Download Zipped Introduced WordPerfect HB0225.ZIP
[Status][Bill Documents][Fiscal Note][Bills Directory]

H.B. 225

             1     

PROOF FOR A WATER RIGHT APPLICATION

             2     
2008 GENERAL SESSION

             3     
STATE OF UTAH

             4     
Chief Sponsor: Patrick Painter

             5     
Senate Sponsor: ____________

             6     
             7      LONG TITLE
             8      General Description:
             9          This bill amends provisions relating to the proof of a water right application.
             10      Highlighted Provisions:
             11          This bill:
             12          .    changes the proof required for a water right appropriation; and
             13          .    makes technical changes.
             14      Monies Appropriated in this Bill:
             15          None
             16      Other Special Clauses:
             17          None
             18      Utah Code Sections Affected:
             19      AMENDS:
             20          73-3-16, as last amended by Laws of Utah 1998, Chapter 33
             21     
             22      Be it enacted by the Legislature of the state of Utah:
             23          Section 1. Section 73-3-16 is amended to read:
             24           73-3-16. Proof of appropriation or permanent change -- Notice -- Manner of
             25      proof -- Statements -- Maps, profiles, and drawings -- Verification -- Waiver of filing --
             26      Statement in lieu of proof of appropriation or change.
             27          (1) Sixty days before the date set for the proof of appropriation or proof of change to be


             28      made, the state engineer shall notify the applicant by mail when proof of completion of the
             29      works and application of the water to a beneficial use [will be] is due.
             30          (2) On or before the date set for completing the proof in accordance with the
             31      application, the applicant shall file proof with the state engineer on [forms] a form furnished by
             32      the state engineer.
             33          (3) Except as provided in [Subsection (4)] Subsections (4) and (5), the applicant shall
             34      submit the following information:
             35          (a) a description of the works constructed;
             36          (b) the quantity of water in acre-feet or the flow in second-feet diverted, or both;
             37          (c) the method of applying the water to beneficial use; and
             38          (d) (i) detailed measurements of water put to beneficial use;
             39          (ii) the date the measurements were made; and
             40          (iii) the name of the person making the measurements.
             41          (4) If the applicant is a public agency holding water for the reasonable future
             42      requirements of the public as provided in Section 73-3-12 , the applicant shall submit the
             43      following information:
             44          (a) a description of the works constructed;
             45          (b) the method of applying the water to beneficial use;
             46          (c) the flow of water diverted, measured in second-feet;
             47          (d) the quantity of water used, measured in acre-feet;
             48          (e) the quantity of water the applicant is holding for the reasonable future requirements
             49      of the public, measured in acre-feet; and
             50          (f) the name of the person making the measurements required by Subsections (4)(c)
             51      through (e).
             52          [(4) (a) On applications] (5) (a) An applicant shall file proof, as required by this
             53      Subsection (5), on an application filed for appropriation or permanent change of use of water to
             54      provide a water supply for [state projects] the following entities:
             55          (i) a state project constructed pursuant to Title 73, Chapter 10, Board of Water
             56      Resources - Division of Water Resources[,]; or [for federal projects]
             57          (ii) a federal project constructed by the United States Bureau of Reclamation for the
             58      use and benefit of:


             59          (A) the state[, any of its agencies, its];
             60          (B) a state agency;
             61          (C) a political [subdivisions,] subdivision;
             62          (D) a public and quasi-municipal [corporations,] corporation; or [water users'
             63      associations of which the state, its agencies, political subdivisions, or public and
             64      quasi-municipal corporations are stockholders, the]
             65          (E) a water users' association of which an entity listed in Subsections (5)(a)(ii)(A)
             66      through (D) is a stockholder.
             67          (b) The proof shall include:
             68          (i) a statement indicating construction of the project works has been completed;
             69          (ii) a description of the major features with appropriate maps, profiles, drawings, and
             70      reservoir area-capacity curves;
             71          (iii) a description of the point or points of diversion and rediversion;
             72          (iv) project operation data;
             73          (v) a map showing the place of use of water and a statement of the purpose and method
             74      of use;
             75          (vi) the project plan for beneficial use of water under the applications and the quantity
             76      of water required; and
             77          (vii) a statement indicating what type of measuring devices have been installed.
             78          [(b)] (c) The director of the Division of Water Resources shall sign proofs for the state
             79      projects and an authorized official of the Bureau of Reclamation shall sign proofs for the
             80      federal projects specified in Subsection [(4)(a)] (5)(a)(i).
             81          [(5)] (6) The proof on all applications shall be sworn to by the applicant or the
             82      applicant's appointed representative and proof engineer.
             83          [(6)] (7) (a) Except as provided in Subsection [(6)] (7)(b), when filing proof, the
             84      applicant shall submit maps, profiles, and drawings made by a Utah licensed land surveyor or
             85      Utah licensed professional engineer that show:
             86          (i) the location of the completed works;
             87          (ii) the nature and extent of the completed works;
             88          (iii) the natural stream or source from which and the point where the water is diverted
             89      and, in the case of a nonconsumptive use, the point where the water is returned; and


             90          (iv) the place of use.
             91          (b) The state engineer may waive the filing of maps, profiles, and drawings if in the
             92      state engineer's opinion the written proof adequately describes the works and the nature and
             93      extent of beneficial use.
             94          [(7)] (8) The completed proof shall conform to rules and standards established by the
             95      state engineer.
             96          [(8)] (9) In those areas in which general determination proceedings are pending, or
             97      have been concluded, under Title 73, Chapter 4, Determination of Water Rights, the state
             98      engineer may petition the district court for permission to:
             99          (a) waive the requirements of this section and Section 73-3-17 ; and
             100          (b) permit each owner of an application to file a verified statement to the effect that the
             101      applicant has completed the appropriation or change and elects to file a statement of water
             102      users claim in the proposed determination of water rights or any supplement to it in accordance
             103      with Title 73, Chapter 4, Determination of Water Rights, in lieu of proof of appropriation or
             104      proof of change.




Legislative Review Note
    as of 1-30-08 10:11 AM


Office of Legislative Research and General Counsel


[Bill Documents][Bills Directory]