Download Zipped Enrolled WordPerfect SCR001.ZIP
[Introduced][Status][Bill Documents][Fiscal Note][Bills Directory]

S.C.R. 1 Enrolled

                 

CONCURRENT RESOLUTION APPROVING

                 
SOLID WASTE PERMIT

                 
2004 GENERAL SESSION

                 
STATE OF UTAH

                 
Sponsor: Thomas V. Hatch

                 
                  LONG TITLE
                  General Description:
                      This concurrent resolution of the Legislature and the Governor gives approval for the
                  operation of a landfill to receive specified nonhazardous solid waste.
                  Highlighted Provisions:
                      This resolution:
                      .    addresses the proposed Solitude Landfill, that is owned by Green River Landfill,
                  LLC and Landfill Investors, LLC, and that is located in the city of Green River, in
                  Emery County;
                      .    grants statutorily required approval of the operating plan, as approved by the
                  Department of Environmental Quality, and allows the Solitude Landfill to operate as
                  a Class V landfill and receive nonhazardous waste, including municipal waste,
                  industrial waste, construction and demolition waste, and special wastes as
                  enumerated;
                      .    reiterates that the Solitude Landfill is required under state law to apply for and
                  receive approval from the Department of Environmental Quality in order to receive
                  an exemption from the daily cover requirement; and
                      .    reiterates that the Solitude Landfill is required under state law to apply for and
                  receive approval from the Department of Environmental Quality if the landfill desires
                  to change a specified element of its waste stream.
                  Special Clauses:
                      None
                 


                  Be it resolved by the Legislature of the state of Utah, the Governor concurring therein:
                      WHEREAS, Green River Landfill, LLC and Landfill Investors, LLC desire to construct
                  and operate a Class V commercial landfill to receive nonhazardous solid waste for treatment,
                  storage, or disposal as defined in Section 19-6-102 of the Utah Code;
                      WHEREAS, the facility is to be located at the site currently known as the Solitude
                  Landfill;
                      WHEREAS, this site is an irregularly shaped 320-acre parcel in Section 22, Township 21
                  South, Range 17 East, Salt Lake Base and Meridian, and is located approximately nine miles east
                  of the Green River, in the city of Green River, in Emery County;
                      WHEREAS, Green River Landfill, LLC and Landfill Investors, LLC currently hold a
                  permit to operate at this site a noncommercial nonhazardous solid waste facility that would
                  receive solely municipal waste under contract with local governments;
                      WHEREAS, Section 19-6-108 of the Utah Code requires that an applicant for authority to
                  construct a commercial landfill receive approval from the Utah State Legislature and the
                  Governor of the State as a part of the approval process;
                      WHEREAS, Section 19-6-108 also requires that an applicant for authority to operate a
                  commercial landfill receive approval from the executive secretary of the Solid and Hazardous
                  Waste Control Board within the Department of Environmental Quality prior to receiving
                  legislative and gubernatorial approval;
                      WHEREAS, Green River Landfill, LLC and Landfill Investors, LLC have submitted a
                  proposed operation plan for the Solitude Landfill as a Class V commercial nonhazardous solid
                  waste landfill to the Department of Environmental Quality, and the operation plan was approved
                  by the executive secretary of the Solid and Hazardous Waste Control Board on July 11, 2003 and
                  this approval was effective on July 15, 2003;
                      WHEREAS, the approved operating plan for the Solitude Landfill allows the landfill to
                  receive nonhazardous waste, including municipal waste, industrial waste, construction and
                  demolition waste, and special wastes as enumerated in the operation plan and in the plan approval
                  of the executive secretary, and as defined in Administrative Rule R315-315, Special Waste

- 2 -


                  Requirements;
                      WHEREAS, the approved operating plan requires under Title 19, Environmental Quality
                  Code, that the landfill provide daily cover, and this requirement in the plan may be changed only
                  upon application to the Department of Environmental Quality, review by the department of the
                  effectiveness of the proposed alternative to the daily cover, and a determination by the department
                  that the alternative meets the landfill maintenance requirements no less effectively than a daily
                  cover; and
                      WHEREAS, the approved operating plan specifically excludes acceptance by the landfill
                  of industrial waste directly from other generators, and the Green River Landfill, LLC and Landfill
                  Investors, LLC are required to submit an application and receive approval from the department in
                  order to change the operating plan to allow acceptance of this waste:
                      NOW, THEREFORE, BE IT RESOLVED by the Legislature, the Governor concurring
                  therein, that Green River Landfill, LLC and Landfill Investors, LLC are granted approval to
                  construct and operate a Class V commercial nonhazardous solid waste landfill known as the
                  Solitude Landfill in Green River, Utah.

- 3 -


[Bill Documents][Bills Directory]