Third Substitute S.B. 19

Senator Michael G. Waddoups proposes the following substitute bill:


             1     
UTAH CONSTRUCTION CONTRACTS PROMPT

             2     
PAYMENT ACT

             3     
2002 GENERAL SESSION

             4     
STATE OF UTAH

             5     
Sponsor: Michael G. Waddoups

             6      This act modifies the Commerce and Trade provisions by enacting the Utah Construction
             7      Contracts Prompt Payment Act. The act defines certain terms. It requires progress
             8      payments on certain construction contracts. The act requires the owner to promptly dispute
             9      a billing or estimate with which the owner does not agree and limits the amount that an
             10      owner can withhold from a progress payment. The act requires prompt payment by the
             11      owner upon completion of the work. The act provides for interest on late payments. The act
             12      gives subcontractors the right to notification of progress payments. The act provides for the
             13      awarding of costs and attorneys' fees. The act requires prompt payment by the contractor
             14      to subcontractors and suppliers. The act requires the waiver of mechanics' lien rights by
             15      contractors and subcontractors upon receipt of payment. The act provides for the
             16      interruption of the work on a construction contract without penalty in cases of an
             17      environmental hazard. The act provides for the interruption of work on a construction
             18      contract or the termination of the contract in cases of nonpayment. The act provides an
             19      effective date.
             20      This act affects sections of Utah Code Annotated 1953 as follows:
             21      ENACTS:
             22          13-34-101, Utah Code Annotated 1953
             23          13-34-102, Utah Code Annotated 1953
             24          13-34-103, Utah Code Annotated 1953
             25          13-34-201, Utah Code Annotated 1953


             26          13-34-202, Utah Code Annotated 1953
             27          13-34-203, Utah Code Annotated 1953
             28          13-34-204, Utah Code Annotated 1953
             29          13-34-205, Utah Code Annotated 1953
             30          13-34-206, Utah Code Annotated 1953
             31          13-34-207, Utah Code Annotated 1953
             32          13-34-208, Utah Code Annotated 1953
             33          13-34-209, Utah Code Annotated 1953
             34          13-34-210, Utah Code Annotated 1953
             35          13-34-211, Utah Code Annotated 1953
             36      Be it enacted by the Legislature of the state of Utah:
             37          Section 1. Section 13-34-101 is enacted to read:
             38     
CHAPTER 34. UTAH CONSTRUCTION CONTRACTS PROMPT PAYMENT ACT

             39     
Part 1. General Provisions

             40          13-34-101. Title.
             41          This chapter is known as the "Utah Construction Contracts Prompt Payment Act."
             42          Section 2. Section 13-34-102 is enacted to read:
             43          13-34-102. Definitions.
             44          As used in this chapter:
             45          (1) "Construction contract" means a contract or agreement to provide services, labor, or
             46      materials for the "design-build," construction, installation, alteration, or repair of any building,
             47      structure, or improvement to real property located in Utah.
             48          (2) "Construction project bid documents" means the drawings, specifications, invitation
             49      for bids, request for proposals, or any other written document describing the proposed construction
             50      project that requests the submission of bids or prices for furnishing labor, materials, supplies, or
             51      equipment for construction of the project.
             52          (3) "Contractor" means a person who is or may be awarded a construction contract.
             53          (4) "Owner" means a person holding any legal or equitable title or interest in real property
             54      which is the subject of a construction contract.
             55          (5) "Residence" has the meaning as defined in Section 38-11-102 .
             56          (6) "Subcontractor" means any person engaged by a contractor or another subcontractor


             57      to provide services, labor, or materials for the construction, installation, alteration, or repair of any
             58      building, structure, or improvement to real property located in Utah.
             59          Section 3. Section 13-34-103 is enacted to read:
             60          13-34-103. Scope of chapter.
             61          (1) Where there are any conflicts between the provisions of this chapter with the provisions
             62      of Title 15, Chapter 6, Utah Prompt Payment Act, the provisions of this chapter shall govern.
             63          (2) Except as otherwise provided in Subsection (3), this chapter applies to all construction
             64      contracts entered into on or after July 1, 2002.
             65          (3) This chapter does not apply to a construction contract for the construction of a
             66      residence.
             67          Section 4. Section 13-34-201 is enacted to read:
             68     
Part 2. Prompt Payment

             69          13-34-201. Progress payments to contractor -- Alternate billing cycle -- Lien waivers
             70      -- Extended payment provision.
             71          (1) An owner shall make progress payments as provided in Subsection (2) to a contractor
             72      on a construction contract where the contract performance period exceeds 45 calendar days.
             73          (2) (a) Progress payments shall be made on the basis of an approved billing or estimate of
             74      the work performed and the materials supplied during the preceding monthly billing cycle, or an
             75      alternate billing cycle as stated in the construction contract.
             76          (b) If billings or estimates are to be submitted in other than monthly billing cycles, the
             77      construction project bid documents shall specifically identify the alternate billing cycle in a clear
             78      and conspicuous manner as required in Subsection (3).
             79          (c) Except as provided in Subsection (4), the owner shall make progress payments to the
             80      contractor within ten working days after the date the billing or estimate is approved by the owner
             81      pursuant to Subsection 13-34-202 (1).
             82          (d) If required by the owner, the contractor shall provide waivers of mechanics' or
             83      materialmens' liens from both the contractor and its subcontractors conditioned upon payment for
             84      the work completed and materials supplied. The owner may require that these conditional waivers
             85      of lien be notarized.
             86          (3) (a) A construction contract may provide for a billing cycle other than a monthly billing
             87      cycle if:


             88          (i) the construction project bid documents specifically establish the alternate billing cycle;
             89      and
             90          (ii) the notice requirements of Subsection (3)(b) are satisfied.
             91          (b) Either of the following legends, or language setting forth the alternate billing cycle,
             92      shall appear in a clear and conspicuous manner in the payment section of the construction project
             93      bid documents:
             94          (i) "Notice of alternate billing cycle"
             95          "This contract allows the owner to require billings or estimates to be submitted in billing
             96      cycles other than monthly. Billings or estimates for this contract shall be submitted as follows:
             97      [description of alternate billing cycle]"; or
             98          (ii) "Notice of alternate billing cycle"
             99          "This contract allows the owner to require billings or estimates to be submitted in billing
             100      cycles other than monthly. A written description of the alternate billing cycle applicable to the
             101      project is available from the owner or the owner's designated agent at [telephone number or
             102      address, or both], and the owner or its designated agent shall provide this written description on
             103      request."
             104          (4) An owner may make progress payments and final payment later than ten working days
             105      after the date the billing or estimate is approved by the owner if:
             106          (a) the construction project bid documents in a clear and conspicuous manner specifically
             107      provide for payment to be made on a specified number of days after approval; and
             108          (b) the following legend or language setting forth the specified number of days appears in
             109      a clear and conspicuous manner in the payment section of the construction project bid documents:
             110          "Notice of extended payment provision"
             111          "This contract allows the owner to make payment within _____ days after approval of
             112      billings and estimates."
             113          (5) Notwithstanding Subsections (1) through (4), for a construction project that is
             114      "design-build" or "negotiated" before the development of bid documents, the owner, contractor,
             115      and subcontractor may include the alternate billing cycle and an extended payment provision in
             116      the construction contract rather than in bid documents. At the stage of solicitation of bids based
             117      upon written bid documents, for any part of the construction project, the requirements in this
             118      section for notice of the alternate billing cycle and an extended payment provision shall apply to


             119      the bidding subcontractor. The contractor or subcontractor soliciting the bids shall be solely
             120      responsible for including the notice of alternate billing cycle and an extended payment revision in
             121      the bid documents.
             122          Section 5. Section 13-34-202 is enacted to read:
             123          13-34-202. Approval of billings.
             124          (1) (a) Except as provided in Subsection (3), a billing or estimate shall be considered to
             125      be approved by the owner 14 calendar days after the owner receives the billing or estimate, unless
             126      before that time the owner or the owner's agent delivers to the contractor a written statement
             127      detailing those items in the billing or estimate that are not approved.
             128          (b) An owner may decline to approve a billing or estimate or a portion of a billing or
             129      estimate because of:
             130          (i) unsatisfactory job progress;
             131          (ii) defective construction work or materials which have not been remedied;
             132          (iii) disputed work or materials;
             133          (iv) failure to comply with a material provision of the construction contract;
             134          (v) third-party claims filed or reasonable evidence that a claim will be filed;
             135          (vi) failure of the contractor or a subcontractor to make timely payments for labor,
             136      equipment, or materials;
             137          (vii) loss or damage to the owner or the owner's property attributable to the construction
             138      contract and caused by the contractor;
             139          (viii) reasonable evidence that the construction contract cannot be completed for the
             140      unpaid balance under the construction contract; or
             141          (ix) a reasonable amount for retention as provided in Section 13-8-5 .
             142          (c) The owner is considered to have received the billing or estimate when the billing or
             143      estimate is submitted to any person designated by the owner for the receipt of these submissions
             144      or for review or approval of the billing or estimate.
             145          (2) Except as provided in Section 13-8-5 , an owner may withhold from a progress payment
             146      only an amount that is sufficient to pay the direct expenses the owner reasonably expects to incur
             147      to correct any items set forth in writing pursuant to Subsection (1).
             148          (3) An owner may extend the period within which the billing or estimate is approved if:
             149          (a) the construction project bid documents in a clear and conspicuous manner specifically


             150      provide for an extended time period within which a billing or estimate shall be approved, stating
             151      a specified number of days after the owner has received the billing or estimate; and
             152          (b) the following legend, or language setting forth the specified number of days, appears
             153      in a clear and conspicuous manner in the payment section of the construction project bid
             154      documents:
             155          "Notice of extended certification and approval period provision"
             156          "This contract allows the owner to approve billings and estimates within ______ days after
             157      the billings and estimates are received from the contractor."
             158          (4) Except as provided in Subsection 13-34-201 (4) and in Section 13-8-5 :
             159          (a) when a contractor completes and an owner approves all work under a construction
             160      contract, the owner shall make payment in full on the construction contract within ten working
             161      days after the date of approval;
             162          (b) when a contractor completes and an owner approves all work under a portion of a
             163      construction contract for which the construction contract states a separate price, the owner shall
             164      make payment in full on that portion of the construction contract within ten working days after the
             165      date of approval; and
             166          (c) on construction projects that require a federal agency's final approval or certification,
             167      the owner shall make payment in full on the construction contract within seven working days of
             168      the federal agency's final approval or certification.
             169          (5) Payment is not required under this section unless the contractor provides the owner
             170      with a billing or estimate for the work performed or the material supplied in accordance with the
             171      terms of the construction contract between the parties.
             172          (6) If the owner and contractor on a construction project are a single entity, that entity shall
             173      pay its subcontractors within 20 calendar days after the billing or estimate is approved by the
             174      owner unless the deadlines for approval or for payment have been modified under Subsection (3)
             175      or Subsection 13-34-201 (4).
             176          Section 6. Section 13-34-203 is enacted to read:
             177          13-34-203. Notice of progress payments.
             178          On the written request of a subcontractor, the owner shall notify the subcontractor within
             179      five working days after the issuance of a progress payment or final payment to the contractor under
             180      the construction contract.


             181          Section 7. Section 13-34-204 is enacted to read:
             182          13-34-204. Progress payments to subcontractor or supplier -- Waiver of liens --
             183      Withholdings from a payment.
             184          (1) (a) If a subcontractor has performed in accordance with the provisions of a construction
             185      contract, the contractor shall pay to its subcontractor and the subcontractor shall pay to its
             186      subcontractors, within ten working days of receipt by the contractor or subcontractor, as the case
             187      may be, of each progress payment or final payment, the full amount received for that
             188      subcontractor's work and materials supplied based on work completed or materials supplied under
             189      the subcontract.
             190          (b) Payment is not required under Subsection (1)(a) unless the subcontractor provides to
             191      the contractor or subcontractor with whom it has the contract a billing or invoice for the work
             192      performed or material supplied in compliance with the terms of the construction contract between
             193      the parties.
             194          (c) If required by the other party to a construction contract, each subcontractor shall
             195      provide to the contractor or subcontractor with whom it has the contract a waiver of any
             196      mechanic's or materialman's lien or payment bond claims conditioned upon payment for the work
             197      completed or material supplied. The contractor or subcontractor may require that the conditional
             198      waiver of lien be notarized.
             199          (2) Nothing in this section prevents the contractor or subcontractor, at the time of
             200      application or certification to its owner or contractor, as the case may be, from withholding the
             201      application or certification to the owner or contractor for payment to the subcontractor because of:
             202          (a) unsatisfactory job progress;
             203          (b) defective construction work or materials which have not been remedied;
             204          (c) disputed work or materials;
             205          (d) failure to comply with a material provision of the subcontract;
             206          (e) third-party claims filed or reasonable evidence that a claim will be filed;
             207          (f) failure of the subcontractor to make timely payments for labor, equipment, or materials;
             208          (g) damage to the contractor or another subcontractor or material supplier;
             209          (h) reasonable evidence that the subcontract cannot be completed for the unpaid balance
             210      under the contract; or
             211          (i) a reasonable amount for retention, as provided in Section 13-8-5 , that does not exceed


             212      the actual percentage retained by the owner.
             213          Section 8. Section 13-34-205 is enacted to read:
             214          13-34-205. Payment entitlement -- No waiver.
             215          (1) Notwithstanding any other provision of this chapter, performance by a contractor or
             216      subcontractor in accordance with the provisions of a construction contract entitles the contractor
             217      or subcontractor to payment from the party with whom the contractor or subcontractor contracts
             218      pursuant to the terms of the construction contract.
             219          (2) This chapter shall not waive or alter any rights or claims a contractor or subcontractor
             220      may have arising out of performance of work or supplying of materials pursuant to any
             221      construction contract, including the right to receive prompt and timely progress payments.
             222          Section 9. Section 13-34-206 is enacted to read:
             223          13-34-206. Interruption of work for environmental hazard -- Termination of
             224      contract.
             225          (1) A contractor may interrupt the performance of a construction contract without penalty
             226      or liability for breach of contract if:
             227          (a) any applicable law or rule requires the cessation of work; or
             228          (b) (i) the contractor encounters any hazardous substance or hazardous material which is
             229      required to be removed or contained by any applicable statute or rule; and
             230          (ii) (A) any applicable law or rule prohibits the contractor from proceeding to remove or
             231      contain the hazardous material or hazardous substance unless the contractor is duly licensed and
             232      the contractor is not so licensed; or
             233          (B) the removal or containment of the hazardous material or hazardous substance cannot
             234      be accomplished without a cessation of work and the situation which resulted in the cessation of
             235      work under Subsection (1)(a) was not part of the scope of the work under the construction contract.
             236          (2) A contractor whose work is impaired, impeded, or prohibited under Subsection (1) may
             237      interrupt performance of the construction contract as provided in this section only to the extent of
             238      the area affected by the hazardous materials or hazardous substances removed or contained by the
             239      owner or as otherwise required by applicable statute or rule.
             240          (3) The owner may terminate the construction contract upon payment to the contractor,
             241      subcontractor, or other person whose work is delayed under Subsection (1) of the amount of any
             242      services or materials supplied or expended which conform to the contract terms and specifications.


             243          (4) A contractor who interrupts the performance of a construction contract under this
             244      section is entitled to recover from the owner any costs incurred for mobilization resulting from the
             245      shutdown and restart of the project.
             246          Section 10. Section 13-34-207 is enacted to read:
             247          13-34-207. Suspension or termination of work for nonpayment -- Notice -- Costs and
             248      attorneys' fees.
             249          (1) (a) A contractor may suspend performance under a construction contract or terminate
             250      a construction contract for failure by the owner to make timely payment of the amount approved
             251      pursuant to Subsection 13-34-202 (1).
             252          (b) A contractor shall provide written notice to the owner at least 15 working days before
             253      the contractor's intended suspension or termination unless a shorter notice period is set forth in the
             254      construction contract between the owner and contractor. A construction contract may not extend
             255      the time period for a contractor to suspend performance or terminate a construction contract under
             256      this Subsection (1).
             257          (c) The suspension of performance or termination of a construction contract pursuant to
             258      this Subsection (1) does not constitute a breach of contract by the contractor.
             259          (2) (a) A subcontractor may suspend performance under a construction contract or
             260      terminate a construction contract if the owner fails to make timely payment of amounts approved
             261      pursuant to Subsection 13-34-202 (1) for the subcontractor's work or materials supplied and the
             262      contractor fails to pay the subcontractor for the approved work.
             263          (b) (i) For the first event of failure of timely payment on the construction project, a
             264      subcontractor shall provide written notice to the contractor and owner at least 15 working days
             265      before the subcontractor's intended suspension or termination, unless a shorter notice period is
             266      prescribed in the construction contract between the contractor and subcontractor.
             267          (ii) If, after a first event of failure of timely payment followed by notice as provided in
             268      Subsection (2)(b)(i), there is a subsequent failure of timely payment on the construction project,
             269      the subcontractor shall provide written notice to the contractor and owner at least ten working days
             270      before the subcontractor's intended suspension of termination, unless a shorter notice period is
             271      prescribed in the construction contract between the contractor and the subcontractor.
             272          (iii) A construction contract may not extend the time period for a subcontractor to
             273      suspend performance or terminate a construction contract under this Subsection (2).


             274          (c) The suspension of performance or termination of a subcontract pursuant to this
             275      Subsection (2) does not constitute a breach of contract by the subcontractor.
             276          (3) (a) A subcontractor may suspend performance under a construction contract or
             277      terminate a construction contract if the owner makes timely payment of amounts approved
             278      pursuant to Subsection 13-34-202 (1) for the subcontractor's work or materials supplied but the
             279      contractor fails to pay the subcontractor or the subcontractor fails to pay its subcontractor for the
             280      approved work.
             281          (b) (i) For the first event of failure of timely payment on the construction project, a
             282      subcontractor shall provide written notice to the contractor and owner at least 15 working days
             283      before the subcontractor's intended suspension or termination, unless a shorter notice period is
             284      prescribed in the construction contract between the contractor and subcontractor.
             285          (ii) If, after a first event of failure of timely payment followed by notice as provided in
             286      Subsection (3)(b)(i), there is a subsequent failure of timely payment on the construction project,
             287      the subcontractor shall provide written notice to the contractor and owner at least ten working days
             288      before the subcontractor's intended suspension of termination, unless a shorter notice period is
             289      prescribed in the construction contract between the contractor and the subcontractor.
             290          (c) The suspension of performance or termination of a subcontract pursuant to this
             291      Subsection (3) does not constitute a breach of contract by the subcontractor.
             292          (4) (a) A subcontractor may suspend performance under a construction contract or
             293      terminate a construction contract if the owner declines to approve and certify portions of the
             294      contractor's billing or estimate pursuant to Subsection 13-34-202 (1) for that subcontractor's work
             295      or materials supplied but the reasons for that failure by the owner to approve are not the fault of,
             296      or are not directly related to, the subcontractor's work or materials supplied.
             297          (b) A subcontractor shall provide written notice to the contractor and owner at least ten
             298      working days before the subcontractor's intended suspension or termination unless a shorter notice
             299      period is prescribed in the construction contract between the contractor and subcontractor, or
             300      subcontractor and subcontractor. A construction contract may not extend the time period for a
             301      subcontractor to suspend performance or terminate a construction contract under this Subsection
             302      (4).
             303          (c) The suspension of performance or termination of a subcontract pursuant to this
             304      Subsection (4) does not constitute a breach of contract by the subcontractor.


             305          (5) A contractor or subcontractor that suspends performance as provided in this section
             306      is not required to furnish further labor, materials, or services until the contractor or subcontractor
             307      is paid the amount that was approved, together with any costs incurred for mobilization resulting
             308      from the shutdown or restart of a project.
             309          Section 11. Section 13-34-208 is enacted to read:
             310          13-34-208. Written notice.
             311          Written notice required under this chapter shall be provided by:
             312          (1) delivery of a written notice in person to the individual or a member of the entity or to
             313      an officer of the corporation for which it was intended; or
             314          (2) sending the written notice by any means that provides written, third-party verification
             315      of delivery to the last business address known to the party giving notice.
             316          Section 12. Section 13-34-209 is enacted to read:
             317          13-34-209. Costs and attorneys fees.
             318          In any action or arbitration brought under this chapter, the successful party shall be awarded
             319      costs and reasonable attorneys fees.
             320          Section 13. Section 13-34-210 is enacted to read:
             321          13-34-210. Time of payment.
             322          For purposes of this chapter, payment is considered to have been made at the time the
             323      payment is sent.
             324          Section 14. Section 13-34-211 is enacted to read:
             325          13-34-211. Interest on late payments.
             326          (1) If an owner or a third party designated by an owner as the person responsible for
             327      making progress payments on a construction contract does not make a timely payment pursuant
             328      to this chapter, the owner shall pay the contractor interest at the rate of 1.5% per month or fraction
             329      of a month on the unpaid balance, unless otherwise set forth in the construction contract between
             330      the parties.
             331          (2) If a periodic or final payment to a subcontractor is delayed by more than ten working
             332      days after receipt of periodic or final payment by the contractor or subcontractor with whom it has
             333      the contract, the contractor or subcontractor, as the case may be, shall pay its subcontractor interest,
             334      except for periods of time during which payment is withheld pursuant to Subsection 13-34-204 (2),
             335      at the rate of 1.5% per month or a fraction of a month on the unpaid balance, unless otherwise set


             336      forth in the construction contract between the parties.
             337          Section 15. Effective date.
             338          This act takes effect on July 1, 2002.