Download Zipped Introduced WordPerfect HB0368.ZIP
[Status][Bill Documents][Fiscal Note][Bills Directory]

H.B. 368

             1     

ABANDONMENT OR FORFEITURE OF WATER RIGHTS

             2     
2012 GENERAL SESSION

             3     
STATE OF UTAH

             4     
Chief Sponsor: Brad J. Galvez

             5     
Senate Sponsor: Ralph Okerlund

             6     
             7      LONG TITLE
             8      General Description:
             9          This bill modifies provisions regarding forfeiture of a water right under Title 73, Water
             10      and Irrigation.
             11      Highlighted Provisions:
             12          This bill:
             13          .    prohibits the state engineer from asserting forfeiture of a water right in a proposed
             14      determination of rights if the period of nonuse did not occur or end during a certain
             15      period;
             16          .    bars an assertion of forfeiture regarding a water right subject to a proposed
             17      determination if the assertion is not made by the state engineer in the proposed
             18      determination or by a person in an objection to the proposed determination;
             19          .    subjects a water right found to be valid in a decree adjudicating a general
             20      determination of water rights to a claim of forfeiture based on a period of nonuse
             21      that begins after the state engineer files the related proposed determination of rights
             22      with the court; and
             23          .    makes technical changes.
             24      Money Appropriated in this Bill:
             25          None
             26      Other Special Clauses:
             27          None


             28      Utah Code Sections Affected:
             29      AMENDS:
             30          73-1-4, as last amended by Laws of Utah 2009, Chapter 388
             31     
             32      Be it enacted by the Legislature of the state of Utah:
             33          Section 1. Section 73-1-4 is amended to read:
             34           73-1-4. Reversion to the public by abandonment or forfeiture for nonuse within
             35      seven years -- Nonuse application.
             36          (1) As used in this section:
             37          (a) "Public entity" means:
             38          (i) the United States;
             39          (ii) an agency of the United States;
             40          (iii) the state;
             41          (iv) a state agency;
             42          (v) a political subdivision of the state; or
             43          (vi) an agency of a political subdivision of the state.
             44          (b) "Public water supplier" means an entity that:
             45          (i) supplies water, directly or indirectly, to the public for municipal, domestic, or
             46      industrial use; and
             47          (ii) is:
             48          (A) a public entity;
             49          (B) a water corporation, as defined in Section 54-2-1 , that is regulated by the Public
             50      Service Commission;
             51          (C) a community water system:
             52          (I) that:
             53          (Aa) supplies water to at least 100 service connections used by year-round residents; or
             54          (Bb) regularly serves at least 200 year-round residents; and
             55          (II) whose voting members:
             56          (Aa) own a share in the community water system;
             57          (Bb) receive water from the community water system in proportion to the member's
             58      share in the community water system; and


             59          (Cc) pay the rate set by the community water system based on the water the member
             60      receives; or
             61          (D) a water users association:
             62          (I) in which one or more public entities own at least 70% of the outstanding shares; and
             63          (II) that is a local sponsor of a water project constructed by the United States Bureau of
             64      Reclamation.
             65          (c) "Shareholder" is as defined in Section 73-3-3.5 .
             66          (d) "Water company" is as defined in Section 73-3-3.5 .
             67          (e) "Water supply entity" means an entity that supplies water as a utility service or for
             68      irrigation purposes and is also:
             69          (i) a municipality, water conservancy district, metropolitan water district, irrigation
             70      district, or other public agency;
             71          (ii) a water company regulated by the Public Service Commission; or
             72          (iii) any other owner of a community water system.
             73          (2) (a) When an appropriator or the appropriator's successor in interest abandons or
             74      ceases to use all or a portion of a water right for a period of seven years, the water right or the
             75      unused portion of that water right is subject to forfeiture in accordance with Subsection (2)(c),
             76      unless the appropriator or the appropriator's successor in interest files a nonuse application
             77      with the state engineer.
             78          (b) (i) A nonuse application may be filed on all or a portion of the water right,
             79      including water rights held by a water company.
             80          (ii) After giving written notice to the water company, a shareholder may file a nonuse
             81      application with the state engineer on the water represented by the stock.
             82          (c) (i) [A] Except as provided in Subsection (2)(c)(ii), a water right or a portion of the
             83      water right may not be forfeited unless a judicial action to declare the right forfeited is
             84      commenced within 15 years from the end of the latest period of nonuse of at least seven years.
             85          [(ii) If forfeiture is asserted in an action for general determination of rights in
             86      conformance with the provisions of Chapter 4, Determination of Water Rights, the 15-year
             87      limitation period shall commence to run back in time from the date the state engineer's
             88      proposed determination of rights is served upon each claimant.]
             89          [(iii) A decree entered in an action for general determination of rights under Chapter 4,


             90      Determination of Water Rights, shall bar any claim of forfeiture for prior nonuse against any
             91      right determined to be valid in the decree, but does not bar a claim for periods of nonuse that
             92      occur after the entry of the decree.]
             93          [(iv) A proposed determination by the state engineer in an action for general
             94      determination of rights under Chapter 4, Determination of Water Rights, bars a claim of
             95      forfeiture for prior nonuse against any right proposed to be valid, unless a timely objection has
             96      been filed within the time allowed in Chapter 4, Determination of Water Rights.]
             97          (ii) (A) The state engineer, in a proposed determination of rights prepared in
             98      accordance with Section 73-4-11 , may not assert that a water right was forfeited unless a period
             99      of nonuse of seven years occurs or ends during the 15-years immediately preceding the day on
             100      which the state engineer files the proposed determination of rights with the court.
             101          (B) After the day on which a proposed determination of rights is filed with the court, a
             102      person may not assert that a water right subject to that determination was forfeited during the
             103      15-year period described in Subsection (2)(c)(ii)(A) unless the state engineer asserts forfeiture
             104      in the proposed determination, or a person makes, in accordance with Section 73-4-11 , an
             105      objection to the proposed determination.
             106          (iii) A water right, found to be valid in a decree entered in an action for general
             107      determination of rights under Chapter 4, Determination of Water Rights, is subject to a claim
             108      of forfeiture based on a seven-year period of nonuse that begins after the day on which the state
             109      engineer filed the related proposed determination of rights with the court, unless the decree
             110      provides otherwise.
             111          [(v)] (iv) If in a judicial action a court declares a water right forfeited, on the date on
             112      which the water right is forfeited:
             113          (A) the right to use the water reverts to the public; and
             114          (B) the water made available by the forfeiture:
             115          (I) first, satisfies other water rights in the hydrologic system in order of priority date;
             116      and
             117          (II) second, may be appropriated as provided in this title.
             118          (d) This section applies whether the unused or abandoned water or a portion of the
             119      water is:
             120          (i) permitted to run to waste; or


             121          (ii) used by others without right with the knowledge of the water right holder.
             122          (e) This section does not apply to:
             123          (i) the use of water according to a lease or other agreement with the appropriator or the
             124      appropriator's successor in interest;
             125          (ii) a water right if its place of use is contracted under an approved state agreement or
             126      federal conservation fallowing program;
             127          (iii) those periods of time when a surface water or groundwater source fails to yield
             128      sufficient water to satisfy the water right;
             129          (iv) a water right when water is unavailable because of the water right's priority date;
             130          (v) a water right to store water in a surface reservoir or an aquifer, in accordance with
             131      Title 73, Chapter 3b, Groundwater Recharge and Recovery Act, if:
             132          (A) the water is stored for present or future use; or
             133          (B) storage is limited by a safety, regulatory, or engineering restraint that the
             134      appropriator or the appropriator's successor in interest cannot reasonably correct;
             135          (vi) a water right if a water user has beneficially used substantially all of the water right
             136      within a seven-year period, provided that this exemption does not apply to the adjudication of a
             137      water right in a general determination of water rights under Chapter 4, Determination of Water
             138      Rights;
             139          (vii) except as provided by Subsection (2)(g), a water right:
             140          (A) (I) owned by a public water supplier;
             141          (II) represented by a public water supplier's ownership interest in a water company; or
             142          (III) to which a public water supplier owns the right of use; and
             143          (B) conserved or held for the reasonable future water requirement of the public, which
             144      is determined according to Subsection (2)(f);
             145          (viii) a supplemental water right during a period of time when another water right
             146      available to the appropriator or the appropriator's successor in interest provides sufficient water
             147      so as to not require use of the supplemental water right; or
             148          (ix) a water right subject to an approved change application where the applicant is
             149      diligently pursuing certification.
             150          (f) (i) The reasonable future water requirement of the public is the amount of water
             151      needed in the next 40 years by the persons within the public water supplier's projected service


             152      area based on projected population growth or other water use demand.
             153          (ii) For purposes of Subsection (2)(f)(i), a community water system's projected service
             154      area:
             155          (A) is the area served by the community water system's distribution facilities; and
             156          (B) expands as the community water system expands the distribution facilities in
             157      accordance with Title 19, Chapter 4, Safe Drinking Water Act.
             158          (g) For a water right acquired by a public water supplier on or after May 5, 2008,
             159      Subsection (2)(e)(vii) applies if:
             160          (i) the public water supplier submits a change application under Section 73-3-3 ; and
             161          (ii) the state engineer approves the change application.
             162          (3) (a) The state engineer shall furnish a nonuse application form requiring the
             163      following information:
             164          (i) the name and address of the applicant;
             165          (ii) a description of the water right or a portion of the water right, including the point of
             166      diversion, place of use, and priority;
             167          (iii) the quantity of water;
             168          (iv) the period of use;
             169          (v) the extension of time applied for;
             170          (vi) a statement of the reason for the nonuse of the water; and
             171          (vii) any other information that the state engineer requires.
             172          (b) (i) Filing the nonuse application extends the time during which nonuse may
             173      continue until the state engineer issues an order on the nonuse application.
             174          (ii) Approval of a nonuse application protects a water right from forfeiture for nonuse
             175      from the application's filing date until the approved application's expiration date.
             176          (c) (i) Upon receipt of the application, the state engineer shall publish a notice of the
             177      application once a week for two successive weeks:
             178          (A) in a newspaper of general circulation in the county in which the source of the water
             179      supply is located and where the water is to be used; and
             180          (B) as required in Section 45-1-101 .
             181          (ii) The notice shall:
             182          (A) state that an application has been made; and


             183          (B) specify where the interested party may obtain additional information relating to the
             184      application.
             185          (d) Any interested person may file a written protest with the state engineer against the
             186      granting of the application:
             187          (i) within 20 days after the notice is published, if the adjudicative proceeding is
             188      informal; and
             189          (ii) within 30 days after the notice is published, if the adjudicative proceeding is
             190      formal.
             191          (e) In any proceedings to determine whether the nonuse application should be approved
             192      or rejected, the state engineer shall follow the procedures and requirements of Title 63G,
             193      Chapter 4, Administrative Procedures Act.
             194          (f) After further investigation, the state engineer may approve or reject the application.
             195          (4) (a) The state engineer shall grant a nonuse application on all or a portion of a water
             196      right for a period of time not exceeding seven years if the applicant shows a reasonable cause
             197      for nonuse.
             198          (b) A reasonable cause for nonuse includes:
             199          (i) a demonstrable financial hardship or economic depression;
             200          (ii) the initiation of water conservation or efficiency practices, or the operation of a
             201      groundwater recharge recovery program approved by the state engineer;
             202          (iii) operation of legal proceedings;
             203          (iv) the holding of a water right or stock in a mutual water company without use by any
             204      water supply entity to meet the reasonable future requirements of the public;
             205          (v) situations where, in the opinion of the state engineer, the nonuse would assist in
             206      implementing an existing, approved water management plan; or
             207          (vi) the loss of capacity caused by deterioration of the water supply or delivery
             208      equipment if the applicant submits, with the application, a specific plan to resume full use of
             209      the water right by replacing, restoring, or improving the equipment.
             210          (5) (a) Sixty days before the expiration of a nonuse application, the state engineer shall
             211      notify the applicant by mail or by any form of electronic communication through which receipt
             212      is verifiable, of the date when the nonuse application will expire.
             213          (b) An applicant may file a subsequent nonuse application in accordance with this


             214      section.




Legislative Review Note
    as of 2-15-12 8:09 AM


Office of Legislative Research and General Counsel


[Bill Documents][Bills Directory]