<?xml version="1.0" encoding="UTF-8"?>

<leg xml:space="preserve" filenumber="2024FL0534" billnumber="SB0161" billnum="SB0161" designation="SB" otherSponsor="Carl R. Albrecht" otherHouse="House" sess="2024GS" fileno="2024FL0534" date="03-05-24" printDate="06-19 07:33" subVer="-2" minVer="1" office="LEGISLATIVE GENERAL COUNSEL" actionDate="" impact="code" track=" " sponsor="Derrin R. Owens">
  <info>
    <nextbuid>7</nextbuid>
    <aminfo anum="0" effdate="5/1/2024" datetype="most">
      <seclist>
        <sect uid="C11-13-S318_2024050120240501" fromuid="C11-13-S318_2023050320230503" buid="1" src="code" mtype="section" action="A" sort="11 13 03180020240501" effdate="5/1/2024">11-13-318</sect>
        <sect uid="C11-13-S320_2024050120240501" buid="2" src="code" mtype="section" action="E" sort="11 13 03200020240501" effdate="5/1/2024">11-13-320</sect>
        <sect uid="C19-2-S109.4_2024050120240501" buid="3" src="code" mtype="section" action="E" sort="19 02 01090420240501" effdate="5/1/2024">19-2-109.4</sect>
        <sect uid="C79-6-S404_2024050120240501" buid="4" src="code" mtype="section" action="E" sort="79 06 04040020240501" effdate="5/1/2024">79-6-404</sect>
        <sect uid="C79-6-S405_2024050120240501" buid="5" src="code" mtype="section" action="E" sort="79 06 04050020240501" effdate="5/1/2024">79-6-405</sect>
        <sect uid="EF0000" buid="6" src="uncod" untype="effdate" mtype="section" sort="UZEFF" effdate="5/1/2024"/>
      </seclist>
    </aminfo>
  </info>
  <tbox>
    <sinfo/>
    <st numlevel="1" lineno="1" slineno="0-1">ENERGY SECURITY AMENDMENTS</st>
    <sessionhead>2024 GENERAL SESSION</sessionhead>
    <statehead>STATE OF UTAH</statehead>
    <sponsorhead>Chief Sponsor: Derrin R. Owens</sponsorhead>
    <otherSponsorhead>House Sponsor: Carl R. Albrecht</otherSponsorhead>
  </tbox>
  <lt numlevel="1" lineno="2" slineno="0-2">
    <lthead lineno="3">LONG TITLE</lthead>
    <gdhead lineno="4">General Description:</gdhead>
    <gd numlevel="1" lineno="5" slineno="0-5">This bill modifies provisions related to the regulation of energy.</gd>
    <hphead lineno="6">Highlighted Provisions:</hphead>
    <hp numlevel="1" lineno="7" slineno="0-7">This bill:
      <hl numlevel="1" lineno="8" slineno="0-8" level="1">defines terms;</hl>
      <hl numlevel="1" lineno="9" slineno="0-9" level="1">allows a project entity to submit an application for an alternative air permit;</hl>
      <hl numlevel="1" lineno="10" slineno="0-10" level="1">outlines the review process for an alternative permit and conditions for either the  
        <ln numlevel="1" lineno="11" slineno="0-11"/>alternative or transition permit to become effective;
      </hl>
      <hl numlevel="1" lineno="12" slineno="0-12" level="1">provides the state the option to purchase an electrical generation facility intended for  
        <ln numlevel="1" lineno="13" slineno="0-13"/>decommissioning;
      </hl>
      <hl numlevel="1" lineno="14" slineno="0-14" level="1">creates a Decommissioned Asset Disposition Authority (authority) within the Office of  
        <ln numlevel="1" lineno="15" slineno="0-15"/>Energy Development;
      </hl>
      <hl numlevel="1" lineno="16" slineno="0-16" level="1">requires the authority to:
        <hl numlevel="1" lineno="17" slineno="0-17" level="2">govern the disposition of an electrical generation facility purchased by the state; and</hl>
        <hl numlevel="1" lineno="18" slineno="0-18" level="2">prepare and submit an application to the Division of Air Quality for an evaluation of  
          <ln numlevel="1" lineno="19" slineno="0-19"/>the feasibility of an alternative permit; and
        </hl>
      </hl>
      <hl numlevel="1" lineno="20" slineno="0-20" level="1">requires a study from the authority to:
        <hl numlevel="1" lineno="21" slineno="0-21" level="2">analyze issues related to the state implementation plan arising out of a permit issued  
          <ln numlevel="1" lineno="22" slineno="0-22"/>to an electrical generation facility intended for decommissioning;
        </hl>
        <hl numlevel="1" lineno="23" slineno="0-23" level="2">determine and provide the fair market value of a project entity's electrical generation  
          <ln numlevel="1" lineno="24" slineno="0-24"/>facility intended for decommissioning; and
        </hl>
        <hl numlevel="1" lineno="25" slineno="0-25" level="2">evaluate the process for selling an electrical generation facility purchased by the state.</hl>
      </hl>
    </hp>
    <moni numlevel="1" lineno="26" slineno="0-26" display="none">Money Appropriated in this Bill:</moni>
    <moniNone lineno="27">None</moniNone>
    <oc numlevel="1" lineno="28" slineno="0-28">Other Special Clauses:</oc>
    <ocNone lineno="29">None</ocNone>
    <sa numlevel="1" lineno="30" slineno="0-30">Utah Code Sections Affected:
      <saamd numlevel="1" lineno="31" slineno="0-31">
        <snhead>AMENDS:</snhead>
        <sn num="11-13-318" src="code" uid="C11-13-S318_2024050120240501" buid="1" sort="11 13 03180020240501" numlevel="1" lineno="32" slineno="0-32">
          <bold>11-13-318</bold>, as enacted by Laws of Utah 2023, Chapter 195
        </sn>
      </saamd>
      <saent numlevel="1" lineno="33" slineno="0-33">
        <snhead>ENACTS:</snhead>
        <sn num="11-13-320" src="code" uid="C11-13-S320_2024050120240501" buid="2" sort="11 13 03200020240501" numlevel="1" lineno="34" slineno="0-34">
          <bold>11-13-320</bold>, Utah Code Annotated 1953
        </sn>
        <sn num="19-2-109.4" src="code" uid="C19-2-S109.4_2024050120240501" buid="3" sort="19 02 01090420240501" numlevel="1" lineno="35" slineno="0-35">
          <bold>19-2-109.4</bold>, Utah Code Annotated 1953
        </sn>
        <sn num="79-6-404" src="code" uid="C79-6-S404_2024050120240501" buid="4" sort="79 06 04040020240501" numlevel="1" lineno="36" slineno="0-36">
          <bold>79-6-404</bold>, Utah Code Annotated 1953
        </sn>
        <sn num="79-6-405" src="code" uid="C79-6-S405_2024050120240501" buid="5" sort="79 06 04050020240501" numlevel="1" lineno="37" slineno="0-37">
          <bold>79-6-405</bold>, Utah Code Annotated 1953
        </sn>
      </saent>
    </sa>
  </lt>
  <enacthead lineno="38"/>
  <enact numlevel="1" lineno="39" slineno="0-39">Be it enacted by the Legislature of the state of Utah:</enact>
  <bdy>
    <bsec buid="1" type="amend" src="code" num="11-13-318" uid="C11-13-S318_2024050120240501" sort="11 13 03180020240501" fromUID="C11-13-S318_2023050320230503" numlevel="1" lineno="40" slineno="1-1" sn="1">
      <section number="11-13-318" numlevel="1" lineno="41" slineno="1-2" type="amend">
        <secline lineno="40">Section 1, Section  
          <bold>11-13-318</bold> is amended to read:
        </secline>
        <catline lineno="41">
          <bold>11-13-318. Notice of decommissioning or disposal of project entity assets.</bold>
        </catline>
        <subsection ssid="1-1" numlevel="1" lineno="42" slineno="1-3" dnum="1-o" placement="noreturn">
          <display>(1)</display>As used in this section:
          <subsection ssid="1-2" numlevel="1" lineno="43" slineno="1-4" dnum="a-o">
            <display>(a)</display>
            <amend anum="0" ea="amend" pairid="1" style="1" owner="selder" level="1" amendtag="both">"Alternative permit" means the same as that term is defined in Section  
              <xref depth="3" refnumber="11-13-320">11-13-320</xref>.
            </amend>
          </subsection>
          <subsection ssid="1-3" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="44" slineno="1-5" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="23" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="3" style="1" owner="selder" level="1" amendtag="end">"Decommissioning" means to remove an electrical generation facility from active  
              <ln numlevel="1" lineno="45" slineno="1-6"/>service.
            </amend>
          </subsection>
          <subsection ssid="1-4" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="46" slineno="1-7" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="24" style="1" owner="e" level="1" amendtag="both">(c)</amend>
            </display>"Disposal" means the sale, transfer,
            <amend anum="0" ea="amend" pairid="6" style="1" owner="selder" level="1" amendtag="both"> dismantling,</amend> or other disposition of a project  
            <ln numlevel="1" lineno="47" slineno="1-8"/>entity's assets.
          </subsection>
          <subsection ssid="1-5" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="48" slineno="1-9" dnum="_-e:d-e">
            <display>
              <amend anum="0" ea="amend" pairid="25" style="1" owner="e" level="1" amendtag="start">(d)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="9" style="1" owner="selder" level="1" amendtag="end">"Division" means the Division of Air Quality created in Section  
              <xref depth="3" refnumber="19-1-105">19-1-105</xref>.
            </amend>
          </subsection>
          <subsection ssid="1-6" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="49" slineno="1-10" dnum="_-e:e-e">
            <display>
              <amend anum="0" ea="amend" pairid="26" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="12" style="1" owner="selder" level="1" amendtag="end">"Fair market value" means the same as that term is defined in Section  
              <xref depth="3" refnumber="79-6-405">79-6-405</xref>.
            </amend>
          </subsection>
          <subsection ssid="1-7" numlevel="1" lineno="50" slineno="1-11" dnum="b-o:f-e" space="false">
            <display>
              <amendoutstart style="5"/>
              <amend anum="0" ea="erase" pairid="27" style="2" owner="o" level="1" deltag="both">(b)</amend>
              <amendoutend style="5"/>
              <amend anum="0" ea="amend" pairid="28" style="1" owner="e" level="1" amendtag="both" space="true">(f)</amend>
            </display>
            <subsection ssid="1-8" dnum="i-o" placement="sameline">
              <display>(i)</display>"Project entity asset" means a project entity's:
              <subsection ssid="1-9" numlevel="1" lineno="51" slineno="1-12" dnum="A-o" tab="1">
                <display>(A)</display>land;
              </subsection>
              <subsection ssid="1-10" numlevel="1" lineno="52" slineno="1-13" dnum="B-o" tab="1">
                <display>(B)</display>buildings; or
              </subsection>
              <subsection ssid="1-11" numlevel="1" lineno="53" slineno="1-14" dnum="C-o" tab="1">
                <display>(C)</display>essential equipment, including turbines, generators, transformers, and 
                <ln numlevel="1" lineno="54" slineno="1-15"/>transmission lines.
              </subsection>
            </subsection>
            <subsection ssid="1-12" numlevel="1" lineno="55" slineno="1-16" dnum="ii-o">
              <display>(ii)</display>"Project entity asset" does not include an asset that is not essential for the 
              <ln numlevel="1" lineno="56" slineno="1-17"/>generation of electricity in the project entity's coal-powered electrical generation 
              <ln numlevel="1" lineno="57" slineno="1-18"/>facility.
            </subsection>
          </subsection>
        </subsection>
        <subsection ssid="1-13" numlevel="1" lineno="58" slineno="1-19" dnum="2-o">
          <display>(2)</display>A project entity shall provide a notice of decommissioning or disposal to the Legislative  
          <ln numlevel="1" lineno="59" slineno="1-20"/>Management Committee at least 180 days before:
          <subsection ssid="1-14" numlevel="1" lineno="60" slineno="1-21" dnum="a-o">
            <display>(a)</display>the disposal of any project entity assets; or
          </subsection>
          <subsection ssid="1-15" numlevel="1" lineno="61" slineno="1-22" dnum="b-o">
            <display>(b)</display>the decommissioning of the project entity's coal-powered electrical generation  
            <ln numlevel="1" lineno="62" slineno="1-23"/>facility.
          </subsection>
        </subsection>
        <subsection ssid="1-16" numlevel="1" lineno="63" slineno="1-24" dnum="3-o">
          <display>(3)</display>The notice of decommissioning or disposal described in Subsection (2) shall include:
          <subsection ssid="1-17" numlevel="1" lineno="64" slineno="1-25" dnum="a-o">
            <display>(a)</display>the date of the intended decommissioning or disposal;
          </subsection>
          <subsection ssid="1-18" numlevel="1" lineno="65" slineno="1-26" dnum="b-o">
            <display>(b)</display>a description of the project entity's coal-powered electrical generation facility  
            <ln numlevel="1" lineno="66" slineno="1-27"/>intended for decommissioning or any project entity asset intended for disposal; and
          </subsection>
          <subsection ssid="1-19" numlevel="1" lineno="67" slineno="1-28" dnum="c-o">
            <display>(c)</display>the reasons for the decommissioning or disposal.
          </subsection>
        </subsection>
        <subsection ssid="1-20" numlevel="1" lineno="68" slineno="1-29" dnum="4-o">
          <display>(4)</display>A project entity may not intentionally prevent the functionality of the project entity's  
          <ln numlevel="1" lineno="69" slineno="1-30"/>existing coal-powered electrical generation facility.
        </subsection>
        <subsection ssid="1-21" numlevel="1" lineno="70" slineno="1-31" dnum="5-o">
          <display>(5)</display>Notwithstanding the requirements in Subsections (2) through (4), a project entity may  
          <ln numlevel="1" lineno="71" slineno="1-32"/>take any action necessary to transition to a new electrical generation facility powered by  
          <ln numlevel="1" lineno="72" slineno="1-33"/>natural gas, hydrogen, or a combination of natural gas and hydrogen, including any  
          <ln numlevel="1" lineno="73" slineno="1-34"/>action that has been approved by a permitting authority.
        </subsection>
        <subsection ssid="1-22" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="74" slineno="1-35" dnum="_-e:6-e">
          <display>
            <amend anum="0" ea="amend" pairid="42" style="1" owner="e" level="1" amendtag="start">(6)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="15" style="1" owner="selder" level="1" amendtag="end">If a project entity intends to submit an application for an alternative permit to the  
            <ln numlevel="1" lineno="75" slineno="1-36"/>division as described in Section  
            <xref depth="3" refnumber="11-13-320">11-13-320</xref>, the project entity shall notify the Legislative  
            <ln numlevel="1" lineno="76" slineno="1-37"/>Management Committee that the project entity intends to submit an application before  
            <ln numlevel="1" lineno="77" slineno="1-38"/>July 1, 2024.
          </amend>
        </subsection>
        <subsection ssid="1-23" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="78" slineno="1-39" dnum="_-e:7-e">
          <display>
            <amend anum="0" ea="amend" pairid="43" style="1" owner="e" level="1" amendtag="start">(7)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="18" style="1" owner="selder" level="1" amendtag="end">If a project does not notify the Legislative Management Committee of an intent to  
            <ln numlevel="1" lineno="79" slineno="1-40"/>submit an application, the Legislative Management Committee shall make  
            <ln numlevel="1" lineno="80" slineno="1-41"/>recommendations to the governor regarding appropriate action, which may include  
            <ln numlevel="1" lineno="81" slineno="1-42"/>calling a special session to enact legislation reconstituting the board of the project entity.
          </amend>
        </subsection>
        <subsection ssid="1-24" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="82" slineno="1-43" dnum="_-e:8-e">
          <display>
            <amend anum="0" ea="amend" pairid="44" style="1" owner="e" level="1" amendtag="start">(8)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="21" style="1" owner="selder" level="1" amendtag="end">A project entity shall provide the state the option to purchase for fair market value a  
            <ln numlevel="1" lineno="83" slineno="1-44"/>project entity asset intended for decommissioning, with the option remaining open for at  
            <ln numlevel="1" lineno="84" slineno="1-45"/>least two years, beginning on July 2, 2025.
          </amend>
        </subsection>
      </section>
    </bsec>
    <bsec buid="2" type="enact" src="code" num="11-13-320" uid="C11-13-S320_2024050120240501" sort="11 13 03200020240501" numlevel="1" lineno="85" slineno="2-1" sn="2">
      <section number="11-13-320" numlevel="1" lineno="86" slineno="2-2" type="enact">
        <secline lineno="85">Section 2, Section  
          <bold>11-13-320</bold> is enacted to read:
        </secline>
        <catline lineno="86">
          <bold>11-13-320. Air quality permitting transition process.</bold>
        </catline>
        <subsection ssid="2-1" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="87" slineno="2-3" dnum="_-e:1-e" placement="noreturn">
          <display>
            <amend anum="0" ea="amend" pairid="26" style="1" owner="e" level="1" amendtag="start">(1)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="2" style="1" owner="selder" level="1" amendtag="end">As used in this section:</amend>
          <subsection ssid="2-2" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="88" slineno="2-4" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="27" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="4" style="1" owner="selder" level="1" amendtag="end">"Alternative permit" means an amendment to a transition permit that, for purposes of  
              <ln numlevel="1" lineno="89" slineno="2-5"/>transitioning an electrical generation facility to a new facility, allows one or more  
              <ln numlevel="1" lineno="90" slineno="2-6"/>existing generating units to continue operating while also providing for closure of  
              <ln numlevel="1" lineno="91" slineno="2-7"/>one but not all existing generating units.
            </amend>
          </subsection>
          <subsection ssid="2-3" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="92" slineno="2-8" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="28" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="7" style="1" owner="selder" level="1" amendtag="end">"Authority" means the Decommissioned Asset Disposition Authority established in  
              <ln numlevel="1" lineno="93" slineno="2-9"/>Section  
              <xref depth="3" refnumber="79-6-404">79-6-404</xref>.
            </amend>
          </subsection>
          <subsection ssid="2-4" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="94" slineno="2-10" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="29" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="10" style="1" owner="selder" level="1" amendtag="end">"Division" means the Division of Air Quality created in Section  
              <xref depth="3" refnumber="19-1-105">19-1-105</xref>.
            </amend>
          </subsection>
          <subsection ssid="2-5" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="95" slineno="2-11" dnum="_-e:d-e">
            <display>
              <amend anum="0" ea="amend" pairid="30" style="1" owner="e" level="1" amendtag="start">(d)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="13" style="1" owner="selder" level="1" amendtag="end">"Pre-existing permit" means the air quality permit held by the operator of an existing  
              <ln numlevel="1" lineno="96" slineno="2-12"/>electrical generation facility prior to any amendments associated with transitioning to  
              <ln numlevel="1" lineno="97" slineno="2-13"/>a new facility.
            </amend>
          </subsection>
          <subsection ssid="2-6" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="98" slineno="2-14" dnum="_-e:e-e">
            <display>
              <amend anum="0" ea="amend" pairid="31" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="16" style="1" owner="selder" level="1" amendtag="end">"Transition permit" means an amendment to the pre-existing permit, issued to the  
              <ln numlevel="1" lineno="99" slineno="2-15"/>operator of an existing electrical generation facility for the purpose of transitioning to  
              <ln numlevel="1" lineno="100" slineno="2-16"/>a new electrical generation facility, which authorizes construction of the new facility  
              <ln numlevel="1" lineno="101" slineno="2-17"/>but does not require closure of all existing generating units until after the new facility  
              <ln numlevel="1" lineno="102" slineno="2-18"/>commences operation.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="2-7" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="103" slineno="2-19" dnum="_-e:2-e">
          <display>
            <amend anum="0" ea="amend" pairid="32" style="1" owner="e" level="1" amendtag="start">(2)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="20" style="1" owner="selder" level="1" amendtag="end">A project entity that holds a pre-existing permit for an existing electrical generation  
            <ln numlevel="1" lineno="104" slineno="2-20"/>facility with multiple generating units, and has been issued a transition permit for a new  
            <ln numlevel="1" lineno="105" slineno="2-21"/>electrical generation facility, may submit an application to the division in accordance  
            <ln numlevel="1" lineno="106" slineno="2-22"/>with Section  
            <xref depth="3" refnumber="19-2-109.4">19-2-109.4</xref> for issuance of an alternative permit.
          </amend>
        </subsection>
        <subsection ssid="2-8" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="107" slineno="2-23" dnum="_-e:3-e">
          <display>
            <amend anum="0" ea="amend" pairid="33" style="1" owner="e" level="1" amendtag="start">(3)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="23" style="1" owner="selder" level="1" amendtag="end">If a project entity intends to submit an application under Subsection (2), the project  
            <ln numlevel="1" lineno="108" slineno="2-24"/>entity shall provide a binding notice of intent to the Legislative Management Committee  
            <ln numlevel="1" lineno="109" slineno="2-25"/>on or before July 1, 2024.
          </amend>
        </subsection>
        <subsection ssid="2-9" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="110" slineno="2-26" dnum="_-e:4-e">
          <display>
            <amend anum="0" ea="amend" pairid="34" style="1" owner="e" level="1" amendtag="start">(4)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="26" style="1" owner="selder" level="1" amendtag="end">If a project entity submits an application under Subsection (2), the project entity shall  
            <ln numlevel="1" lineno="111" slineno="2-27"/>submit the application on or before January 1, 2025.
          </amend>
        </subsection>
      </section>
    </bsec>
    <bsec buid="3" type="enact" src="code" num="19-2-109.4" uid="C19-2-S109.4_2024050120240501" sort="19 02 01090420240501" numlevel="1" lineno="112" slineno="3-1" sn="3">
      <section number="19-2-109.4" numlevel="1" lineno="113" slineno="3-2" type="enact">
        <secline lineno="112">Section 3, Section  
          <bold>19-2-109.4</bold> is enacted to read:
        </secline>
        <catline lineno="113">
          <bold>19-2-109.4. Project entity transition permit.</bold>
        </catline>
        <subsection ssid="3-1" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="114" slineno="3-3" dnum="_-e:1-e" placement="noreturn">
          <display>
            <amend anum="0" ea="amend" pairid="52" style="1" owner="e" level="1" amendtag="start">(1)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="2" style="1" owner="selder" level="1" amendtag="end">As used in this section:</amend>
          <subsection ssid="3-2" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="115" slineno="3-4" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="53" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="4" style="1" owner="selder" level="1" amendtag="end">"Alternative permit" means an amendment to a transition permit that, for purposes of  
              <ln numlevel="1" lineno="116" slineno="3-5"/>transitioning an electrical generation facility to a new facility, allows one or more  
              <ln numlevel="1" lineno="117" slineno="3-6"/>existing generating units to continue operating while also providing for closure of  
              <ln numlevel="1" lineno="118" slineno="3-7"/>one but not all existing generating units.
            </amend>
          </subsection>
          <subsection ssid="3-3" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="119" slineno="3-8" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="54" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="7" style="1" owner="selder" level="1" amendtag="end">"Authority" means the Decommissioned Asset Disposition Authority established in  
              <ln numlevel="1" lineno="120" slineno="3-9"/>Section  
              <xref depth="3" refnumber="79-6-404">79-6-404</xref>.
            </amend>
          </subsection>
          <subsection ssid="3-4" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="121" slineno="3-10" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="55" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="10" style="1" owner="selder" level="1" amendtag="end">"Division" means the Division of Air Quality created in Section  
              <xref depth="3" refnumber="19-1-105">19-1-105</xref>.
            </amend>
          </subsection>
          <subsection ssid="3-5" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="122" slineno="3-11" dnum="_-e:d-e">
            <display>
              <amend anum="0" ea="amend" pairid="56" style="1" owner="e" level="1" amendtag="start">(d)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="13" style="1" owner="selder" level="1" amendtag="end">"Pre-existing permit" means the air quality permit held by the operator of an existing  
              <ln numlevel="1" lineno="123" slineno="3-12"/>electrical generation facility prior to any amendments associated with transitioning to  
              <ln numlevel="1" lineno="124" slineno="3-13"/>a new facility.
            </amend>
          </subsection>
          <subsection ssid="3-6" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="125" slineno="3-14" dnum="_-e:e-e">
            <display>
              <amend anum="0" ea="amend" pairid="57" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="16" style="1" owner="selder" level="1" amendtag="end">"Project entity" means the same as that term is defined in Section  
              <xref depth="3" refnumber="11-13-103">11-13-103</xref>.
            </amend>
          </subsection>
          <subsection ssid="3-7" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="126" slineno="3-15" dnum="_-e:f-e">
            <display>
              <amend anum="0" ea="amend" pairid="58" style="1" owner="e" level="1" amendtag="start">(f)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="19" style="1" owner="selder" level="1" amendtag="end">"Transition permit" means an amendment to the pre-existing permit, issued to the  
              <ln numlevel="1" lineno="127" slineno="3-16"/>operator of an existing electrical generation facility for the purpose of transitioning to  
              <ln numlevel="1" lineno="128" slineno="3-17"/>a new electrical generation facility, which authorizes construction of the new facility  
              <ln numlevel="1" lineno="129" slineno="3-18"/>but does not require closure of all existing generating units until after the new facility  
              <ln numlevel="1" lineno="130" slineno="3-19"/>commences operation.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="3-8" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="131" slineno="3-20" dnum="_-e:2-e">
          <display>
            <amend anum="0" ea="amend" pairid="59" style="1" owner="e" level="1" amendtag="start">(2)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="23" style="1" owner="selder" level="1" amendtag="end">The division shall accept an application for an alternative permit from a project entity  
            <ln numlevel="1" lineno="132" slineno="3-21"/>that has previously obtained a transition permit to authorize the same new electrical  
            <ln numlevel="1" lineno="133" slineno="3-22"/>generating capacity contemplated by the transition permit.
          </amend>
        </subsection>
        <subsection ssid="3-9" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="134" slineno="3-23" dnum="_-e:3-e">
          <display>
            <amend anum="0" ea="amend" pairid="60" style="1" owner="e" level="1" amendtag="start">(3)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="26" style="1" owner="selder" level="1" amendtag="end">If the application for an alternative permit meets the requirements established by the  
            <ln numlevel="1" lineno="135" slineno="3-24"/>board:
          </amend>
          <subsection ssid="3-10" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="136" slineno="3-25" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="61" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="28" style="1" owner="selder" level="1" amendtag="end">the division shall issue an approval order for the alternative permit to the project  
              <ln numlevel="1" lineno="137" slineno="3-26"/>entity;
            </amend>
          </subsection>
          <subsection ssid="3-11" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="138" slineno="3-27" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="62" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="31" style="1" owner="selder" level="1" amendtag="end">the conditions of the transition permit shall cease to apply, including requirements to  
              <ln numlevel="1" lineno="139" slineno="3-28"/>reduce the capacity of existing generating units at the electrical generation facility;  
              <ln numlevel="1" lineno="140" slineno="3-29"/>and
            </amend>
          </subsection>
          <subsection ssid="3-12" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="141" slineno="3-30" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="63" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="34" style="1" owner="selder" level="1" amendtag="end">the project entity shall submit all documentation required to modify any federal  
              <ln numlevel="1" lineno="142" slineno="3-31"/>operating permit required to be maintained by the project entity, consistent with  
              <ln numlevel="1" lineno="143" slineno="3-32"/>deadlines established by the division.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="3-13" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="144" slineno="3-33" dnum="_-e:4-e">
          <display>
            <amend anum="0" ea="amend" pairid="64" style="1" owner="e" level="1" amendtag="start">(4)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="38" style="1" owner="selder" level="1" amendtag="end">If an alternative permit is not approved under Subsection (3), the conditions of the  
            <ln numlevel="1" lineno="145" slineno="3-34"/>transition permit shall remain effective.
          </amend>
        </subsection>
        <subsection ssid="3-14" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="146" slineno="3-35" dnum="_-e:5-e" space="false">
          <display>
            <amend anum="0" ea="amend" pairid="65" style="1" owner="e" level="1" amendtag="start">(5)</amend>
          </display>
          <subsection ssid="3-15" ea="amend" anum="0" owner="selder" style="1" dnum="_-e:a-e" placement="sameline">
            <display>
              <amend anum="0" ea="amend" pairid="66" style="1" owner="e" level="1">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="42" style="1" owner="selder" level="1" amendtag="end">Upon receipt of an alternative air permit application prepared and submitted by 
              <ln numlevel="1" lineno="147" slineno="3-36"/>the authority in accordance with Subsection 
              <xref depth="3" refnumber="79-6-404">79-6-404</xref>(4)(c), the division shall 
              <ln numlevel="1" lineno="148" slineno="3-37"/>conduct a full evaluation as if the application had been prepared and submitted by a 
              <ln numlevel="1" lineno="149" slineno="3-38"/>project entity to determine whether the alternative air permit would be issued if 
              <ln numlevel="1" lineno="150" slineno="3-39"/>applied for by the project entity.
            </amend>
          </subsection>
          <subsection ssid="3-16" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="151" slineno="3-40" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="67" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="45" style="1" owner="selder" level="1" amendtag="end">The division shall provide the results of any evaluation conducted under Subsection 
              <ln numlevel="1" lineno="152" slineno="3-41"/>(5)(a) to the authority no later than January 30, 2025.
            </amend>
          </subsection>
          <subsection ssid="3-17" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="153" slineno="3-42" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="68" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="48" style="1" owner="selder" level="1" amendtag="end">If the division concludes after evaluation that an alternative permit would likely be 
              <ln numlevel="1" lineno="154" slineno="3-43"/>issued to a project entity, the authority shall, within 30 days after the authority 
              <ln numlevel="1" lineno="155" slineno="3-44"/>receives the results of the evaluation, submit recommendations to the Legislative 
              <ln numlevel="1" lineno="156" slineno="3-45"/>Management Committee regarding options for the state to continue to authorize 
              <ln numlevel="1" lineno="157" slineno="3-46"/>construction of the project entity's new electrical generation facility that do not 
              <ln numlevel="1" lineno="158" slineno="3-47"/>require the closure of all of the project entity's existing electrical generating facilities.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="3-18" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="159" slineno="3-48" dnum="_-e:6-e">
          <display>
            <amend anum="0" ea="amend" pairid="69" style="1" owner="e" level="1" amendtag="start">(6)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="52" style="1" owner="selder" level="1" amendtag="end">The division shall evaluate an application for an alternative permit independently from  
            <ln numlevel="1" lineno="160" slineno="3-49"/>any pre-existing permit or transition permit based on updated assumptions, modeling,  
            <ln numlevel="1" lineno="161" slineno="3-50"/>and requirements established in rule by the division and may rely upon the reduction of  
            <ln numlevel="1" lineno="162" slineno="3-51"/>capacity of the existing electrical generation facility only as necessary to ensure that  
            <ln numlevel="1" lineno="163" slineno="3-52"/>emissions of the new generating facility do not exceed thresholds established by federal  
            <ln numlevel="1" lineno="164" slineno="3-53"/>law which would necessitate new source review as a major modification.
          </amend>
        </subsection>
      </section>
    </bsec>
    <bsec buid="4" type="enact" src="code" num="79-6-404" uid="C79-6-S404_2024050120240501" sort="79 06 04040020240501" numlevel="1" lineno="165" slineno="4-1" sn="4">
      <section number="79-6-404" numlevel="1" lineno="166" slineno="4-2" type="enact">
        <secline lineno="165">Section 4, Section  
          <bold>79-6-404</bold> is enacted to read:
        </secline>
        <catline lineno="166">
          <bold>79-6-404. Decommissioned Asset Disposition Authority.</bold>
        </catline>
        <subsection ssid="4-1" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="167" slineno="4-3" dnum="_-e:1-e" placement="noreturn">
          <display>
            <amend anum="0" ea="amend" pairid="129" style="1" owner="e" level="1" amendtag="start">(1)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="2" style="1" owner="selder" level="1" amendtag="end">As used in this section:</amend>
          <subsection ssid="4-2" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="168" slineno="4-4" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="130" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="4" style="1" owner="selder" level="1" amendtag="end">"Asset intended for decommissioning" means an electrical generation facility owned  
              <ln numlevel="1" lineno="169" slineno="4-5"/>by a project entity that is intended to be removed from active service.
            </amend>
          </subsection>
          <subsection ssid="4-3" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="170" slineno="4-6" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="131" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="7" style="1" owner="selder" level="1" amendtag="end">"Authority" means the Decommissioned Asset Disposition Authority created in this  
              <ln numlevel="1" lineno="171" slineno="4-7"/>section.
            </amend>
          </subsection>
          <subsection ssid="4-4" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="172" slineno="4-8" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="132" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="10" style="1" owner="selder" level="1" amendtag="end">"Fair market value" means the value of an electrical generation facility considering  
              <ln numlevel="1" lineno="173" slineno="4-9"/>both the assets and liabilities of the facility, including the value of water rights  
              <ln numlevel="1" lineno="174" slineno="4-10"/>necessary to operate the existing electrical generation facility at full capacity.
            </amend>
          </subsection>
          <subsection ssid="4-5" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="175" slineno="4-11" dnum="_-e:d-e">
            <display>
              <amend anum="0" ea="amend" pairid="133" style="1" owner="e" level="1" amendtag="start">(d)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="13" style="1" owner="selder" level="1" amendtag="end">"Highest and best purchase offer" means the purchase offer for the asset intended for  
              <ln numlevel="1" lineno="176" slineno="4-12"/>decommissioning that the authority determines to be in the overall best interest of the  
              <ln numlevel="1" lineno="177" slineno="4-13"/>state, considering:
            </amend>
            <subsection ssid="4-6" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="178" slineno="4-14" dnum="_-e:i-e">
              <display>
                <amend anum="0" ea="amend" pairid="134" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="15" style="1" owner="selder" level="1" amendtag="end">the purchase price offer amount;</amend>
            </subsection>
            <subsection ssid="4-7" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="179" slineno="4-15" dnum="_-e:ii-e">
              <display>
                <amend anum="0" ea="amend" pairid="135" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="18" style="1" owner="selder" level="1" amendtag="end">the potential purchaser's:</amend>
              <subsection ssid="4-8" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="180" slineno="4-16" dnum="_-e:A-e">
                <display>
                  <amend anum="0" ea="amend" pairid="136" style="1" owner="e" level="1" amendtag="start">(A)</amend>
                </display>
                <amend anum="0" ea="amend" pairid="20" style="1" owner="selder" level="1" amendtag="end">commitment to utilize the best available control technology;</amend>
              </subsection>
              <subsection ssid="4-9" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="181" slineno="4-17" dnum="_-e:B-e">
                <display>
                  <amend anum="0" ea="amend" pairid="137" style="1" owner="e" level="1" amendtag="start">(B)</amend>
                </display>
                <amend anum="0" ea="amend" pairid="23" style="1" owner="selder" level="1" amendtag="end">intent to use state resources to the maximum extent feasible;</amend>
              </subsection>
              <subsection ssid="4-10" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="182" slineno="4-18" dnum="_-e:C-e">
                <display>
                  <amend anum="0" ea="amend" pairid="138" style="1" owner="e" level="1" amendtag="start">(C)</amend>
                </display>
                <amend anum="0" ea="amend" pairid="26" style="1" owner="selder" level="1" amendtag="end">commitment to provide jobs and other economic benefits to the state;</amend>
              </subsection>
              <subsection ssid="4-11" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="183" slineno="4-19" dnum="_-e:D-e">
                <display>
                  <amend anum="0" ea="amend" pairid="139" style="1" owner="e" level="1" amendtag="start">(D)</amend>
                </display>
                <amend anum="0" ea="amend" pairid="29" style="1" owner="selder" level="1" amendtag="end">intent to promote the interests of state residents and ratepayers; and</amend>
              </subsection>
              <subsection ssid="4-12" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="184" slineno="4-20" dnum="_-e:E-e">
                <display>
                  <amend anum="0" ea="amend" pairid="140" style="1" owner="e" level="1" amendtag="start">(E)</amend>
                </display>
                <amend anum="0" ea="amend" pairid="32" style="1" owner="selder" level="1" amendtag="end">financial capability; and</amend>
              </subsection>
            </subsection>
            <subsection ssid="4-13" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="185" slineno="4-21" dnum="_-e:iii-e">
              <display>
                <amend anum="0" ea="amend" pairid="141" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="36" style="1" owner="selder" level="1" amendtag="end">any other factors the authority considers relevant.</amend>
            </subsection>
          </subsection>
          <subsection ssid="4-14" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="186" slineno="4-22" dnum="_-e:e-e">
            <display>
              <amend anum="0" ea="amend" pairid="142" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="40" style="1" owner="selder" level="1" amendtag="end">"Project entity" means the same as that term is defined in Section  
              <xref depth="3" refnumber="11-13-103">11-13-103</xref>.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="4-15" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="187" slineno="4-23" dnum="_-e:2-e">
          <display>
            <amend anum="0" ea="amend" pairid="143" style="1" owner="e" level="1" amendtag="start">(2)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="44" style="1" owner="selder" level="1" amendtag="end">There is established within the office the Decommissioned Asset Disposition Authority.</amend>
        </subsection>
        <subsection ssid="4-16" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="188" slineno="4-24" dnum="_-e:3-e" space="false">
          <display>
            <amend anum="0" ea="amend" pairid="144" style="1" owner="e" level="1" amendtag="start">(3)</amend>
          </display>
          <subsection ssid="4-17" ea="amend" anum="0" owner="selder" style="1" dnum="_-e:a-e" placement="sameline">
            <display>
              <amend anum="0" ea="amend" pairid="145" style="1" owner="e" level="1">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="48" style="1" owner="selder" level="1" amendtag="end">The authority shall be composed of:</amend>
            <subsection ssid="4-18" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="189" slineno="4-25" dnum="_-e:i-e" tab="1">
              <display>
                <amend anum="0" ea="amend" pairid="146" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="50" style="1" owner="selder" level="1" amendtag="end">the executive director of the office;</amend>
            </subsection>
            <subsection ssid="4-19" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="190" slineno="4-26" dnum="_-e:ii-e" tab="1">
              <display>
                <amend anum="0" ea="amend" pairid="147" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="53" style="1" owner="selder" level="1" amendtag="end">two members appointed by the governor;</amend>
            </subsection>
            <subsection ssid="4-20" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="191" slineno="4-27" dnum="_-e:iii-e" tab="1">
              <display>
                <amend anum="0" ea="amend" pairid="148" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="56" style="1" owner="selder" level="1" amendtag="end">two members appointed by the president of the Senate; and</amend>
            </subsection>
            <subsection ssid="4-21" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="192" slineno="4-28" dnum="_-e:iv-e" tab="1">
              <display>
                <amend anum="0" ea="amend" pairid="149" style="1" owner="e" level="1" amendtag="start">(iv)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="59" style="1" owner="selder" level="1" amendtag="end">two members appointed by the speaker of the House of Representatives.</amend>
            </subsection>
          </subsection>
          <subsection ssid="4-22" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="193" slineno="4-29" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="150" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="63" style="1" owner="selder" level="1" amendtag="end">The office shall provide staff and support to the authority.</amend>
          </subsection>
        </subsection>
        <subsection ssid="4-23" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="194" slineno="4-30" dnum="_-e:4-e">
          <display>
            <amend anum="0" ea="amend" pairid="151" style="1" owner="e" level="1" amendtag="start">(4)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="67" style="1" owner="selder" level="1" amendtag="end">The authority shall:</amend>
          <subsection ssid="4-24" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="195" slineno="4-31" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="152" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="69" style="1" owner="selder" level="1" amendtag="end">provide recommendations to the governor and Legislature regarding the state  
              <ln numlevel="1" lineno="196" slineno="4-32"/>exercising an option to purchase an asset intended for decommissioning;
            </amend>
          </subsection>
          <subsection ssid="4-25" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="197" slineno="4-33" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="153" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="72" style="1" owner="selder" level="1" amendtag="end">if the state exercises an option to purchase the asset intended for decommissioning  
              <ln numlevel="1" lineno="198" slineno="4-34"/>under Section  
              <xref depth="3" refnumber="11-13-318">11-13-318</xref>:
            </amend>
            <subsection ssid="4-26" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="199" slineno="4-35" dnum="_-e:i-e">
              <display>
                <amend anum="0" ea="amend" pairid="154" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="74" style="1" owner="selder" level="1" amendtag="end">enter into contracts and agreements related to the decommissioned asset;</amend>
            </subsection>
            <subsection ssid="4-27" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="200" slineno="4-36" dnum="_-e:ii-e">
              <display>
                <amend anum="0" ea="amend" pairid="155" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="77" style="1" owner="selder" level="1" amendtag="end">govern the disposition of assets intended for decommissioning as outlined in  
                <ln numlevel="1" lineno="201" slineno="4-37"/>Subsection (5); and
              </amend>
            </subsection>
            <subsection ssid="4-28" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="202" slineno="4-38" dnum="_-e:iii-e">
              <display>
                <amend anum="0" ea="amend" pairid="156" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="80" style="1" owner="selder" level="1" amendtag="end">take any other action necessary for governance of a decommissioned asset  
                <ln numlevel="1" lineno="203" slineno="4-39"/>purchased by the state; and
              </amend>
            </subsection>
          </subsection>
          <subsection ssid="4-29" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="204" slineno="4-40" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="157" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="84" style="1" owner="selder" level="1" amendtag="end">contract with independent professionals that have expertise in emissions modeling,  
              <ln numlevel="1" lineno="205" slineno="4-41"/>air quality impact assessments, regulatory compliance, and any other discipline  
              <ln numlevel="1" lineno="206" slineno="4-42"/>necessary for the preparation and submission of a complete alternative air permit  
              <ln numlevel="1" lineno="207" slineno="4-43"/>application, including:
            </amend>
            <subsection ssid="4-30" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="208" slineno="4-44" dnum="_-e:i-e">
              <display>
                <amend anum="0" ea="amend" pairid="158" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="86" style="1" owner="selder" level="1" amendtag="end">conducting emissions modeling, air quality impact assessments, and gathering any  
                <ln numlevel="1" lineno="209" slineno="4-45"/>other information necessary for inclusion in a complete alternative air permit  
                <ln numlevel="1" lineno="210" slineno="4-46"/>application;
              </amend>
            </subsection>
            <subsection ssid="4-31" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="211" slineno="4-47" dnum="_-e:ii-e">
              <display>
                <amend anum="0" ea="amend" pairid="159" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="89" style="1" owner="selder" level="1" amendtag="end">preparing the full application with all necessary information included, as would  
                <ln numlevel="1" lineno="212" slineno="4-48"/>be required for an application submitted by the owner of the electrical generation  
                <ln numlevel="1" lineno="213" slineno="4-49"/>facility; and
              </amend>
            </subsection>
            <subsection ssid="4-32" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="214" slineno="4-50" dnum="_-e:iii-e">
              <display>
                <amend anum="0" ea="amend" pairid="160" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="92" style="1" owner="selder" level="1" amendtag="end">submitting the full permit application to the Division of Air Quality.</amend>
            </subsection>
          </subsection>
        </subsection>
        <subsection ssid="4-33" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="215" slineno="4-51" dnum="_-e:5-e">
          <display>
            <amend anum="0" ea="amend" pairid="161" style="1" owner="e" level="1" amendtag="start">(5)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="97" style="1" owner="selder" level="1" amendtag="end">If the state exercises an option to purchase or otherwise take control of the asset  
            <ln numlevel="1" lineno="216" slineno="4-52"/>intended for decommissioning under Section  
            <xref depth="3" refnumber="11-13-318">11-13-318</xref>, the authority may, no sooner  
            <ln numlevel="1" lineno="217" slineno="4-53"/>than July 2, 2025:
          </amend>
          <subsection ssid="4-34" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="218" slineno="4-54" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="162" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="99" style="1" owner="selder" level="1" amendtag="end">hold a public hearing to receive comment and evidence regarding:</amend>
            <subsection ssid="4-35" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="219" slineno="4-55" dnum="_-e:i-e">
              <display>
                <amend anum="0" ea="amend" pairid="163" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="101" style="1" owner="selder" level="1" amendtag="end">the fair market value of the asset, including the valuation study conducted by the  
                <ln numlevel="1" lineno="220" slineno="4-56"/>authority under Section  
                <xref depth="3" refnumber="79-6-405">79-6-405</xref>; and
              </amend>
            </subsection>
            <subsection ssid="4-36" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="221" slineno="4-57" dnum="_-e:ii-e">
              <display>
                <amend anum="0" ea="amend" pairid="164" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="104" style="1" owner="selder" level="1" amendtag="end">the proposed disposition of the decommissioned asset;</amend>
            </subsection>
          </subsection>
          <subsection ssid="4-37" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="222" slineno="4-58" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="165" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="108" style="1" owner="selder" level="1" amendtag="end">establish procedures and timelines for potential purchasers to submit binding  
              <ln numlevel="1" lineno="223" slineno="4-59"/>purchase offers;
            </amend>
          </subsection>
          <subsection ssid="4-38" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="224" slineno="4-60" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="166" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="111" style="1" owner="selder" level="1" amendtag="end">evaluate all purchase offers to determine the highest and best purchase offer;</amend>
          </subsection>
          <subsection ssid="4-39" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="225" slineno="4-61" dnum="_-e:d-e">
            <display>
              <amend anum="0" ea="amend" pairid="167" style="1" owner="e" level="1" amendtag="start">(d)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="114" style="1" owner="selder" level="1" amendtag="end">approve the sale of the decommissioned asset to the purchaser that has submitted the  
              <ln numlevel="1" lineno="226" slineno="4-62"/>highest and best purchase offer; and
            </amend>
          </subsection>
          <subsection ssid="4-40" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="227" slineno="4-63" dnum="_-e:e-e">
            <display>
              <amend anum="0" ea="amend" pairid="168" style="1" owner="e" level="1" amendtag="start">(e)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="117" style="1" owner="selder" level="1" amendtag="end">take any other action necessary to govern the disposition of the decommissioned  
              <ln numlevel="1" lineno="228" slineno="4-64"/>asset in accordance with this section.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="4-41" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="229" slineno="4-65" dnum="_-e:6-e">
          <display>
            <amend anum="0" ea="amend" pairid="169" style="1" owner="e" level="1" amendtag="start">(6)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="121" style="1" owner="selder" level="1" amendtag="end">In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the  
            <ln numlevel="1" lineno="230" slineno="4-66"/>authority shall make rules that establish:
          </amend>
          <subsection ssid="4-42" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="231" slineno="4-67" dnum="_-e:a-e">
            <display>
              <amend anum="0" ea="amend" pairid="170" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="123" style="1" owner="selder" level="1" amendtag="end">procedures and associated timelines for potential purchasers to submit binding  
              <ln numlevel="1" lineno="232" slineno="4-68"/>purchase offers for a decommissioned asset;
            </amend>
          </subsection>
          <subsection ssid="4-43" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="233" slineno="4-69" dnum="_-e:b-e">
            <display>
              <amend anum="0" ea="amend" pairid="171" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="126" style="1" owner="selder" level="1" amendtag="end">objective criteria and a process to evaluate all purchase offers submitted for a  
              <ln numlevel="1" lineno="234" slineno="4-70"/>decommissioned asset and determine which purchase offer is the highest and best  
              <ln numlevel="1" lineno="235" slineno="4-71"/>offer; and
            </amend>
          </subsection>
          <subsection ssid="4-44" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="236" slineno="4-72" dnum="_-e:c-e">
            <display>
              <amend anum="0" ea="amend" pairid="172" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="129" style="1" owner="selder" level="1" amendtag="end">a process for the authority to approve the sale of a decommissioned asset to the  
              <ln numlevel="1" lineno="237" slineno="4-73"/>purchaser that has submitted the highest and best purchase offer.
            </amend>
          </subsection>
        </subsection>
      </section>
    </bsec>
    <bsec buid="5" type="enact" src="code" num="79-6-405" uid="C79-6-S405_2024050120240501" sort="79 06 04050020240501" numlevel="1" lineno="238" slineno="5-1" sn="5">
      <section number="79-6-405" numlevel="1" lineno="239" slineno="5-2" type="enact">
        <secline lineno="238">Section 5, Section  
          <bold>79-6-405</bold> is enacted to read:
        </secline>
        <catline lineno="239">
          <bold>79-6-405. Study of project entity asset intended for decommissioning.</bold>
        </catline>
        <subsection ssid="5-1" dnum="_-o:1-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="240" slineno="5-3" placement="noreturn">
          <display>
            <amend anum="0" ea="amend" pairid="137" style="1" owner="e" level="1" amendtag="start">(1)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="2" style="1" owner="selder" level="1" amendtag="end">As used in this section:</amend>
          <subsection ssid="5-2" dnum="_-o:a-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="241" slineno="5-4">
            <display>
              <amend anum="0" ea="amend" pairid="138" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="4" style="1" owner="selder" level="1" amendtag="end">"Authority" means the Decommissioned Asset Disposition Authority, created in  
              <ln numlevel="1" lineno="242" slineno="5-5"/>Section  
              <xref depth="3" refnumber="79-6-404">79-6-404</xref>.
            </amend>
          </subsection>
          <subsection ssid="5-3" dnum="_-o:b-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="243" slineno="5-6">
            <display>
              <amend anum="0" ea="amend" pairid="139" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="7" style="1" owner="selder" level="1" amendtag="end">"Fair market value" means the same as that term is defined in Section  
              <xref depth="3" refnumber="79-6-404">79-6-404</xref>.
            </amend>
          </subsection>
        </subsection>
        <subsection ssid="5-4" dnum="_-o:2-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="244" slineno="5-7">
          <display>
            <amend anum="0" ea="amend" pairid="140" style="1" owner="e" level="1" amendtag="start">(2)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="11" style="1" owner="selder" level="1" amendtag="end">The authority, in consultation with the office, shall conduct a study to:</amend>
          <subsection ssid="5-5" dnum="_-o:a-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="245" slineno="5-8">
            <display>
              <amend anum="0" ea="amend" pairid="141" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="13" style="1" owner="selder" level="1" amendtag="end">evaluate issues in regards to a state implementation plan as a result of issuing an  
              <ln numlevel="1" lineno="246" slineno="5-9"/>alternative permit under Section  
              <xref depth="3" refnumber="19-2-109.4">19-2-109.4</xref>;
            </amend>
          </subsection>
          <subsection ssid="5-6" dnum="_-o:b-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="247" slineno="5-10">
            <display>
              <amend anum="0" ea="amend" pairid="142" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="16" style="1" owner="selder" level="1" amendtag="end">establish the fair market value of an electrical generation facility that a project entity  
              <ln numlevel="1" lineno="248" slineno="5-11"/>intends to decommission; and
            </amend>
          </subsection>
          <subsection ssid="5-7" dnum="_-o:c-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="249" slineno="5-12">
            <display>
              <amend anum="0" ea="amend" pairid="143" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="19" style="1" owner="selder" level="1" amendtag="end">evaluate the potential sale of the facility to new owners.</amend>
          </subsection>
        </subsection>
        <subsection ssid="5-8" dnum="_-o:3-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="250" slineno="5-13">
          <display>
            <amend anum="0" ea="amend" pairid="144" style="1" owner="e" level="1" amendtag="start">(3)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="23" style="1" owner="selder" level="1" amendtag="end">In conducting the study described in this section, the authority shall contract or consult  
            <ln numlevel="1" lineno="251" slineno="5-14"/>with independent professionals with expertise in:
          </amend>
          <subsection ssid="5-9" dnum="_-o:a-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="252" slineno="5-15">
            <display>
              <amend anum="0" ea="amend" pairid="145" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="25" style="1" owner="selder" level="1" amendtag="end">areas relevant to environmental regulatory compliance and clean air act state  
              <ln numlevel="1" lineno="253" slineno="5-16"/>implementation plan development, including:
            </amend>
            <subsection ssid="5-10" dnum="_-o:i-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="254" slineno="5-17">
              <display>
                <amend anum="0" ea="amend" pairid="146" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="27" style="1" owner="selder" level="1" amendtag="end">related electric generation capacity;</amend>
            </subsection>
            <subsection ssid="5-11" dnum="_-o:ii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="255" slineno="5-18">
              <display>
                <amend anum="0" ea="amend" pairid="147" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="30" style="1" owner="selder" level="1" amendtag="end">resource adequacy; and</amend>
            </subsection>
            <subsection ssid="5-12" dnum="_-o:iii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="256" slineno="5-19">
              <display>
                <amend anum="0" ea="amend" pairid="148" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="33" style="1" owner="selder" level="1" amendtag="end">economic development considerations; and</amend>
            </subsection>
          </subsection>
          <subsection ssid="5-13" dnum="_-o:b-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="257" slineno="5-20">
            <display>
              <amend anum="0" ea="amend" pairid="149" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="37" style="1" owner="selder" level="1" amendtag="end">areas relevant to the valuation and disposition of electrical generation facilities,  
              <ln numlevel="1" lineno="258" slineno="5-21"/>including:
            </amend>
            <subsection ssid="5-14" dnum="_-o:i-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="259" slineno="5-22">
              <display>
                <amend anum="0" ea="amend" pairid="150" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="39" style="1" owner="selder" level="1" amendtag="end">engineering;</amend>
            </subsection>
            <subsection ssid="5-15" dnum="_-o:ii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="260" slineno="5-23">
              <display>
                <amend anum="0" ea="amend" pairid="151" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="42" style="1" owner="selder" level="1" amendtag="end">environmental assessments;</amend>
            </subsection>
            <subsection ssid="5-16" dnum="_-o:iii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="261" slineno="5-24">
              <display>
                <amend anum="0" ea="amend" pairid="152" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="45" style="1" owner="selder" level="1" amendtag="end">energy economics;</amend>
            </subsection>
            <subsection ssid="5-17" dnum="_-o:iv-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="262" slineno="5-25">
              <display>
                <amend anum="0" ea="amend" pairid="153" style="1" owner="e" level="1" amendtag="start">(iv)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="48" style="1" owner="selder" level="1" amendtag="end">water rights;</amend>
            </subsection>
            <subsection ssid="5-18" dnum="_-o:v-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="263" slineno="5-26">
              <display>
                <amend anum="0" ea="amend" pairid="154" style="1" owner="e" level="1" amendtag="start">(v)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="51" style="1" owner="selder" level="1" amendtag="end">mineral rights;</amend>
            </subsection>
            <subsection ssid="5-19" dnum="_-o:vi-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="264" slineno="5-27">
              <display>
                <amend anum="0" ea="amend" pairid="155" style="1" owner="e" level="1" amendtag="start">(vi)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="54" style="1" owner="selder" level="1" amendtag="end">regulatory analysis;</amend>
            </subsection>
            <subsection ssid="5-20" dnum="_-o:vii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="265" slineno="5-28">
              <display>
                <amend anum="0" ea="amend" pairid="156" style="1" owner="e" level="1" amendtag="start">(vii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="57" style="1" owner="selder" level="1" amendtag="end">financial analysis;</amend>
            </subsection>
            <subsection ssid="5-21" dnum="_-o:viii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="266" slineno="5-29">
              <display>
                <amend anum="0" ea="amend" pairid="157" style="1" owner="e" level="1" amendtag="start">(viii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="60" style="1" owner="selder" level="1" amendtag="end">real estate valuation; and</amend>
            </subsection>
            <subsection ssid="5-22" dnum="_-o:ix-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="267" slineno="5-30">
              <display>
                <amend anum="0" ea="amend" pairid="158" style="1" owner="e" level="1" amendtag="start">(ix)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="63" style="1" owner="selder" level="1" amendtag="end">legal analysis.</amend>
            </subsection>
          </subsection>
        </subsection>
        <subsection ssid="5-23" dnum="_-o:4-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="268" slineno="5-31">
          <display>
            <amend anum="0" ea="amend" pairid="159" style="1" owner="e" level="1" amendtag="start">(4)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="68" style="1" owner="selder" level="1" amendtag="end">The study described in Subsection (2) shall:</amend>
          <subsection ssid="5-24" dnum="_-o:a-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="269" slineno="5-32">
            <display>
              <amend anum="0" ea="amend" pairid="160" style="1" owner="e" level="1" amendtag="start">(a)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="70" style="1" owner="selder" level="1" amendtag="end">for the evaluation of issues in regards to a state implementation plan as a result of  
              <ln numlevel="1" lineno="270" slineno="5-33"/>issuing an alternative permit under Section  
              <xref depth="3" refnumber="19-2-109.4">19-2-109.4</xref>, based on input from the  
              <ln numlevel="1" lineno="271" slineno="5-34"/>Division of Air Quality and independent modeling, legal analysis, and economic  
              <ln numlevel="1" lineno="272" slineno="5-35"/>analysis, evaluate:
            </amend>
            <subsection ssid="5-25" dnum="_-o:i-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="273" slineno="5-36">
              <display>
                <amend anum="0" ea="amend" pairid="161" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="72" style="1" owner="selder" level="1" amendtag="end">any technical deficiencies that could occur in a state implementation plan as a  
                <ln numlevel="1" lineno="274" slineno="5-37"/>result of issuing an alternative permit; and
              </amend>
            </subsection>
            <subsection ssid="5-26" dnum="_-o:ii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="275" slineno="5-38">
              <display>
                <amend anum="0" ea="amend" pairid="162" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="75" style="1" owner="selder" level="1" amendtag="end">options for revising the state implementation plan to maximize flexibility for the  
                <ln numlevel="1" lineno="276" slineno="5-39"/>state to utilize an alternative permit and preserve electric generating capacity  
                <ln numlevel="1" lineno="277" slineno="5-40"/>sufficient to support economic growth in the state while ensuring the state  
                <ln numlevel="1" lineno="278" slineno="5-41"/>implementation plan meets federal air quality standards;
              </amend>
            </subsection>
          </subsection>
          <subsection ssid="5-27" dnum="_-o:b-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="279" slineno="5-42">
            <display>
              <amend anum="0" ea="amend" pairid="163" style="1" owner="e" level="1" amendtag="start">(b)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="79" style="1" owner="selder" level="1" amendtag="end">for the valuation of the project entity asset that a project entity intends to  
              <ln numlevel="1" lineno="280" slineno="5-43"/>decommission, include:
            </amend>
            <subsection ssid="5-28" dnum="_-o:i-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="281" slineno="5-44">
              <display>
                <amend anum="0" ea="amend" pairid="164" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="81" style="1" owner="selder" level="1" amendtag="end">an assessment of all assets associated with the electrical generation facility,  
                <ln numlevel="1" lineno="282" slineno="5-45"/>including real property, equipment, water rights, mineral rights, and any other  
                <ln numlevel="1" lineno="283" slineno="5-46"/>associated assets;
              </amend>
            </subsection>
            <subsection ssid="5-29" dnum="_-o:ii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="284" slineno="5-47">
              <display>
                <amend anum="0" ea="amend" pairid="165" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="84" style="1" owner="selder" level="1" amendtag="end">an assessment of all financial assets and potential financial liabilities or risks  
                <ln numlevel="1" lineno="285" slineno="5-48"/>related to the electrical generation facility intended for decommissioning;
              </amend>
            </subsection>
            <subsection ssid="5-30" dnum="_-o:iii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="286" slineno="5-49">
              <display>
                <amend anum="0" ea="amend" pairid="166" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="87" style="1" owner="selder" level="1" amendtag="end">an analysis of any encumbrances on the electrical generation facility;</amend>
            </subsection>
            <subsection ssid="5-31" dnum="_-o:iv-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="287" slineno="5-50">
              <display>
                <amend anum="0" ea="amend" pairid="167" style="1" owner="e" level="1" amendtag="start">(iv)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="90" style="1" owner="selder" level="1" amendtag="end">the impact on valuation of an electrical generation facility related to the issuance  
                <ln numlevel="1" lineno="288" slineno="5-51"/>of an alternative air quality permit under Section  
                <xref depth="3" refnumber="19-2-109.4">19-2-109.4</xref>;
              </amend>
            </subsection>
            <subsection ssid="5-32" dnum="_-o:v-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="289" slineno="5-52">
              <display>
                <amend anum="0" ea="amend" pairid="168" style="1" owner="e" level="1" amendtag="start">(v)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="93" style="1" owner="selder" level="1" amendtag="end">a review of any potential effect a sale of the electrical generation facility would  
                <ln numlevel="1" lineno="290" slineno="5-53"/>have on liabilities related to the electrical generation facility;
              </amend>
            </subsection>
            <subsection ssid="5-33" dnum="_-o:vi-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="291" slineno="5-54">
              <display>
                <amend anum="0" ea="amend" pairid="169" style="1" owner="e" level="1" amendtag="start">(vi)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="96" style="1" owner="selder" level="1" amendtag="end">incorporation of any relevant local, regional, or national economic and market  
                <ln numlevel="1" lineno="292" slineno="5-55"/>factors that may impact the fair market value; and
              </amend>
            </subsection>
            <subsection ssid="5-34" dnum="_-o:vii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="293" slineno="5-56">
              <display>
                <amend anum="0" ea="amend" pairid="170" style="1" owner="e" level="1" amendtag="start">(vii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="99" style="1" owner="selder" level="1" amendtag="end">any other factors the authority considers relevant in establishing a fair market  
                <ln numlevel="1" lineno="294" slineno="5-57"/>value for the electrical generation facility; and
              </amend>
            </subsection>
          </subsection>
          <subsection ssid="5-35" dnum="_-o:c-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="295" slineno="5-58">
            <display>
              <amend anum="0" ea="amend" pairid="171" style="1" owner="e" level="1" amendtag="start">(c)</amend>
            </display>
            <amend anum="0" ea="amend" pairid="103" style="1" owner="selder" level="1" amendtag="end">to evaluate the issues surrounding a potential sale of the facility, include:</amend>
            <subsection ssid="5-36" dnum="_-o:i-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="296" slineno="5-59">
              <display>
                <amend anum="0" ea="amend" pairid="172" style="1" owner="e" level="1" amendtag="start">(i)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="105" style="1" owner="selder" level="1" amendtag="end">potential purchase and sale agreement terms;</amend>
            </subsection>
            <subsection ssid="5-37" dnum="_-o:ii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="297" slineno="5-60">
              <display>
                <amend anum="0" ea="amend" pairid="173" style="1" owner="e" level="1" amendtag="start">(ii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="108" style="1" owner="selder" level="1" amendtag="end">the necessary financial capability of a potential purchaser, including experience  
                <ln numlevel="1" lineno="298" slineno="5-61"/>raising capital, access to capital, financial stability, and ability to provide security  
                <ln numlevel="1" lineno="299" slineno="5-62"/>for obligations related to decommissioning, remediation, and other liabilities;
              </amend>
            </subsection>
            <subsection ssid="5-38" dnum="_-o:iii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="300" slineno="5-63">
              <display>
                <amend anum="0" ea="amend" pairid="174" style="1" owner="e" level="1" amendtag="start">(iii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="111" style="1" owner="selder" level="1" amendtag="end">operational experience and capability of a potential purchaser, including  
                <ln numlevel="1" lineno="301" slineno="5-64"/>experience operating electrical generation facilities, contracting history, and  
                <ln numlevel="1" lineno="302" slineno="5-65"/>historical operating metrics;
              </amend>
            </subsection>
            <subsection ssid="5-39" dnum="_-o:iv-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="303" slineno="5-66">
              <display>
                <amend anum="0" ea="amend" pairid="175" style="1" owner="e" level="1" amendtag="start">(iv)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="114" style="1" owner="selder" level="1" amendtag="end">permitting, regulatory compliance, and construction issues for continued  
                <ln numlevel="1" lineno="304" slineno="5-67"/>operation of the facility;
              </amend>
            </subsection>
            <subsection ssid="5-40" dnum="_-o:v-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="305" slineno="5-68">
              <display>
                <amend anum="0" ea="amend" pairid="176" style="1" owner="e" level="1" amendtag="start">(v)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="117" style="1" owner="selder" level="1" amendtag="end">the likelihood that continued operation of the facility would impact other  
                <ln numlevel="1" lineno="306" slineno="5-69"/>electrical generation facilities in the state;
              </amend>
            </subsection>
            <subsection ssid="5-41" dnum="_-o:vi-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="307" slineno="5-70">
              <display>
                <amend anum="0" ea="amend" pairid="177" style="1" owner="e" level="1" amendtag="start">(vi)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="120" style="1" owner="selder" level="1" amendtag="end">the potential for continued operation of the facility to infringe on existing utility  
                <ln numlevel="1" lineno="308" slineno="5-71"/>service territories;
              </amend>
            </subsection>
            <subsection ssid="5-42" dnum="_-o:vii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="309" slineno="5-72">
              <display>
                <amend anum="0" ea="amend" pairid="178" style="1" owner="e" level="1" amendtag="start">(vii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="123" style="1" owner="selder" level="1" amendtag="end">the viability of alternative business models for continued operation of the  
                <ln numlevel="1" lineno="310" slineno="5-73"/>facility;
              </amend>
            </subsection>
            <subsection ssid="5-43" dnum="_-o:viii-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="311" slineno="5-74">
              <display>
                <amend anum="0" ea="amend" pairid="179" style="1" owner="e" level="1" amendtag="start">(viii)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="126" style="1" owner="selder" level="1" amendtag="end">potential community and regional impacts resulting from continued operation  
                <ln numlevel="1" lineno="312" slineno="5-75"/>or the retirement of the facility; and
              </amend>
            </subsection>
            <subsection ssid="5-44" dnum="_-o:ix-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="313" slineno="5-76">
              <display>
                <amend anum="0" ea="amend" pairid="180" style="1" owner="e" level="1" amendtag="start">(ix)</amend>
              </display>
              <amend anum="0" ea="amend" pairid="129" style="1" owner="selder" level="1" amendtag="end">the potential for continued operation of the facility to interfere with the rights and  
                <ln numlevel="1" lineno="314" slineno="5-77"/>interests of the project entity, the project entity's members, power purchasers,  
                <ln numlevel="1" lineno="315" slineno="5-78"/>bondholders, creditors, or other entities.
              </amend>
            </subsection>
          </subsection>
        </subsection>
        <subsection ssid="5-45" dnum="_-o:5-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="316" slineno="5-79">
          <display>
            <amend anum="0" ea="amend" pairid="181" style="1" owner="e" level="1" amendtag="start">(5)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="134" style="1" owner="selder" level="1" amendtag="end">In conducting the study described in Subsection (2), the project entity shall timely  
            <ln numlevel="1" lineno="317" slineno="5-80"/>provide to the authority information related to the assets and potential liabilities of the  
            <ln numlevel="1" lineno="318" slineno="5-81"/>electrical generation facility intended for decommissioning.
          </amend>
        </subsection>
        <subsection ssid="5-46" dnum="_-o:6-e" ea="amend" anum="0" owner="selder" style="1" numlevel="1" lineno="319" slineno="5-82">
          <display>
            <amend anum="0" ea="amend" pairid="182" style="1" owner="e" level="1" amendtag="start">(6)</amend>
          </display>
          <amend anum="0" ea="amend" pairid="137" style="1" owner="selder" level="1" amendtag="end">The authority shall report the progress and results of the study to the Public Utilities,  
            <ln numlevel="1" lineno="320" slineno="5-83"/>Energy, and Technology Interim Committee on or before November 30, 2024.
          </amend>
        </subsection>
      </section>
    </bsec>
    <bsec buid="6" type="uncod" untype="effdate" src="uncod" uid="EF0000" sort="UZEFF" numlevel="1" lineno="321" slineno="6-1" sn="6">
      <section type="uncod" untype="effdate" display="false" src="uncod">
        <secline lineno="321">Section 6.   
          <bold>Effective date.</bold>
        </secline>
        <sectionText lineno="322">
          <amend anum="0" ea="amend" pairid="1" style="1" owner="selder" level="1" amendtag="both">
            <tab/>This bill takes effect on May 1, 2024.
          </amend>
        </sectionText>
      </section>
    </bsec>
  </bdy>
  <foot>
    <rev/>
  </foot>
</leg>
