 1, 2018, but on or before December 31,
3235     2020, $1,600;
3236          (ii) for a system installed on or after January 1, 2021, but on or before December 31,
3237     2021, $1,200;
3238          (iii) for a system installed on or after January 1, 2022, but on or before December 31,
3239     2022, $800;
3240          (iv) for a system installed on or after January 1, 2023, but on or before December 31,
3241     2023, $400; and
3242          (v) for a system installed on or after January 1, 2024, $0.
3243          (e) If a taxpayer sells a residential unit to another person before the taxpayer claims the
3244     tax credit under this Subsection (3):
3245          (i) the taxpayer may assign the tax credit to the other person; and
3246          (ii) (A) if the other person files a return under this chapter, the other person may claim
3247     the tax credit under this section as if the other person had met the requirements of this section
3248     to claim the tax credit; or
3249          (B) if the other person files a return under Chapter 10, Individual Income Tax Act, the

3250     other person may claim the tax credit under Section 59-10-1014 as if the other person had met
3251     the requirements of Section 59-10-1014 to claim the tax credit.
3252          (4) (a) Subject to the other provisions of this Subsection (4), a taxpayer may claim a
3253     refundable tax credit under this Subsection (4) with respect to a commercial energy system if:
3254          (i) the commercial energy system does not use:
3255          (A) wind, geothermal electricity, solar, or biomass equipment capable of producing a
3256     total of 660 or more kilowatts of electricity; or
3257          (B) solar equipment capable of producing 2,000 or more kilowatts of electricity;
3258          (ii) the taxpayer purchases or participates in the financing of the commercial energy
3259     system;
3260          (iii) (A) the commercial energy system supplies all or part of the energy required by
3261     commercial units owned or used by the taxpayer; or
3262          (B) the taxpayer sells all or part of the energy produced by the commercial energy
3263     system as a commercial enterprise;
3264          (iv) the taxpayer has not claimed and will not claim a tax credit under Subsection (7)
3265     for hydrogen production using electricity for which the taxpayer claims a tax credit under this
3266     Subsection (4); and
3267          (v) the taxpayer obtains a written certification from the office in accordance with
3268     Subsection (8).
3269          (b) (i) Subject to Subsections (4)(b)(ii) through (iv), the tax credit is equal to 10% of
3270     the reasonable costs of the commercial energy system.
3271          (ii) A tax credit under this Subsection (4) may include installation costs.
3272          (iii) A taxpayer is eligible to claim a tax credit under this Subsection (4) for the taxable
3273     year in which the commercial energy system is completed and placed in service.
3274          (iv) The total amount of tax credit a taxpayer may claim under this Subsection (4) may
3275     not exceed $50,000 per commercial unit.
3276          (c) (i) Subject to Subsections (4)(c)(ii) and (iii), a taxpayer that is a lessee of a
3277     commercial energy system installed on a commercial unit may claim a tax credit under this
3278     Subsection (4) if the taxpayer confirms that the lessor irrevocably elects not to claim the tax
3279     credit.
3280          (ii) A taxpayer described in Subsection (4)(c)(i) may claim as a tax credit under this

3281     Subsection (4) only the principal recovery portion of the lease payments.
3282          (iii) A taxpayer described in Subsection (4)(c)(i) may claim a tax credit under this
3283     Subsection (4) for a period that does not exceed seven taxable years after the day on which the
3284     lease begins, as stated in the lease agreement.
3285          (5) (a) Subject to the other provisions of this Subsection (5), a taxpayer may claim a
3286     refundable tax credit under this Subsection (5) with respect to a commercial energy system if:
3287          (i) the commercial energy system uses wind, geothermal electricity, or biomass
3288     equipment capable of producing a total of 660 or more kilowatts of electricity;
3289          (ii) (A) the commercial energy system supplies all or part of the energy required by
3290     commercial units owned or used by the taxpayer; or
3291          (B) the taxpayer sells all or part of the energy produced by the commercial energy
3292     system as a commercial enterprise;
3293          (iii) the taxpayer has not claimed and will not claim a tax credit under Subsection (7)
3294     for hydrogen production using electricity for which the taxpayer claims a tax credit under this
3295     Subsection (5); and
3296          (iv) the taxpayer obtains a written certification from the office in accordance with
3297     Subsection (8).
3298          (b) (i) Subject to Subsection (5)(b)(ii), a tax credit under this Subsection (5) is equal to
3299     the product of:
3300          (A) 0.35 cents; and
3301          (B) the kilowatt hours of electricity produced and used or sold during the taxable year.
3302          (ii) A taxpayer is eligible to claim a tax credit under this Subsection (5) for production
3303     occurring during a period of 48 months beginning with the month in which the commercial
3304     energy system is placed in commercial service.
3305          (c) A taxpayer that is a lessee of a commercial energy system installed on a commercial
3306     unit may claim a tax credit under this Subsection (5) if the taxpayer confirms that the lessor
3307     irrevocably elects not to claim the tax credit.
3308          (6) (a) Subject to the other provisions of this Subsection (6), a taxpayer may claim a
3309     refundable tax credit as provided in this Subsection (6) if:
3310          (i) the taxpayer owns a commercial energy system that uses solar equipment capable of
3311     producing a total of 660 or more kilowatts of electricity;

3312          (ii) (A) the commercial energy system supplies all or part of the energy required by
3313     commercial units owned or used by the taxpayer; or
3314          (B) the taxpayer sells all or part of the energy produced by the commercial energy
3315     system as a commercial enterprise;
3316          (iii) the taxpayer does not claim a tax credit under Subsection (4) and has not claimed
3317     and will not claim a tax credit under Subsection (7) for hydrogen production using electricity
3318     for which a taxpayer claims a tax credit under this Subsection (6); and
3319          (iv) the taxpayer obtains a written certification from the office in accordance with
3320     Subsection (8).
3321          (b) (i) Subject to Subsection (6)(b)(ii), a tax credit under this Subsection (6) is equal to
3322     the product of:
3323          (A) 0.35 cents; and
3324          (B) the kilowatt hours of electricity produced and used or sold during the taxable year.
3325          (ii) A taxpayer is eligible to claim a tax credit under this Subsection (6) for production
3326     occurring during a period of 48 months beginning with the month in which the commercial
3327     energy system is placed in commercial service.
3328          (c) A taxpayer that is a lessee of a commercial energy system installed on a commercial
3329     unit may claim a tax credit under this Subsection (6) if the taxpayer confirms that the lessor
3330     irrevocably elects not to claim the tax credit.
3331          (7) (a) A taxpayer may claim a refundable tax credit as provided in this Subsection (7)
3332     if:
3333          (i) the taxpayer owns a hydrogen production system;
3334          (ii) the hydrogen production system is completed and placed in service on or after
3335     January 1, 2022;
3336          (iii) the taxpayer sells as a commercial enterprise, or supplies for the taxpayer's own
3337     use in commercial units, the hydrogen produced from the hydrogen production system;
3338          (iv) the taxpayer has not claimed and will not claim a tax credit under Subsection (4),
3339     (5), or (6) or Section 59-7-626 for electricity or hydrogen used to meet the requirements of this
3340     Subsection (7); and
3341          (v) the taxpayer obtains a written certification from the office in accordance with
3342     Subsection (8).

3343          (b) (i) Subject to Subsections (7)(b)(ii) and (iii), a tax credit under this Subsection (7)
3344     is equal to the product of:
3345          (A) $0.12; and
3346          (B) the number of kilograms of hydrogen produced during the taxable year.
3347          (ii) A taxpayer may not receive a tax credit under this Subsection (7) for more than
3348     5,600 metric tons of hydrogen per taxable year.
3349          (iii) A taxpayer is eligible to claim a tax credit under this Subsection (7) for production
3350     occurring during a period of 48 months beginning with the month in which the hydrogen
3351     production system is placed in commercial service.
3352          (8) (a) Before a taxpayer may claim a tax credit under this section, the taxpayer shall
3353     obtain a written certification from the office.
3354          (b) The office shall issue a taxpayer a written certification if the office determines that:
3355          (i) the taxpayer meets the requirements of this section to receive a tax credit; and
3356          (ii) the residential energy system, the commercial energy system, or the hydrogen
3357     production system with respect to which the taxpayer seeks to claim a tax credit:
3358          (A) has been completely installed;
3359          (B) is a viable system for saving or producing energy from [renewable] clean
3360     resources; and
3361          (C) is safe, reliable, efficient, and technically feasible to ensure that the residential
3362     energy system, the commercial energy system, or the hydrogen production system uses the
3363     state's [renewable] clean and nonrenewable energy resources in an appropriate and economic
3364     manner.
3365          (c) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3366     office may make rules:
3367          (i) for determining whether a residential energy system, a commercial energy system,
3368     or a hydrogen production system meets the requirements of Subsection (8)(b)(ii); and
3369          (ii) for purposes of a tax credit under Subsection (3) or (4), establishing the reasonable
3370     costs of a residential energy system or a commercial energy system, as an amount per unit of
3371     energy production.
3372          (d) A taxpayer that obtains a written certification from the office shall retain the
3373     certification for the same time period a person is required to keep books and records under

3374     Section 59-1-1406.
3375          (e) The office shall submit to the commission an electronic list that includes:
3376          (i) the name and identifying information of each taxpayer to which the office issues a
3377     written certification; and
3378          (ii) for each taxpayer:
3379          (A) the amount of the tax credit listed on the written certification; and
3380          (B) the date the [renewable] clean energy system was installed.
3381          (9) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3382     commission may make rules to address the certification of a tax credit under this section.
3383          (10) A tax credit under this section is in addition to any tax credits provided under the
3384     laws or rules and regulations of the United States.
3385          (11) A taxpayer may not claim or carry forward a tax credit described in this section in
3386     a taxable year during which the taxpayer claims or carries forward a tax credit under Section
3387     59-7-614.7.
3388          Section 42. Section 59-10-1014 is amended to read:
3389          59-10-1014. Nonrefundable clean energy systems tax credits -- Definitions --
3390     Certification -- Rulemaking authority.
3391          (1) As used in this section:
3392          (a) (i) "Active solar system" means a system of equipment that is capable of:
3393          (A) collecting and converting incident solar radiation into thermal, mechanical, or
3394     electrical energy; and
3395          (B) transferring a form of energy described in Subsection (1)(a)(i)(A) by a separate
3396     apparatus to storage or to the point of use.
3397          (ii) "Active solar system" includes water heating, space heating or cooling, and
3398     electrical or mechanical energy generation.
3399          (b) "Biomass system" means a system of apparatus and equipment for use in:
3400          (i) converting material into biomass energy, as defined in Section 59-12-102; and
3401          (ii) transporting the biomass energy by separate apparatus to the point of use or storage.
3402          (c) "Direct use geothermal system" means a system of apparatus and equipment that
3403     enables the direct use of geothermal energy to meet energy needs, including heating a building,
3404     an industrial process, and aquaculture.

3405          (d) "Geothermal electricity" means energy that is:
3406          (i) contained in heat that continuously flows outward from the earth; and
3407          (ii) used as a sole source of energy to produce electricity.
3408          (e) "Geothermal energy" means energy generated by heat that is contained in the earth.
3409          (f) "Geothermal heat pump system" means a system of apparatus and equipment that:
3410          (i) enables the use of thermal properties contained in the earth at temperatures well
3411     below 100 degrees Fahrenheit; and
3412          (ii) helps meet heating and cooling needs of a structure.
3413          (g) "Hydroenergy system" means a system of apparatus and equipment that is capable
3414     of:
3415          (i) intercepting and converting kinetic water energy into electrical or mechanical
3416     energy; and
3417          (ii) transferring this form of energy by separate apparatus to the point of use or storage.
3418          (h) "Office" means the Office of Energy Development created in Section 79-6-401.
3419          (i) (i) "Passive solar system" means a direct thermal system that utilizes the structure of
3420     a building and its operable components to provide for collection, storage, and distribution of
3421     heating or cooling during the appropriate times of the year by utilizing the climate resources
3422     available at the site.
3423          (ii) "Passive solar system" includes those portions and components of a building that
3424     are expressly designed and required for the collection, storage, and distribution of solar energy.
3425          (j) "Photovoltaic system" means an active solar system that generates electricity from
3426     sunlight.
3427          (k) (i) "Principal recovery portion" means the portion of a lease payment that
3428     constitutes the cost a person incurs in acquiring a residential energy system.
3429          (ii) "Principal recovery portion" does not include:
3430          (A) an interest charge; or
3431          (B) a maintenance expense.
3432          (l) "Residential energy system" means the following used to supply energy to or for a
3433     residential unit:
3434          (i) an active solar system;
3435          (ii) a biomass system;

3436          (iii) a direct use geothermal system;
3437          (iv) a geothermal heat pump system;
3438          (v) a hydroenergy system;
3439          (vi) a passive solar system; or
3440          (vii) a wind system.
3441          (m) (i) "Residential unit" means a house, condominium, apartment, or similar dwelling
3442     unit that:
3443          (A) is located in the state; and
3444          (B) serves as a dwelling for a person, group of persons, or a family.
3445          (ii) "Residential unit" does not include property subject to a fee under:
3446          (A) Section 59-2-405;
3447          (B) Section 59-2-405.1;
3448          (C) Section 59-2-405.2;
3449          (D) Section 59-2-405.3; or
3450          (E) Section 72-10-110.5.
3451          (n) "Wind system" means a system of apparatus and equipment that is capable of:
3452          (i) intercepting and converting wind energy into mechanical or electrical energy; and
3453          (ii) transferring these forms of energy by a separate apparatus to the point of use or
3454     storage.
3455          (2) A claimant, estate, or trust may claim an energy system tax credit as provided in
3456     this section against a tax due under this chapter for a taxable year.
3457          (3) For a taxable year beginning on or after January 1, 2007, a claimant, estate, or trust
3458     may claim a nonrefundable tax credit under this section with respect to a residential unit the
3459     claimant, estate, or trust owns or uses if:
3460          (a) the claimant, estate, or trust:
3461          (i) purchases and completes a residential energy system to supply all or part of the
3462     energy required for the residential unit; or
3463          (ii) participates in the financing of a residential energy system to supply all or part of
3464     the energy required for the residential unit;
3465          (b) the residential energy system is installed on or after January 1, 2007; and
3466          (c) the claimant, estate, or trust obtains a written certification from the office in

3467     accordance with Subsection (5).
3468          (4) (a) For a residential energy system, other than a photovoltaic system, the tax credit
3469     described in this section is equal to the lesser of:
3470          (i) 25% of the reasonable costs, including installation costs, of each residential energy
3471     system installed with respect to each residential unit the claimant, estate, or trust owns or uses;
3472     and
3473          (ii) $2,000.
3474          (b) Subject to Subsection (5)(d), for a residential energy system that is a photovoltaic
3475     system, the tax credit described in this section is equal to the lesser of:
3476          (i) 25% of the reasonable costs, including installation costs, of each system installed
3477     with respect to each residential unit the claimant, estate, or trust owns or uses; or
3478          (ii) (A) for a system installed on or after January 1, 2007, but on or before December
3479     31, 2017, $2,000;
3480          (B) for a system installed on or after January 1, 2018, but on or before December 31,
3481     2020, $1,600;
3482          (C) for a system installed on or after January 1, 2021, but on or before December 31,
3483     2021, $1,200;
3484          (D) for a system installed on or after January 1, 2022, but on or before December 31,
3485     2022, $800;
3486          (E) for a system installed on or after January 1, 2023, but on or before December 31,
3487     2023, $400; and
3488          (F) for a system installed on or after January 1, 2024, $0.
3489          (c) (i) The office shall determine the amount of the tax credit that a claimant, estate, or
3490     trust may claim and list that amount on the written certification that the office issues under
3491     Subsection (5).
3492          (ii) The claimant, estate, or trust may claim the tax credit in the amount listed on the
3493     written certification that the office issues under Subsection (5).
3494          (d) A claimant, estate, or trust may claim a tax credit under Subsection (3) for the
3495     taxable year in which the residential energy system is installed.
3496          (e) If the amount of a tax credit listed on the written certification exceeds a claimant's,
3497     estate's, or trust's tax liability under this chapter for a taxable year, the claimant, estate, or trust

3498     may carry forward the amount of the tax credit exceeding the liability for a period that does not
3499     exceed the next four taxable years.
3500          (f) A claimant, estate, or trust may claim a tax credit with respect to additional
3501     residential energy systems or parts of residential energy systems for a subsequent taxable year
3502     if the total amount of tax credit the claimant, estate, or trust claims does not exceed $2,000 per
3503     residential unit.
3504          (g) (i) Subject to Subsections (4)(g)(ii) and (iii), a claimant, estate, or trust that leases a
3505     residential energy system installed on a residential unit may claim a tax credit under Subsection
3506     (3) if the claimant, estate, or trust confirms that the lessor irrevocably elects not to claim the tax
3507     credit.
3508          (ii) A claimant, estate, or trust described in Subsection (4)(g)(i) that leases a residential
3509     energy system may claim as a tax credit under Subsection (3) only the principal recovery
3510     portion of the lease payments.
3511          (iii) A claimant, estate, or trust described in Subsection (4)(g)(i) that leases a
3512     residential energy system may claim a tax credit under Subsection (3) for a period that does not
3513     exceed seven taxable years after the date the lease begins, as stated in the lease agreement.
3514          (h) If a claimant, estate, or trust sells a residential unit to another person before the
3515     claimant, estate, or trust claims the tax credit under Subsection (3):
3516          (i) the claimant, estate, or trust may assign the tax credit to the other person; and
3517          (ii) (A) if the other person files a return under Chapter 7, Corporate Franchise and
3518     Income Taxes, the other person may claim the tax credit as if the other person had met the
3519     requirements of Section 59-7-614 to claim the tax credit; or
3520          (B) if the other person files a return under this chapter, the other person may claim the
3521     tax credit under this section as if the other person had met the requirements of this section to
3522     claim the tax credit.
3523          (5) (a) Before a claimant, estate, or trust may claim a tax credit under this section, the
3524     claimant, estate, or trust shall obtain a written certification from the office.
3525          (b) The office shall issue a claimant, estate, or trust a written certification if the office
3526     determines that:
3527          (i) the claimant, estate, or trust meets the requirements of this section to receive a tax
3528     credit; and

3529          (ii) the office determines that the residential energy system with respect to which the
3530     claimant, estate, or trust seeks to claim a tax credit:
3531          (A) has been completely installed;
3532          (B) is a viable system for saving or producing energy from [renewable] clean
3533     resources; and
3534          (C) is safe, reliable, efficient, and technically feasible to ensure that the residential
3535     energy system uses the state's renewable and nonrenewable energy resources in an appropriate
3536     and economic manner.
3537          (c) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3538     office may make rules:
3539          (i) for determining whether a residential energy system meets the requirements of
3540     Subsection (5)(b)(ii); and
3541          (ii) for purposes of determining the amount of a tax credit that a claimant, estate, or
3542     trust may receive under Subsection (4), establishing the reasonable costs of a residential energy
3543     system, as an amount per unit of energy production.
3544          (d) A claimant, estate, or trust that obtains a written certification from the office shall
3545     retain the certification for the same time period a person is required to keep books and records
3546     under Section 59-1-1406.
3547          (e) The office shall submit to the commission an electronic list that includes:
3548          (i) the name and identifying information of each claimant, estate, or trust to which the
3549     office issues a written certification; and
3550          (ii) for each claimant, estate, or trust:
3551          (A) the amount of the tax credit listed on the written certification; and
3552          (B) the date the [renewable] clean energy system was installed.
3553          (6) A tax credit under this section is in addition to any tax credits provided under the
3554     laws or rules and regulations of the United States.
3555          (7) A purchaser of one or more solar units that claims a tax credit under Section
3556     59-10-1024 for the purchase of the one or more solar units may not claim a tax credit under this
3557     section for that purchase.
3558          Section 43. Section 59-10-1106 is amended to read:
3559          59-10-1106. Refundable clean energy systems tax credits -- Definitions --

3560     Certification -- Rulemaking authority.
3561          (1) As used in this section:
3562          (a) "Active solar system" means the same as that term is defined in Section
3563     59-10-1014.
3564          (b) "Biomass system" means the same as that term is defined in Section 59-10-1014.
3565          (c) "Commercial energy system" means the same as that term is defined in Section
3566     59-7-614.
3567          (d) "Commercial enterprise" means the same as that term is defined in Section
3568     59-7-614.
3569          (e) "Commercial unit" means the same as that term is defined in Section 59-7-614.
3570          (f) "Direct use geothermal system" means the same as that term is defined in Section
3571     59-10-1014.
3572          (g) "Geothermal electricity" means the same as that term is defined in Section
3573     59-10-1014.
3574          (h) "Geothermal energy" means the same as that term is defined in Section 59-10-1014.
3575          (i) "Geothermal heat pump system" means the same as that term is defined in Section
3576     59-10-1014.
3577          (j) "Hydroenergy system" means the same as that term is defined in Section
3578     59-10-1014.
3579          (k) "Hydrogen production system" means the same as that term is defined in Section
3580     59-7-614.
3581          (l) "Office" means the Office of Energy Development created in Section 79-6-401.
3582          (m) "Passive solar system" means the same as that term is defined in Section
3583     59-10-1014.
3584          (n) "Principal recovery portion" means the same as that term is defined in Section
3585     59-10-1014.
3586          (o) "Wind system" means the same as that term is defined in Section 59-10-1014.
3587          (2) A claimant, estate, or trust may claim an energy system tax credit as provided in
3588     this section against a tax due under this chapter for a taxable year.
3589          (3) (a) Subject to the other provisions of this Subsection (3), a claimant, estate, or trust
3590     may claim a refundable tax credit under this Subsection (3) with respect to a commercial

3591     energy system if:
3592          (i) the commercial energy system does not use:
3593          (A) wind, geothermal electricity, solar, or biomass equipment capable of producing a
3594     total of 660 or more kilowatts of electricity; or
3595          (B) solar equipment capable of producing 2,000 or more kilowatts of electricity;
3596          (ii) the claimant, estate, or trust purchases or participates in the financing of the
3597     commercial energy system;
3598          (iii) (A) the commercial energy system supplies all or part of the energy required by
3599     commercial units owned or used by the claimant, estate, or trust; or
3600          (B) the claimant, estate, or trust sells all or part of the energy produced by the
3601     commercial energy system as a commercial enterprise;
3602          (iv) the claimant, estate, or trust has not claimed and will not claim a tax credit under
3603     Subsection (6) for hydrogen production using electricity for which the claimant, estate, or trust
3604     claims a tax credit under this Subsection (3); and
3605          (v) the claimant, estate, or trust obtains a written certification from the office in
3606     accordance with Subsection (7).
3607          (b) (i) Subject to Subsections (3)(b)(ii) through (iv), the tax credit is equal to 10% of
3608     the reasonable costs of the commercial energy system.
3609          (ii) A tax credit under this Subsection (3) may include installation costs.
3610          (iii) A claimant, estate, or trust is eligible to claim a tax credit under this Subsection (3)
3611     for the taxable year in which the commercial energy system is completed and placed in service.
3612          (iv) The total amount of tax credit a claimant, estate, or trust may claim under this
3613     Subsection (3) may not exceed $50,000 per commercial unit.
3614          (c) (i) Subject to Subsections (3)(c)(ii) and (iii), a claimant, estate, or trust that is a
3615     lessee of a commercial energy system installed on a commercial unit may claim a tax credit
3616     under this Subsection (3) if the claimant, estate, or trust confirms that the lessor irrevocably
3617     elects not to claim the tax credit.
3618          (ii) A claimant, estate, or trust described in Subsection (3)(c)(i) may claim as a tax
3619     credit under this Subsection (3) only the principal recovery portion of the lease payments.
3620          (iii) A claimant, estate, or trust described in Subsection (3)(c)(i) may claim a tax credit
3621     under this Subsection (3) for a period that does not exceed seven taxable years after the day on

3622     which the lease begins, as stated in the lease agreement.
3623          (4) (a) Subject to the other provisions of this Subsection (4), a claimant, estate, or trust
3624     may claim a refundable tax credit under this Subsection (4) with respect to a commercial
3625     energy system if:
3626          (i) the commercial energy system uses wind, geothermal electricity, or biomass
3627     equipment capable of producing a total of 660 or more kilowatts of electricity;
3628          (ii) (A) the commercial energy system supplies all or part of the energy required by
3629     commercial units owned or used by the claimant, estate, or trust; or
3630          (B) the claimant, estate, or trust sells all or part of the energy produced by the
3631     commercial energy system as a commercial enterprise;
3632          (iii) the claimant, estate, or trust has not claimed and will not claim a tax credit under
3633     Subsection (6) for hydrogen production using electricity for which the claimant, estate, or trust
3634     claims a tax credit under this Subsection (4); and
3635          (iv) the claimant, estate, or trust obtains a written certification from the office in
3636     accordance with Subsection (7).
3637          (b) (i) Subject to Subsection (4)(b)(ii), a tax credit under this Subsection (4) is equal to
3638     the product of:
3639          (A) 0.35 cents; and
3640          (B) the kilowatt hours of electricity produced and used or sold during the taxable year.
3641          (ii) A claimant, estate, or trust is eligible to claim a tax credit under this Subsection (4)
3642     for production occurring during a period of 48 months beginning with the month in which the
3643     commercial energy system is placed in commercial service.
3644          (c) A claimant, estate, or trust that is a lessee of a commercial energy system installed
3645     on a commercial unit may claim a tax credit under this Subsection (4) if the claimant, estate, or
3646     trust confirms that the lessor irrevocably elects not to claim the tax credit.
3647          (5) (a) Subject to the other provisions of this Subsection (5), a claimant, estate, or trust
3648     may claim a refundable tax credit as provided in this Subsection (5) if:
3649          (i) the claimant, estate, or trust owns a commercial energy system that uses solar
3650     equipment capable of producing a total of 660 or more kilowatts of electricity;
3651          (ii) (A) the commercial energy system supplies all or part of the energy required by
3652     commercial units owned or used by the claimant, estate, or trust; or

3653          (B) the claimant, estate, or trust sells all or part of the energy produced by the
3654     commercial energy system as a commercial enterprise;
3655          (iii) the claimant, estate, or trust does not claim a tax credit under Subsection (3);
3656          (iv) the claimant, estate, or trust has not claimed and will not claim a tax credit under
3657     Subsection (6) for hydrogen production using electricity for which a taxpayer claims a tax
3658     credit under this Subsection (5); and
3659          (v) the claimant, estate, or trust obtains a written certification from the office in
3660     accordance with Subsection (7).
3661          (b) (i) Subject to Subsection (5)(b)(ii), a tax credit under this Subsection (5) is equal to
3662     the product of:
3663          (A) 0.35 cents; and
3664          (B) the kilowatt hours of electricity produced and used or sold during the taxable year.
3665          (ii) A claimant, estate, or trust is eligible to claim a tax credit under this Subsection (5)
3666     for production occurring during a period of 48 months beginning with the month in which the
3667     commercial energy system is placed in commercial service.
3668          (c) A claimant, estate, or trust that is a lessee of a commercial energy system installed
3669     on a commercial unit may claim a tax credit under this Subsection (5) if the claimant, estate, or
3670     trust confirms that the lessor irrevocably elects not to claim the tax credit.
3671          (6) (a) A claimant, estate, or trust may claim a refundable tax credit as provided in this
3672     Subsection (6) if:
3673          (i) the claimant, estate, or trust owns a hydrogen production system;
3674          (ii) the hydrogen production system is completed and placed in service on or after
3675     January 1, 2022;
3676          (iii) the claimant, estate, or trust sells as a commercial enterprise, or supplies for the
3677     claimant's, estate's, or trust's own use in commercial units, the hydrogen produced from the
3678     hydrogen production system;
3679          (iv) the claimant, estate, or trust has not claimed and will not claim a tax credit under
3680     Subsection (3), (4), or (5) for electricity used to meet the requirements of this Subsection (6);
3681     and
3682          (v) the claimant, estate, or trust obtains a written certification from the office in
3683     accordance with Subsection (7).

3684          (b) (i) Subject to Subsections (6)(b)(ii) and (iii), a tax credit under this Subsection (6)
3685     is equal to the product of:
3686          (A) $0.12; and
3687          (B) the number of kilograms of hydrogen produced during the taxable year.
3688          (ii) A claimant, estate, or trust may not receive a tax credit under this Subsection (6) for
3689     more than 5,600 metric tons of hydrogen per taxable year.
3690          (iii) A claimant, estate, or trust is eligible to claim a tax credit under this Subsection (6)
3691     for production occurring during a period of 48 months beginning with the month in which the
3692     hydrogen production system is placed in commercial service.
3693          (7) (a) Before a claimant, estate, or trust may claim a tax credit under this section, the
3694     claimant, estate, or trust shall obtain a written certification from the office.
3695          (b) The office shall issue a claimant, estate, or trust a written certification if the office
3696     determines that:
3697          (i) the claimant, estate, or trust meets the requirements of this section to receive a tax
3698     credit; and
3699          (ii) the commercial energy system or the hydrogen production system with respect to
3700     which the claimant, estate, or trust seeks to claim a tax credit:
3701          (A) has been completely installed;
3702          (B) is a viable system for saving or producing energy from [renewable] clean
3703     resources; and
3704          (C) is safe, reliable, efficient, and technically feasible to ensure that the commercial
3705     energy system or the hydrogen production system uses the state's [renewable] clean and
3706     nonrenewable resources in an appropriate and economic manner.
3707          (c) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3708     office may make rules:
3709          (i) for determining whether a commercial energy system or a hydrogen production
3710     system meets the requirements of Subsection (7)(b)(ii); and
3711          (ii) for purposes of a tax credit under Subsection (3), establishing the reasonable costs
3712     of a commercial energy system, as an amount per unit of energy production.
3713          (d) A claimant, estate, or trust that obtains a written certification from the office shall
3714     retain the certification for the same time period a person is required to keep books and records

3715     under Section 59-1-1406.
3716          (e) The office shall submit to the commission an electronic list that includes:
3717          (i) the name and identifying information of each claimant, estate, or trust to which the
3718     office issues a written certification; and
3719          (ii) for each claimant, estate, or trust:
3720          (A) the amount of the tax credit listed on the written certification; and
3721          (B) the date the commercial energy system or the hydrogen production system was
3722     installed.
3723          (8) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the
3724     commission may make rules to address the certification of a tax credit under this section.
3725          (9) A tax credit under this section is in addition to any tax credits provided under the
3726     laws or rules and regulations of the United States.
3727          (10) A purchaser of one or more solar units that claims a tax credit under Section
3728     59-10-1024 for the purchase of the one or more solar units may not claim a tax credit under this
3729     section for that purchase.
3730          (11) A claimant, estate, or trust may not claim or carry forward a tax credit described in
3731     this section in a taxable year during which the claimant, estate, or trust claims or carries
3732     forward a tax credit under Section 59-10-1029.
3733          Section 44. Section 63A-5b-702 is amended to read:
3734          63A-5b-702. Standards and requirements for state facilities -- Life-cycle cost
3735     effectiveness.
3736          (1) As used in this section:
3737          (a) "Clean energy system" means a system designed to use solar, wind, geothermal
3738     power, wood, hydropower, nuclear, or other clean energy source to heat, cool, or provide
3739     electricity to a building.
3740          (b) "Life cycle cost-effective" means the most prudent cost of owning, operating, and
3741     maintaining a facility, including the initial cost, energy costs, operation and maintenance costs,
3742     repair costs, and the costs of energy conservation and [renewable] clean energy systems.
3743          [(b) "Renewable energy system" means a system designed to use solar, wind,
3744     geothermal power, wood, or other replenishable energy source to heat, cool, or provide
3745     electricity to a building.]

3746          (2) The director shall, in accordance with Title 63G, Chapter 3, Utah Administrative
3747     Rulemaking Act, make rules:
3748          (a) that establish standards and requirements for determining whether a state facility
3749     project is life cycle cost-effective;
3750          (b) for the monitoring of an agency's operation and maintenance expenditures for a
3751     state-owned facility;
3752          (c) to establish standards and requirements for utility metering;
3753          (d) that create an operation and maintenance program for an agency's facilities;
3754          (e) that establish a methodology for determining reasonably anticipated inflationary
3755     costs for each operation and maintenance program described in Subsection (2)(d);
3756          (f) that require an agency to report the amount the agency receives and expends on
3757     operation and maintenance; and
3758          (g) that provide for determining the actual cost for operation and maintenance requests
3759     for a new facility.
3760          (3) The director shall:
3761          (a) ensure that state-owned facilities, except for facilities under the control of the State
3762     Capitol Preservation Board, are life cycle cost-effective;
3763          (b) conduct ongoing facilities audits of state-owned facilities; and
3764          (c) monitor an agency's operation and maintenance expenditures for state-owned
3765     facilities as provided in rules made under Subsection (2)(b).
3766          (4) (a) An agency shall comply with the rules made under Subsection (2) for new
3767     facility requests submitted to the Legislature for a session of the Legislature after the 2017
3768     General Session.
3769          (b) The Office of the Legislative Fiscal Analyst and the Governor's Office of Planning
3770     and Budget shall, for each agency with operation and maintenance expenses, ensure that each
3771     required budget for the agency is adjusted in accordance with the rules described in Subsection
3772     (2)(e).
3773          Section 45. Section 63H-1-201 is amended to read:
3774          63H-1-201. Creation of military installation development authority -- Status and
3775     powers of authority -- Limitation.
3776          (1) There is created a military installation development authority.

3777          (2) The authority is:
3778          (a) an independent, nonprofit, separate body corporate and politic, with perpetual
3779     succession and statewide jurisdiction, whose purpose is to facilitate the development of land
3780     within a project area or on military land associated with a project area;
3781          (b) a political subdivision of the state; and
3782          (c) a public corporation, as defined in Section 63E-1-102.
3783          (3) The authority may:
3784          (a) facilitate the development of land within one or more project areas, including the
3785     ongoing operation of facilities within a project area, or development of military land associated
3786     with a project area;
3787          (b) sue and be sued;
3788          (c) enter into contracts generally;
3789          (d) by itself or through a subsidiary, buy, obtain an option upon, or otherwise acquire
3790     any interest in real or personal property:
3791          (i) in a project area; or
3792          (ii) outside a project area for public infrastructure and improvements, if the board
3793     considers the purchase, option, or other interest acquisition to be necessary for fulfilling the
3794     authority's development objectives;
3795          (e) sell, convey, grant, dispose of by gift, or otherwise dispose of any interest in real or
3796     personal property;
3797          (f) enter into a lease agreement on real or personal property, either as lessee or lessor:
3798          (i) in a project area; or
3799          (ii) outside a project area, if the board considers the lease to be necessary for fulfilling
3800     the authority's development objectives;
3801          (g) provide for the development of land within a project area or military land
3802     associated with the project area under one or more contracts;
3803          (h) exercise powers and perform functions under a contract, as authorized in the
3804     contract;
3805          (i) exercise exclusive police power within a project area to the same extent as though
3806     the authority were a municipality, including the collection of regulatory fees;
3807          (j) receive the property tax allocation and other taxes and fees as provided in this

3808     chapter;
3809          (k) accept financial or other assistance from any public or private source for the
3810     authority's activities, powers, and duties, and expend any funds so received for any of the
3811     purposes of this chapter;
3812          (l) borrow money, contract with, or accept financial or other assistance from the federal
3813     government, a public entity, or any other source for any of the purposes of this chapter and
3814     comply with any conditions of the loan, contract, or assistance;
3815          (m) issue bonds to finance the undertaking of any development objectives of the
3816     authority, including bonds under Title 11, Chapter 17, Utah Industrial Facilities and
3817     Development Act, and bonds under Title 11, Chapter 42, Assessment Area Act;
3818          (n) hire employees, including contract employees;
3819          (o) transact other business and exercise all other powers provided for in this chapter;
3820          (p) enter into a development agreement with a developer of land within a project area;
3821          (q) enter into an agreement with a political subdivision of the state under which the
3822     political subdivision provides one or more municipal services within a project area;
3823          (r) enter into an agreement with a private contractor to provide one or more municipal
3824     services within a project area;
3825          (s) provide for or finance an energy efficiency upgrade, a [renewable] clean energy
3826     system, or electric vehicle charging infrastructure as defined in Section 11-42a-102, in
3827     accordance with Title 11, Chapter 42a, Commercial Property Assessed Clean Energy Act;
3828          (t) exercise powers and perform functions that the authority is authorized by statute to
3829     exercise or perform;
3830          (u) enter into an agreement with the federal government or an agency of the federal
3831     government under which the federal government or agency:
3832          (i) provides law enforcement services only to military land within a project area; and
3833          (ii) may enter into a mutual aid or other cooperative agreement with a law enforcement
3834     agency of the state or a political subdivision of the state;
3835          (v) by itself or through a subsidiary, act as a facilitator under Title 63N, Chapter 13,
3836     Part 3, Facilitating Public-private Partnerships Act, to provide expertise and knowledge to
3837     another governmental entity interested in public-private partnerships;
3838          (w) enter into an intergovernmental support agreement under Title 10, U.S.C. Sec.

3839     2679 with the military to provide support services to the military in accordance with the
3840     agreement;
3841          (x) act as a developer, or assist a developer chosen by the military, to develop military
3842     land as part of an enhanced use lease under Title 10, U.S.C. Sec. 2667; and
3843          (y) develop public infrastructure and improvements.
3844          (4) The authority may not itself provide law enforcement service or fire protection
3845     service within a project area but may enter into an agreement for one or both of those services,
3846     as provided in Subsection (3)(q).
3847          (5) The authority shall provide support to a subsidiary that enters into an agreement
3848     under Subsection (3)(v) that the authority determines necessary for the subsidiary to fulfill the
3849     requirements of the agreement.
3850          (6) Because providing procurement, utility, construction, and other services for use by
3851     a military installation, including providing public infrastructure and improvements for use or
3852     occupancy by the military, are core functions of the authority and are typically provided by a
3853     local government for the local government's own needs or use, these services provided by the
3854     authority for the military under this chapter are considered to be for the authority's own needs
3855     and use.
3856          (7) A public infrastructure district created by the authority under Title 17D, Chapter 4,
3857     Public Infrastructure District Act, is a subsidiary of the authority.
3858          Section 46. Section 63L-11-304 is amended to read:
3859          63L-11-304. Public lands transfer study and economic analysis -- Report.
3860          (1) As used in this section:
3861          (a) "Public lands" means the same as that term is defined in Section 63L-6-102.
3862          (b) "Transfer of public lands" means the transfer of public lands from federal
3863     ownership to state ownership.
3864          (2) The office shall, on an ongoing basis, report to the Federalism Commission
3865     regarding the ramifications and economic impacts of the transfer of public lands.
3866          (3) The office shall:
3867          (a) on an ongoing basis, discuss issues related to the transfer of public lands with:
3868          (i) the School and Institutional Trust Lands Administration;
3869          (ii) local governments;

3870          (iii) water managers;
3871          (iv) environmental advocates;
3872          (v) outdoor recreation advocates;
3873          (vi) nonconventional [and], renewable, and clean energy producers;
3874          (vii) tourism representatives;
3875          (viii) wilderness advocates;
3876          (ix) ranchers and agriculture advocates;
3877          (x) oil, gas, and mining producers;
3878          (xi) fishing, hunting, and other wildlife interests;
3879          (xii) timber producers;
3880          (xiii) other interested parties; and
3881          (xiv) the Federalism Commission; and
3882          (b) develop ways to obtain input from citizens of the state regarding the transfer of
3883     public lands and the future care and use of public lands.
3884          Section 47. Section 79-3-202 is amended to read:
3885          79-3-202. Powers and duties of survey.
3886          (1) The survey shall:
3887          (a) assist and advise state and local agencies and state educational institutions on
3888     geologic, paleontologic, and mineralogic subjects;
3889          (b) collect and distribute reliable information regarding the mineral industry and
3890     mineral resources, topography, paleontology, and geology of the state;
3891          (c) survey the geology of the state, including mineral occurrences and the ores of
3892     metals, energy resources, industrial minerals and rocks, mineral-bearing waters, and surface
3893     and ground water resources, with special reference to their economic contents, values, uses,
3894     kind, and availability in order to facilitate their economic use;
3895          (d) investigate the kind, amount, and availability of mineral substances contained in
3896     lands owned and controlled by the state, to contribute to the most effective and beneficial
3897     administration of these lands for the state;
3898          (e) determine and investigate areas of geologic and topographic hazards that could
3899     affect the safety of, or cause economic loss to, the citizens of the state;
3900          (f) assist local and state agencies in their planning, zoning, and building regulation

3901     functions by publishing maps, delineating appropriately wide special earthquake risk areas,
3902     and, at the request of state agencies or other governmental agencies, review the siting of critical
3903     facilities;
3904          (g) cooperate with state agencies, political subdivisions of the state,
3905     quasi-governmental agencies, federal agencies, schools of higher education, and others in fields
3906     of mutual concern, which may include field investigations and preparation, publication, and
3907     distribution of reports and maps;
3908          (h) collect and preserve data pertaining to mineral resource exploration and
3909     development programs and construction activities, such as claim maps, location of drill holes,
3910     location of surface and underground workings, geologic plans and sections, drill logs, and
3911     assay and sample maps, including the maintenance of a sample library of cores and cuttings;
3912          (i) study and analyze other scientific, economic, or aesthetic problems as, in the
3913     judgment of the board, should be undertaken by the survey to serve the needs of the state and to
3914     support the development of natural resources and utilization of lands within the state;
3915          (j) prepare, publish, distribute, and sell maps, reports, and bulletins, embodying the
3916     work accomplished by the survey, directly or in collaboration with others, and collect and
3917     prepare exhibits of the geological and mineral resources of this state and interpret their
3918     significance;
3919          (k) collect, maintain, and preserve data and information in order to accomplish the
3920     purposes of this section and act as a repository for information concerning the geology of this
3921     state;
3922          (l) stimulate research, study, and activities in the field of paleontology;
3923          (m) mark, protect, and preserve critical paleontological sites;
3924          (n) collect, preserve, and administer critical paleontological specimens until the
3925     specimens are placed in a repository or curation facility;
3926          (o) administer critical paleontological site excavation records;
3927          (p) edit and publish critical paleontological records and reports;
3928          (q) by following the procedures and requirements of Title 63J, Chapter 5, Federal
3929     Funds Procedures Act, seek federal grants, loans, or participation in federal programs, and, in
3930     accordance with applicable federal program guidelines, administer federally funded state
3931     programs regarding:

3932          (i) renewable energy;
3933          (ii) energy efficiency; [and]
3934          (iii) energy conservation; and
3935          (iv) clean energy; and
3936          (r) collect the land use permits described in Sections 10-9a-521 and 17-27a-520.
3937          (2) (a) The survey may maintain as confidential, and not as a public record,
3938     information provided to the survey by any source.
3939          (b) The board shall adopt rules in order to determine whether to accept the information
3940     described in Subsection (2)(a) and to maintain the confidentiality of the accepted information.
3941          (c) The survey shall maintain information received from any source at the level of
3942     confidentiality assigned to it by the source.
3943          (3) Upon approval of the board, the survey shall undertake other activities consistent
3944     with Subsection (1).
3945          (4) (a) Subject to the authority granted to the department, the survey may enter into
3946     cooperative agreements with the entities specified in Subsection (1)(g), if approved by the
3947     board, and may accept or commit allocated or budgeted funds in connection with those
3948     agreements.
3949          (b) The survey may undertake joint projects with private entities if:
3950          (i) the action is approved by the board;
3951          (ii) the projects are not inconsistent with the state's objectives; and
3952          (iii) the results of the projects are available to the public.
3953          Section 48. Effective date.
3954          This bill takes effect on May 1, 2024.
3955          Section 49. Coordinating H.B. 241 with H.B. 116.
3956           If H.B. 241, Clean Energy Amendments, and H.B. 116, Commercial Property
3957     Assessed Clean Energy Act Amendments, both pass and become law, the Legislature intends
3958     that, on May 1, 2024, Subsection 11-42a-102(6) in H.B. 241 be amended to read:
3959          "(6)(a) "Clean energy system" means an energy system that:
3960          (i) produces energy from clean resources, including:
3961          (A) a photovoltaic system;
3962          (B) a solar thermal system;

3963          (C) a wind system;
3964          (D) a geothermal system, including a generation system, a direct-use system, or a
3965     ground source heat pump system;
3966          (E) a micro-hydro system;
3967          (F) a biofuel system;
3968          (G) energy derived from nuclear fuel; or
3969          (H) any other clean source system that the governing body of the local entity approves;
3970          (ii) stores energy, including:
3971          (A) a battery storage system; or
3972          (B) any other energy storing system that the governing body or chief executive officer
3973     of a local entity approves.
3974          (b) "Clean energy system" includes any improvement that relates physically or
3975     functionally to any of the products, systems, or devices listed in Subsection (6)(a)(i) or (ii).
3976          (c) "Clean energy system" does not include a system described in Subsection (6)(a)(i) if
3977     the system provides energy to property outside the energy assessment area, unless the system:
3978          (i)(A) existed before the creation of the energy assessment area; and
3979          (B) beginning before January 1, 2017, provides energy to property outside of the area
3980     that became the energy assessment area;
3981          (ii) provides energy to property outside the energy assessment area under an agreement
3982     with a public electrical utility that is substantially similar to agreements for other renewable
3983     energy systems that are not funded under this chapter; or
3984          (iii) is a biofuel system.".