<?xml version="1.0" encoding="UTF-8"?>

<leg xml:space="preserve" filenumber="2024FL1230" billnumber="SB0051" billnum="SB0051" designation="SB" otherSponsor="Christine F. Watkins" otherHouse="House" sess="2024GS" fileno="2024FL1230" date="03-08-24" printDate="06-19 07:38" subVer="-2" minVer="2" office="LEGISLATIVE GENERAL COUNSEL" actionDate="" impact="code" track=" " sponsor="Ronald M. Winterton">
  <info>
    <nextbuid>3</nextbuid>
    <aminfo anum="0" effdate="5/1/2024" datetype="most">
      <seclist>
        <sect uid="C72-6-S109_2024050120240501" fromuid="C72-6-S109_1800010118000101" buid="1" src="code" mtype="section" action="A" sort="72 06 01090020240501" effdate="5/1/2024">72-6-109</sect>
        <sect uid="EF0000" buid="2" src="uncod" untype="effdate" mtype="section" sort="UZEFF" effdate="5/1/2024"/>
      </seclist>
    </aminfo>
  </info>
  <tbox>
    <sinfo/>
    <st numlevel="1" lineno="1" slineno="0-1">ROAD CONSTRUCTION BID LIMIT AMENDMENTS</st>
    <sessionhead>2024 GENERAL SESSION</sessionhead>
    <statehead>STATE OF UTAH</statehead>
    <sponsorhead>Chief Sponsor: Ronald M. Winterton</sponsorhead>
    <otherSponsorhead>House Sponsor: Christine F. Watkins</otherSponsorhead>
  </tbox>
  <lt numlevel="1" lineno="2" slineno="0-2">
    <lthead lineno="3">LONG TITLE</lthead>
    <gdhead lineno="4">General Description:</gdhead>
    <gd numlevel="1" lineno="5" slineno="0-5">This bill updates a statutory bid limit related to procurement for class B and class C road  
      <ln numlevel="1" lineno="6" slineno="0-6"/>projects. 
    </gd>
    <hphead lineno="7">Highlighted Provisions:</hphead>
    <hp numlevel="1" lineno="8" slineno="0-8">This bill:
      <hl numlevel="1" lineno="9" slineno="0-9" level="1">increases the bid limit for class B and class C road construction projects to allow local  
        <ln numlevel="1" lineno="10" slineno="0-10"/>governments more flexibility in granting construction projects;
      </hl>
      <hl numlevel="1" lineno="11" slineno="0-11" level="1">adjusts the inflation factor on the bid limit to tie increases to the National Highway  
        <ln numlevel="1" lineno="12" slineno="0-12"/>Construction Cost Index instead of the Consumer Price Index;
      </hl>
      <hl numlevel="1" lineno="13" slineno="0-13" level="1">removes a cap on the annual increase due to inflation;</hl>
      <hl numlevel="1" lineno="14" slineno="0-14" level="1">amends provisions related to bid requirements for construction self-performed by a  
        <ln numlevel="1" lineno="15" slineno="0-15"/>county or municipality;
      </hl>
      <hl numlevel="1" lineno="16" slineno="0-16" level="1">requires construction materials used by a county or municipality for self-performed  
        <ln numlevel="1" lineno="17" slineno="0-17"/>construction are tested to ensure that the materials meet certain quality standards; and
      </hl>
      <hl numlevel="1" lineno="18" slineno="0-18" level="1">makes technical changes.</hl>
    </hp>
    <moni numlevel="1" lineno="19" slineno="0-19" display="none">Money Appropriated in this Bill:</moni>
    <moniNone lineno="20">None</moniNone>
    <oc numlevel="1" lineno="21" slineno="0-21">Other Special Clauses:</oc>
    <ocNone lineno="22">None</ocNone>
    <sa numlevel="1" lineno="23" slineno="0-23">Utah Code Sections Affected:
      <saamd numlevel="1" lineno="24" slineno="0-24">
        <snhead>AMENDS:</snhead>
        <sn num="72-6-109" src="code" uid="C72-6-S109_2024050120240501" buid="1" sort="72 06 01090020240501" numlevel="1" lineno="25" slineno="0-25">
          <bold>72-6-109</bold>, as last amended by Laws of Utah 2007, Chapter 69
        </sn>
      </saamd>
    </sa>
  </lt>
  <enacthead lineno="26"/>
  <enact numlevel="1" lineno="27" slineno="0-27">Be it enacted by the Legislature of the state of Utah:</enact>
  <bdy>
    <bsec buid="1" type="amend" src="code" num="72-6-109" uid="C72-6-S109_2024050120240501" sort="72 06 01090020240501" fromUID="C72-6-S109_1800010118000101" numlevel="1" lineno="28" slineno="1-1" sn="1">
      <section number="72-6-109" numlevel="1" lineno="29" slineno="1-2" type="amend">
        <secline lineno="28">Section 1, Section  
          <bold>72-6-109</bold> is amended to read:
        </secline>
        <catline lineno="29">
          <bold>72-6-109. Class B and C roads -- Construction and maintenance -- Definitions --  
            <ln numlevel="1" lineno="30" slineno="1-3"/>Estimates lower than bids -- Accountability.
          </bold>
        </catline>
        <subsection ssid="1-1" dnum="1-o" numlevel="1" lineno="31" slineno="1-4" placement="noreturn">
          <display>(1)</display>As used in this section and Section  
          <xref depth="3" refnumber="72-6-108">72-6-108</xref>:
          <subsection ssid="1-2" dnum="a-o" numlevel="1" lineno="32" slineno="1-5">
            <display>(a)</display>"Bid limit" means:
            <subsection ssid="1-3" dnum="i-o" numlevel="1" lineno="33" slineno="1-6">
              <display>(i)</display>for the year  
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="1" style="2" owner="gjackson" level="1" deltag="both">2003, $125,000</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="2" style="1" owner="gjackson" level="1" amendtag="both" space="true">2024, $350,000</amend>; and
            </subsection>
            <subsection ssid="1-4" dnum="ii-o" numlevel="1" lineno="34" slineno="1-7">
              <display>(ii)</display>for each year after  
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="3" style="2" owner="gjackson" level="1" deltag="both">2003</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="4" style="1" owner="gjackson" level="1" amendtag="both" space="true">2024</amend>, the amount of the bid limit for the previous year,  
              <ln numlevel="1" lineno="35" slineno="1-8"/>plus an amount calculated by multiplying the amount of the bid limit for the  
              <ln numlevel="1" lineno="36" slineno="1-9"/>previous year by
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="28" style="2" owner="gjackson" level="1" deltag="both"> the lesser of 3% or</amend>
              <amendoutend style="5"/> the actual percent change in the  
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="6" style="2" owner="gjackson" level="1" deltag="both">Consumer  
                <ln numlevel="1" lineno="37" slineno="1-10"/>Price Index
              </amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="7" style="1" owner="gjackson" level="1" amendtag="both" space="true">National Highway Construction Cost Index</amend> during the previous  
              <ln numlevel="1" lineno="38" slineno="1-11"/>calendar year.
            </subsection>
          </subsection>
          <subsection ssid="1-5" dnum="b-o:_-e" ea="erase" anum="0" owner="gjackson" style="2" numlevel="1" lineno="39" slineno="1-12">
            <display>
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="32" style="2" owner="o" level="1" deltag="start">(b)</amend>
            </display>
            <amend anum="0" ea="erase" pairid="9" style="2" owner="gjackson" level="1" deltag="end">"Consumer Price Index" means the Consumer Price Index for All Urban  
              <ln numlevel="1" lineno="40" slineno="1-13"/>Consumers as published by the Bureau of Labor Statistics of the United States  
              <ln numlevel="1" lineno="41" slineno="1-14"/>Department of Labor.
            </amend>
            <amendoutend style="5"/>
          </subsection>
          <subsection ssid="1-6" dnum="c-o:b-e" numlevel="1" lineno="42" slineno="1-15" space="false">
            <display>
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="33" style="2" owner="o" level="1" deltag="both">(c)</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="34" style="1" owner="e" level="1" amendtag="both" space="true">(b)</amend>
            </display>
            <subsection ssid="1-7" dnum="i-o" placement="sameline">
              <display>(i)</display>"Construction" means the work that would apply to:
              <subsection ssid="1-8" dnum="A-o" numlevel="1" lineno="43" slineno="1-16" tab="1">
                <display>(A)</display>any new roadbed either by addition to existing systems or relocation;
              </subsection>
              <subsection ssid="1-9" dnum="B-o" numlevel="1" lineno="44" slineno="1-17" tab="1">
                <display>(B)</display>resurfacing of existing roadways with more than two inches of bituminous 
                <ln numlevel="1" lineno="45" slineno="1-18"/>pavement; or
              </subsection>
              <subsection ssid="1-10" dnum="C-o" numlevel="1" lineno="46" slineno="1-19" tab="1">
                <display>(C)</display>new structures or replacement of existing structures, except the replacement of 
                <ln numlevel="1" lineno="47" slineno="1-20"/>drainage culverts.
              </subsection>
            </subsection>
            <subsection ssid="1-11" dnum="ii-o" numlevel="1" lineno="48" slineno="1-21">
              <display>(ii)</display>"Construction" does not include maintenance, emergency repairs, or the 
              <ln numlevel="1" lineno="49" slineno="1-22"/>installation of traffic control devices as described in Section 
              <xref depth="3" refnumber="41-6a-302">41-6a-302</xref>.
            </subsection>
          </subsection>
          <subsection ssid="1-12" dnum="d-o:c-e" numlevel="1" lineno="50" slineno="1-23">
            <display>
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="39" style="2" owner="o" level="1" deltag="both">(d)</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="40" style="1" owner="e" level="1" amendtag="both" space="true">(c)</amend>
            </display>"Improvement project" means construction and maintenance as defined in this  
            <ln numlevel="1" lineno="51" slineno="1-24"/>section except for that maintenance excluded under Subsection (2).
          </subsection>
          <subsection ssid="1-13" dnum="e-o:d-e" numlevel="1" lineno="52" slineno="1-25">
            <display>
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="40" style="2" owner="o" level="1" deltag="both">(e)</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="41" style="1" owner="e" level="1" amendtag="both" space="true">(d)</amend>
            </display>"Maintenance" means the keeping of a road facility in a safe and usable  
            <ln numlevel="1" lineno="53" slineno="1-26"/>condition to which it was constructed or improved, and includes:
            <subsection ssid="1-14" dnum="i-o" numlevel="1" lineno="54" slineno="1-27">
              <display>(i)</display>the reworking of an existing surface by the application of up to and including two  
              <ln numlevel="1" lineno="55" slineno="1-28"/>inches of bituminous pavement;
            </subsection>
            <subsection ssid="1-15" dnum="ii-o" numlevel="1" lineno="56" slineno="1-29">
              <display>(ii)</display>the installation or replacement of guardrails, seal coats, and culverts;
            </subsection>
            <subsection ssid="1-16" dnum="iii-o" numlevel="1" lineno="57" slineno="1-30">
              <display>(iii)</display>the grading or widening of an existing unpaved road or flattening of shoulders or  
              <ln numlevel="1" lineno="58" slineno="1-31"/>side slopes to meet current width and safety standards; and
            </subsection>
            <subsection ssid="1-17" dnum="iv-o" numlevel="1" lineno="59" slineno="1-32">
              <display>(iv)</display>horizontal or vertical alignment changes necessary to bring an existing road in  
              <ln numlevel="1" lineno="60" slineno="1-33"/>compliance with current safety standards.
            </subsection>
          </subsection>
          <subsection ssid="1-18" dnum="_-o:e-e" ea="amend" anum="0" owner="gjackson" style="1" numlevel="1" lineno="61" slineno="1-34">
            <display>
              <amend anum="0" ea="amend" pairid="45" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="12" style="1" owner="gjackson" level="1" amendtag="end">"National Highway Construction Cost Index" means the National Highway  
              <ln numlevel="1" lineno="62" slineno="1-35"/>Construction Cost Index published by the Federal Highway Administration.
            </amend>
          </subsection>
          <subsection ssid="1-19" dnum="f-o" numlevel="1" lineno="63" slineno="1-36">
            <display>(f)</display>"Project" means the performance of a clearly identifiable group of associated road  
            <ln numlevel="1" lineno="64" slineno="1-37"/>construction activities or the same type of maintenance process, where the  
            <ln numlevel="1" lineno="65" slineno="1-38"/>construction or maintenance is performed on any one class B or C road, within a  
            <ln numlevel="1" lineno="66" slineno="1-39"/>half-mile proximity and occurs within the same calendar year.
          </subsection>
        </subsection>
        <subsection ssid="1-20" dnum="2-o" numlevel="1" lineno="67" slineno="1-40">
          <display>(2)</display>The following types of maintenance work are not subject to the contract or bid limit  
          <ln numlevel="1" lineno="68" slineno="1-41"/>requirements of  this section:
          <subsection ssid="1-21" dnum="a-o" numlevel="1" lineno="69" slineno="1-42">
            <display>(a)</display>the repair of less than the entire surface by crack sealing or patching; and
          </subsection>
          <subsection ssid="1-22" dnum="b-o" numlevel="1" lineno="70" slineno="1-43">
            <display>(b)</display>road repairs incidental to the installation, replacement, or repair of water mains,  
            <ln numlevel="1" lineno="71" slineno="1-44"/>sewers, drainage pipes, culverts, or curbs and gutters.
          </subsection>
        </subsection>
        <subsection ssid="1-23" dnum="3-o" numlevel="1" lineno="72" slineno="1-45" space="false">
          <display>(3)</display>
          <subsection ssid="1-24" dnum="a-o" placement="sameline" space="false">
            <display>(a)</display>
            <subsection ssid="1-25" dnum="i-o" tab="1" placement="sameline">
              <display>(i)</display>If the estimates of a qualified engineer referred to in Section 
              <xref depth="3" refnumber="72-6-108">72-6-108</xref> are 
              <ln numlevel="1" lineno="73" slineno="1-46"/>substantially lower than any responsible bid received or in the event no bids are 
              <ln numlevel="1" lineno="74" slineno="1-47"/>received, the county or municipality may perform the work by force account.
            </subsection>
            <subsection ssid="1-26" dnum="ii-o" numlevel="1" lineno="75" slineno="1-48" tab="1">
              <display>(ii)</display>In no event shall "substantially lower" mean estimates that are less than 10% 
              <ln numlevel="1" lineno="76" slineno="1-49"/>below the lowest responsible bid.
            </subsection>
          </subsection>
          <subsection ssid="1-27" dnum="b-o" numlevel="1" lineno="77" slineno="1-50">
            <display>(b)</display>If a county or municipality performs an improvement project by force account, it 
            <ln numlevel="1" lineno="78" slineno="1-51"/>shall:
            <subsection ssid="1-28" dnum="i-o" numlevel="1" lineno="79" slineno="1-52">
              <display>(i)</display>provide an accounting of the costs and expenditures of the improvement including 
              <ln numlevel="1" lineno="80" slineno="1-53"/>material, labor, and direct equipment costs to be calculated using the Cost 
              <ln numlevel="1" lineno="81" slineno="1-54"/>Reference Guide for Construction Equipment by Dataquest Inc. or the Federal 
              <ln numlevel="1" lineno="82" slineno="1-55"/>Emergency Management Agency schedule of equipment rates;
            </subsection>
            <subsection ssid="1-29" dnum="ii-o" numlevel="1" lineno="83" slineno="1-56">
              <display>(ii)</display>disclose the costs and expenditures to any person upon request and allow the 
              <ln numlevel="1" lineno="84" slineno="1-57"/>person to make a copy and pay for the actual cost of the copy; and
            </subsection>
            <subsection ssid="1-30" dnum="iii-o" numlevel="1" lineno="85" slineno="1-58">
              <display>(iii)</display>perform the work using the same specifications and standards that would apply 
              <ln numlevel="1" lineno="86" slineno="1-59"/>to a private contractor.
            </subsection>
          </subsection>
        </subsection>
        <subsection ssid="1-31" dnum="_-o:4-e" ea="amend" anum="0" owner="gjackson" style="1" numlevel="1" lineno="87" slineno="1-60">
          <display>
            <amend anum="0" ea="amend" pairid="58" style="1" owner="e" level="1" amendtag="start">(4)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="15" style="1" owner="gjackson" level="1" amendtag="end">A county or municipality may not provide construction services to another municipality  
            <ln numlevel="1" lineno="88" slineno="1-61"/>until the requirements in Section  
            <xref depth="3" refnumber="72-6-108">72-6-108</xref> have been satisfied by the receiving county or  
            <ln numlevel="1" lineno="89" slineno="1-62"/>municipality.
          </amend>
        </subsection>
        <subsection ssid="1-32" dnum="_-o:5-e" ea="amend" anum="0" owner="gjackson" style="1" numlevel="1" lineno="90" slineno="1-63">
          <display>
            <amend anum="0" ea="amend" pairid="59" style="1" owner="e" level="1" amendtag="start">(5)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="18" style="1" owner="gjackson" level="1" amendtag="end">For any construction self-performed by a county or municipality that exceeds the bid  
            <ln numlevel="1" lineno="91" slineno="1-64"/>limit, the county or municipality shall seek private bids in accordance with Section  
            <xref depth="3" refnumber="72-6-108">
              <ln numlevel="1" lineno="92" slineno="1-65"/>72-6-108
            </xref>.
          </amend>
        </subsection>
        <subsection ssid="1-33" dnum="_-o:6-e" ea="amend" anum="0" owner="gjackson" style="1" numlevel="1" lineno="93" slineno="1-66" space="false">
          <display>
            <amend anum="0" ea="amend" pairid="60" style="1" owner="e" level="1" amendtag="start">(6)</amend>
          </display>
          <subsection ssid="1-34" dnum="_-o:a-e" ea="amend" anum="0" owner="gjackson" style="1" placement="sameline">
            <display>
              <amend anum="0" ea="amend" pairid="61" style="1" owner="e" level="1">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="22" style="1" owner="gjackson" level="1" amendtag="end">Before self-performing any construction, and at least annually, a county or 
              <ln numlevel="1" lineno="94" slineno="1-67"/>municipality shall ensure that the aggregate, asphalt, and concrete materials owned 
              <ln numlevel="1" lineno="95" slineno="1-68"/>by the county or municipality for construction use are tested by an independent, 
              <ln numlevel="1" lineno="96" slineno="1-69"/>qualified firm to ensure the materials meet the same standards required by the 
              <ln numlevel="1" lineno="97" slineno="1-70"/>department for private contractors for the same work.
            </amend>
          </subsection>
          <subsection ssid="1-35" dnum="_-o:b-e" ea="amend" anum="0" owner="gjackson" style="1" numlevel="1" lineno="98" slineno="1-71">
            <display>
              <amend anum="0" ea="amend" pairid="62" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="25" style="1" owner="gjackson" level="1" amendtag="end">The legislative body of the county or municipality shall ensure that the results of the 
              <ln numlevel="1" lineno="99" slineno="1-72"/>tests described in Subsection (6)(a) are public record.
            </amend>
          </subsection>
        </subsection>
      </section>
    </bsec>
    <bsec buid="2" type="uncod" untype="effdate" src="uncod" uid="EF0000" sort="UZEFF" numlevel="1" lineno="100" slineno="2-1" sn="2">
      <section type="uncod" untype="effdate" display="false" src="uncod">
        <secline lineno="100">Section 2.   
          <bold>Effective date.</bold>
        </secline>
        <sectionText lineno="101">
          <amend anum="0" ea="amend" pairid="1" style="1" owner="gjackson" level="1" amendtag="both">
            <tab/>This bill takes effect on May 1, 2024.
          </amend>
        </sectionText>
      </section>
    </bsec>
  </bdy>
  <foot>
    <rev/>
  </foot>
</leg>

