H.B. 7

             1     

NET METERING OF ELECTRICITY

             2     
2002 GENERAL SESSION

             3     
STATE OF UTAH

             4     
Sponsor: Gordon E. Snow

             5      This act modifies provisions relating to public utilities by enacting provisions relating to net
             6      metering. This act requires electrical corporations to make a net metering program
             7      available to customers by which customers may establish an inverter controlled customer
             8      generation system to produce electricity for their own use and to supply excess electricity to
             9      the electrical corporation. The act requires the electrical corporation to offset charges for
             10      electricity by the amount of electricity supplied by a customer from a customer generation
             11      system and requires the electrical corporation to give the customer a credit for electricity
             12      generated by the customer that exceeds the amount supplied by the electrical corporation.
             13      The act requires the customer to meet certain safety and other requirements with respect to
             14      a customer generation system. The act prohibits the electrical corporation from imposing
             15      additional charges or fees to customers participating in a net metering program unless
             16      authorized.
             17      This act affects sections of Utah Code Annotated 1953 as follows:
             18      ENACTS:
             19          54-15-101, Utah Code Annotated 1953
             20          54-15-102, Utah Code Annotated 1953
             21          54-15-103, Utah Code Annotated 1953
             22          54-15-104, Utah Code Annotated 1953
             23          54-15-105, Utah Code Annotated 1953
             24          54-15-106, Utah Code Annotated 1953
             25      Be it enacted by the Legislature of the state of Utah:
             26          Section 1. Section 54-15-101 is enacted to read:
             27     
CHAPTER 15. NET METERING OF ELECTRICITY


             28          54-15-101. Title.
             29          This chapter is known as "Net Metering of Electricity."
             30          Section 2. Section 54-15-102 is enacted to read:
             31          54-15-102. Definitions.
             32          As used in this chapter:
             33          (1) "Customer-generated electricity" means electricity that:
             34          (a) is generated by a customer participating in a net metering program from a customer
             35      generation system;
             36          (b) exceeds the electricity the customer needs for the customer's own use; and
             37          (c) is supplied to the electrical corporation administering the net metering program.
             38          (2) "Customer generation system" means a fuel cell or renewable facility that:
             39          (a) has a generating capacity of not more than 25 kilowatts;
             40          (b) is located on the premises of the electrical corporation's customer;
             41          (c) operates in parallel and is interconnected with the electrical corporation's transmission
             42      and distribution facilities;
             43          (d) is intended primarily to offset part or all of the customer's requirements for electricity;
             44      and
             45          (e) is controlled by an inverter.
             46          (3) "Excess customer-generated electricity" means the amount of customer-generated
             47      electricity during a billing period that exceeds the amount of electricity that an electrical
             48      corporation supplies to the customer during that billing period.
             49          (4) "Fuel cell" means a device in which the energy of a reaction between a fuel and an
             50      oxidant is converted directly and continuously into electrical energy.
             51          (5) "Governing authority" means:
             52          (a) for a distribution electrical cooperative, its board of directors; and
             53          (b) for each other electrical corporation, the commission.
             54          (6) "Inverter" means a device that:
             55          (a) converts direct current power into alternating current power that is compatible with
             56      power generated by an electrical corporation; and
             57          (b) has been designed, tested, and UL certified to UL1741 and IEEE929 standards.
             58          (7) "Net electricity" means the difference between:


             59          (a) the amount of electricity that an electrical corporation supplies to a customer
             60      participating in a net metering program; and
             61          (b) the amount of customer-generated electricity.
             62          (8) "Net metering" means measuring for the applicable billing period the difference
             63      between:
             64          (a) the amount of electricity that an electrical corporation supplies to a customer
             65      participating in a net metering program; and
             66          (b) the amount of customer-generated electricity.
             67          (9) "Net metering program" means a program administered by a electrical corporation
             68      whereby a customer with a customer generation system may:
             69          (a) generate electricity primarily for the customer's own use;
             70          (b) supply customer-generated electricity to the electrical corporation; and
             71          (c) if net metering results in excess customer-generated electricity during a billing period,
             72      receive a credit against the cost of electricity supplied by the electrical corporation to the customer
             73      within the same calendar year.
             74          (10) "Renewable facility" means a facility that uses energy derived from the sun, wind, or
             75      water to generate electricity.
             76          Section 3. Section 54-15-103 is enacted to read:
             77          54-15-103. Net metering program.
             78          (1) Each electrical corporation shall:
             79          (a) except as provided in Subsection (2), make a net metering program available to the
             80      electrical corporation's customers; and
             81          (b) allow customer generation systems to be interconnected to the electrical corporation's
             82      facilities using, except as provided in Subsection (3), a standard kilowatt-hour meter capable of
             83      net metering.
             84          (2) An electrical corporation may discontinue making a net metering program available
             85      to customers not already participating in the program as long as:
             86          (a) the cumulative generating capacity of customer generation systems in the program
             87      equals at least .1% of the electrical corporation's peak demand during 2001; and
             88          (b) at least half of the electricity representing the .1% figure in Subsection (2)(a) is
             89      generated by renewable facilities.


             90          (3) (a) Notwithstanding Subsection (1)(b), an electrical corporation may require a customer
             91      participating in the electrical corporation's net metering program to use metering equipment other
             92      than a standard kilowatt-hour meter if the commission, after appropriate notice and opportunity
             93      for comment:
             94          (i) determines that the use of other metering equipment is necessary and appropriate to
             95      monitor the flow of electricity from and to the electrical corporation; and
             96          (ii) approves the requirement for other metering equipment, after considering the benefits
             97      and costs associated with the other metering equipment.
             98          (b) If the commission approves the requirement for other metering equipment under
             99      Subsection (3)(a), the governing authority shall determine how the cost of purchasing and
             100      installing the other metering equipment is to be allocated between the electrical corporation and
             101      the customer.
             102          (4) An electrical corporation may require a customer to enter into an interconnection
             103      agreement before connecting the customer generation system to the electrical corporation's
             104      facilities.
             105          Section 4. Section 54-15-104 is enacted to read:
             106          54-15-104. Charges or credits for net electricity.
             107          (1) Each electrical corporation with a customer participating in a net metering program
             108      shall measure net electricity during each billing period, in accordance with normal metering
             109      practices.
             110          (2) If net metering does not result in excess customer-generated electricity during the
             111      billing period, the electrical corporation shall bill the customer for the net electricity, in accordance
             112      with normal billing practices.
             113          (3) If net metering results in excess customer-generated electricity during the billing
             114      period:
             115          (a) (i) the electrical corporation shall credit the customer for the excess customer-generated
             116      electricity at a value that is at least avoided cost;
             117          (ii) the customer may use the credit under Subsection (3)(a)(i) to offset purchases of
             118      electricity from the electrical corporation during future billing periods during the same calendar
             119      year; and
             120          (iii) all credits that the customer does not use during the calendar year expire at the end


             121      of the calendar year; and
             122          (b) the electrical corporation may bill the customer for customer charges that otherwise
             123      would have accrued during that billing period in the absence of excess customer-generated
             124      electricity.
             125          Section 5. Section 54-15-105 is enacted to read:
             126          54-15-105. No additional fee or charge without commission approval -- Exception.
             127          (1) An electrical corporation administering a net metering program may not charge a
             128      customer participating in the program an additional standby, capacity, interconnection, or other fee
             129      or charge unless the governing authority, after appropriate notice and opportunity for comment:
             130          (a) determines that:
             131          (i) the electrical corporation will incur direct costs from the interconnection or from
             132      administering the net metering program that exceed benefits, as determined by the governing
             133      authority, resulting from the program; and
             134          (ii) public policy is best served by imposing the fee or charge on the customer participating
             135      in the net metering program rather than by allocating the fee or charge among the electrical
             136      corporation's entire customer base; and
             137          (b) after making its determination under Subsection (1)(a), authorizes the additional fee
             138      or charge.
             139          (2) If a cost of a net metering program is allocated among the electrical corporation's entire
             140      customer base, Subsection (1) may not be construed to prohibit an electrical corporation from
             141      charging a customer participating in the net metering program for that cost to the same extent that
             142      the electrical corporation charges a customer not participating in the program for that cost.
             143          Section 6. Section 54-15-106 is enacted to read:
             144          54-15-106. Customer to provide equipment necessary to meet applicable code
             145      requirements -- Allow for testing and inspection -- Commission may adopt additional
             146      requirements.
             147          (1) Each customer participating in a net metering program shall provide at the customer's
             148      expense all equipment necessary to meet applicable local and national standards regarding
             149      electrical and fire safety, power quality, and interconnection requirements established by the
             150      National Electrical Code, the National Electrical Safety Code, the Institute of Electrical and
             151      Electronics Engineers, and Underwriters Laboratories.


             152          (2) After appropriate notice and opportunity for comment, the commission may by
             153      regulation adopt additional safety, power quality, and interconnection requirements for customer
             154      generation systems that the commission considers to be necessary to protect public safety and
             155      system reliability.
             156          (3) (a) If a customer participating in a net metering program complies with requirements
             157      referred to under Subsection (1) and additional requirements established under Subsection (2), an
             158      electrical corporation may not require that customer to:
             159          (i) perform or pay for additional tests; or
             160          (ii) purchase additional liability insurance.
             161          (b) An electrical corporation may not be held directly or indirectly liable for permitting or
             162      continuing to permit an interconnection of a customer generation system to the electrical
             163      corporation's system or for an act or omission of a customer participating in a net metering
             164      program for loss, injury, or death to a third party.
             165          (4) An electrical corporation may test and inspect an interconnection at times that the
             166      electrical corporation considers necessary to ensure the safety of electrical workers and to preserve
             167      the integrity of the electric power grid.




Legislative Review Note
    as of 9-12-01 1:58 PM


A limited legal review of this legislation raises no obvious constitutional or statutory concerns.

Office of Legislative Research and General Counsel


Committee Note

The Public Utilities and Technology Interim Committee recommended this bill.