Download Zipped Enrolled WordPerfect SB0137.ZIP
[Introduced][Amended][Status][Bill Documents][Fiscal Note][Bills Directory]

S.B. 137 Enrolled

             1     

COORDINATION OF REMOVING,

             2     
RELOCATING, OR ALTERING UTILITIES

             3     
2010 GENERAL SESSION

             4     
STATE OF UTAH

             5     
Chief Sponsor: Daniel R. Liljenquist

             6     
House Sponsor: Ryan D. Wilcox

             7     
             8      LONG TITLE
             9      General Description:
             10          This bill addresses the removal, relocation, or alteration of a utility facility to
             11      accommodate a construction or reconstruction project on a public highway.
             12      Highlighted Provisions:
             13          This bill:
             14          .    defines terms;
             15          .    provides for notification and cooperation concerning utility facilities located in the
             16      area of a proposed construction or reconstruction project on a public highway;
             17          .    provides a method for a public agency to identify a utility company with a utility
             18      facility in the area of a proposed construction or reconstruction project on a public
             19      highway; and
             20          .    makes technical changes.
             21      Monies Appropriated in this Bill:
             22          None
             23      Other Special Clauses:
             24          None
             25      Utah Code Sections Affected:
             26      AMENDS:
             27          54-8a-9, as last amended by Laws of Utah 2008, Chapter 344
             28          72-6-116, as last amended by Laws of Utah 2008, Chapter 382
             29      ENACTS:


             30          54-3-29, Utah Code Annotated 1953
             31     
             32      Be it enacted by the Legislature of the state of Utah:
             33          Section 1. Section 54-3-29 is enacted to read:
             34          54-3-29. Removal, relocation, or alteration of utility facility in public highway
             35      construction or reconstruction -- Notice -- Cooperation.
             36          (1) As used in this section:
             37          (a) "Design-build" means a design-build transportation project for which a
             38      design-build transportation project contract is issued, within the meaning of Section
             39      63G-6-502 .
             40          (b) "Municipality" is as defined in Section 10-1-4 .
             41          (c) "Political subdivision" means a:
             42          (i) county; or
             43          (ii) municipality.
             44          (d) "Public agency" means an entity of state government or a political subdivision.
             45          (e) "Public highway" means a highway, street, road, or alley constructed for public use
             46      in the state.
             47          (f) "Utility company" means a privately, cooperatively, or publicly owned utility,
             48      including a utility owned by a political subdivision, that provides service using a utility
             49      facility.
             50          (g) "Utility facility" means:
             51          (i) a telecommunications, gas, electricity, cable television, water, sewer, or data
             52      facility;
             53          (ii) a video transmission line;
             54          (iii) a drainage and irrigation system; or
             55          (iv) a facility similar to those listed in Subsections (1)(g)(i) through (iii) located in, on,
             56      along, across, over, through, or under any public highway.
             57          (2) If a public agency engages in or proposes to engage in a construction or


             58      reconstruction project on a public highway that may require the removal, relocation, or
             59      alteration of a utility facility, the public agency shall:
             60          (a) contact an association, established under Title 54, Chapter 8a, Damage to
             61      Underground Utility Facilities, to identify each utility company that may have a utility facility
             62      in the area of the construction or reconstruction project;
             63          (b) identify a utility company that has an above-ground utility facility in the area of
             64      the proposed construction or reconstruction project; and
             65          (c) electronically notify each utility company identified in accordance with
             66      Subsections (2)(a) and (b).
             67          (3) The notice required by Subsection (2)(c) shall:
             68          (a) be made as early as practicable and at least 30 days:
             69          (i) before the preliminary design or project development meeting;
             70          (ii) before issuance of a request for proposal for a design-build project; or
             71          (iii) after a change in scope of a design-build project;
             72          (b) include:
             73          (i) information concerning the proposed project design;
             74          (ii) the proposed date of a required removal, relocation, or alteration of a utility
             75      facility;
             76          (iii) the federal identifying project number, if applicable; and
             77          (c) advise the utility company if the proposed project may qualify for aid for the utility
             78      company's expense in removing, relocating, or altering a utility facility.
             79          (4) A public agency shall permit a utility company notified under Subsection (2) to
             80      participate in the preliminary design or project development meeting, or similar meeting at
             81      which the project design is addressed.
             82          (5) (a) A public agency shall, not less than 30 days after providing notice under
             83      Subsection (2) to each utility company, provide the utility company an opportunity to meet
             84      with the public agency to allow the utility company to:
             85          (i) review project plans;


             86          (ii) understand the objectives and funding sources for the proposed project;
             87          (iii) provide and discuss recommendations to the public agency that may reasonably
             88      eliminate or minimize utility removal, relocation, or alteration costs, limit the disruption of
             89      utility company services, or eliminate or reduce the need for present or future utility facility
             90      removal, relocation, or alteration; and
             91          (iv) provide reasonable schedules to enable coordination of the construction project
             92      and removal, relocation, or alteration of a utility facility.
             93          (b) If a public agency provides a utility company with reasonable opportunities to
             94      meet in accordance with Subsection (5)(a), the utility company's failure to meet does not affect
             95      the public agency's ability to proceed with the project.
             96          (6) While recognizing the essential goals and objectives of the public highway agency
             97      in proceeding with and completing a project, the parties shall use their best efforts to find
             98      ways to:
             99          (a) eliminate the cost to the utility of relocation of the utility facilities; or
             100          (b) if elimination of the costs is not feasible, minimize the relocation costs to the
             101      extent reasonably possible.
             102          (7) A utility company notified under Subsection (2) shall coordinate with the public
             103      agency concerning the utility facility removal, relocation, or alteration, including the
             104      scheduling of the utility facility removal, relocation, or alteration.
             105          (8) A public agency and a utility company may address the removal, relocation, or
             106      alteration of a utility facility in relation to a construction or reconstruction project on a public
             107      highway in a franchise agreement in lieu of this section, if the public agency is otherwise
             108      permitted to enter into the franchise agreement.
             109          (9) This chapter does not affect a public agency's authority over a public right-of-way,
             110      including any rule, ordinance, order to relocate a utility as provided in Section 72-6-116 , or
             111      other valid provision governing the use of the public right-of-way.
             112          Section 2. Section 54-8a-9 is amended to read:
             113           54-8a-9. Association for mutual receipt of notice of excavation activities.


             114          (1) (a) (i) Two or more operators may form and operate a statewide association
             115      providing for mutual receipt of notice of excavation activities.
             116          (ii) If an association is operational, notice to the association shall be given pursuant to
             117      Section 54-8a-4 .
             118          (b) (i) If an association is formed, each operator with an underground facility in the
             119      area shall become a member of the association and participate in it to:
             120          (A) receive a notice of a proposed excavation submitted to the association;
             121          (B) receive the services furnished by it; and
             122          (C) pay its share of the cost for the service furnished.
             123          (ii) If an operator does not comply with Subsection (1)(b)(i) and Section 54-8a-5 , the
             124      operator is liable for damages incurred by an excavator who complies with this chapter's
             125      requirements.
             126          (c) An association whose members or participants have underground facilities within a
             127      county shall:
             128          (i) file a description of the geographical area served by the association; and
             129          (ii) file the name and address of every member and participating operator with the
             130      county clerk.
             131          (2) An association receiving notice as provided in Subsection 54-8a-4 (1) shall:
             132          (a) notify members and participants in the relevant geographic area within 24 hours
             133      after receiving notice from the person who proposes to excavate; and
             134          (b) maintain a record of any notice received for a period of five years to document
             135      compliance with the requirements of this chapter.
             136          (3) An association contacted by a public agency to identify a utility company in
             137      accordance with Section 54-3-29 , shall provide the public agency with a list, including contact
             138      information to the extent available, of each utility company of which the association is aware
             139      that has a utility facility within the area identified by the public agency.
             140          Section 3. Section 72-6-116 is amended to read:
             141           72-6-116. Regulation of utilities -- Relocation of utilities.


             142          (1) As used in this section:
             143          (a) "Cost of relocation" includes the entire amount paid by the utility company
             144      properly attributable to the relocation of the utility after deducting any increase in the value of
             145      the new utility and any salvage value derived from the old utility.
             146          (b) "Utility" includes telecommunication, gas, electricity, cable television, water,
             147      sewer, data, and video transmission lines, drainage and irrigation systems, and other similar
             148      utilities located in, on, along, across, over, through, or under any state highway.
             149          (c) "Utility company" means a privately, cooperatively, or publicly owned utility,
             150      including utilities owned by political subdivisions.
             151          (2) (a) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act,
             152      the department may make rules for the installation, construction, maintenance, repair, renewal,
             153      system upgrade, and relocation of all utilities.
             154          (b) If the department determines under the rules established in this section that it is
             155      necessary that any utilities should be relocated, the utility company owning or operating the
             156      utilities shall relocate the utilities in accordance with this section and the order of the
             157      department.
             158          (3) (a) The department shall pay 100% of the cost of relocation of a utility on a state
             159      highway if the:
             160          (i) utility is owned or operated by a political subdivision of the state; or
             161          (ii) utility company owns the easement or fee title to the right-of-way in which the
             162      utility is located.
             163          (b) Except as provided in Subsection (3)(a) or (c), the department shall pay 50% of the
             164      cost of relocation of a utility on a state highway and the utility company shall pay the
             165      remainder of the cost of relocation.
             166          (c) This Subsection (3) does not affect the provisions of Subsection 72-7-108 (5).
             167          (4) If a utility is relocated, the utility company owning or operating the utility, its
             168      successors or assigns, may maintain and operate the utility, with the necessary appurtenances,
             169      in the new location.


             170          (5) In accordance with this section, the cost of relocating a utility in connection with
             171      any project on a highway is a cost of highway construction.
             172          (6) (a) The department shall notify affected utility companies, in accordance with
             173      Section 54-3-29 , whenever the relocation of utilities is likely to be necessary because of a
             174      reconstruction project.
             175          (b) The notification shall be made during the preliminary design of the project or as
             176      soon as practical in order to minimize the number, costs, and delays of utility relocations.
             177          (c) A utility company notified under this Subsection (6) shall coordinate with the
             178      department and the department's contractor on the utility relocations, including the scheduling
             179      of the utility relocations.


[Bill Documents][Bills Directory]