Download Zipped Introduced WordPerfect SB0094.ZIP
[Status][Bill Documents][Fiscal Note][Bills Directory]
S.B. 94
1
2
3
4
5
6
7 LONG TITLE
8 General Description:
9 This bill enacts language related to an interlocal entity that provides replacement project
10 capacity and the Electric Power Facilities Act.
11 Highlighted Provisions:
12 This bill:
13 . defines terms;
14 . amends provisions in the Interlocal Cooperation Act that govern a project entity;
15 . excludes certain facilities that provide replacement project capacity from the
16 certificate of public convenience and necessity requirement;
17 . describes the scope of the Electric Power Facilities Act;
18 . describes a person's ownership or use of works or facilities; and
19 . makes technical corrections.
20 Money Appropriated in this Bill:
21 None
22 Other Special Clauses:
23 None
24 Utah Code Sections Affected:
25 AMENDS:
26 11-13-103, as last amended by Laws of Utah 2008, Chapter 250
27 11-13-301, as last amended by Laws of Utah 2003, Chapter 21
28 11-13-304, as renumbered and amended by Laws of Utah 2002, Chapter 286
29 54-9-102, as renumbered and amended by Laws of Utah 2002, Chapter 286
30 ENACTS:
31 54-9-108, Utah Code Annotated 1953
32
33 Be it enacted by the Legislature of the state of Utah:
34 Section 1. Section 11-13-103 is amended to read:
35 11-13-103. Definitions.
36 As used in this chapter:
37 (1) (a) "Additional project capacity" means electric generating capacity provided by a
38 generating unit that first produces electricity on or after May 6, 2002, and that is constructed or
39 installed at or adjacent to the site of a project that first produced electricity before May 6, 2002,
40 regardless of whether:
41 [
42 owner of the project; and
43 [
44 different from the purchasers of electricity from the project.
45 (b) "Additional project capacity" does not mean or include replacement project
46 capacity.
47 (2) "Board" means the Permanent Community Impact Fund Board created by Section
48 9-4-304 , and its successors.
49 (3) "Candidate" means one or more of:
50 (a) the state;
51 (b) a county, municipality, school district, local district, special service district, or other
52 political subdivision of the state; and
53 (c) a prosecution district.
54 (4) "Commercial project entity" means a project entity, defined in Subsection (12),
55 that:
56 (a) has no taxing authority; and
57 (b) is not supported in whole or in part by and does not expend or disburse tax
58 revenues.
59 (5) "Direct impacts" means an increase in the need for public facilities or services that
60 is attributable to the project or facilities providing additional project capacity, except impacts
61 resulting from the construction or operation of a facility that is:
62 (a) owned by an owner other than the owner of the project or of the facilities providing
63 additional project capacity; and
64 (b) used to furnish fuel, construction, or operation materials for use in the project.
65 (6) "Electric interlocal entity" means an interlocal entity described in Subsection
66 11-13-203 (3).
67 (7) "Energy services interlocal entity" means an interlocal entity that is described in
68 Subsection 11-13-203 (4).
69 (8) (a) "Estimated electric requirements," when used with respect to a qualified energy
70 services interlocal entity, includes any of the following that meets the requirements of
71 Subsection (8)(b):
72 (i) generation capacity;
73 (ii) generation output; or
74 (iii) an electric energy production facility.
75 (b) An item listed in Subsection (8)(a) is included in "estimated electric requirements"
76 if it is needed by the qualified energy services interlocal entity to perform the qualified energy
77 services interlocal entity's contractual or legal obligations to any of its members.
78 (9) "Interlocal entity" means:
79 (a) a Utah interlocal entity, an electric interlocal entity, or an energy services interlocal
80 entity; or
81 (b) a separate legal or administrative entity created under Section 11-13-205 .
82 (10) "Out-of-state public agency" means a public agency as defined in Subsection
83 (13)(c), (d), or (e).
84 (11) (a) "Project":
85 (i) means an electric generation and transmission facility owned by a Utah interlocal
86 entity or an electric interlocal entity; and
87 (ii) includes fuel or fuel transportation facilities and water facilities owned by that Utah
88 interlocal entity or electric interlocal entity and required for the generation and transmission
89 facility.
90 (b) "Project" includes a project entity's ownership interest in:
91 (i) facilities that provide additional project capacity; [
92 (ii) facilities that provide replacement project capacity; and
93 [
94 facilities added to a project.
95 (12) "Project entity" means a Utah interlocal entity or an electric interlocal entity that
96 owns a project.
97 (13) "Public agency" means:
98 (a) a city, town, county, school district, local district, special service district, or other
99 political subdivision of the state;
100 (b) the state or any department, division, or agency of the state;
101 (c) any agency of the United States;
102 (d) any political subdivision or agency of another state or the District of Columbia
103 including any interlocal cooperation or joint powers agency formed under the authority of the
104 law of the other state or the District of Columbia; and
105 (e) any Indian tribe, band, nation, or other organized group or community which is
106 recognized as eligible for the special programs and services provided by the United States to
107 Indians because of their status as Indians.
108 (14) "Qualified energy services interlocal entity" means an energy services interlocal
109 entity that at the time that the energy services interlocal entity acquires its interest in facilities
110 providing additional project capacity has at least five members that are Utah public agencies.
111 (15) "Replacement project capacity" means electric generating capacity or transmission
112 capacity that:
113 (a) replaces all or a portion of the existing electric generating or transmission capacity
114 of a project; and
115 (b) is provided by a facility that is constructed, reconstructed, converted, repowered, or
116 installed in a location adjacent to or in proximity to or interconnected with the site of a project,
117 regardless of whether the capacity replacing existing capacity is less than or exceeds the
118 generating or transmission capacity of the project prior to installation of the capacity replacing
119 existing capacity.
120 [
121 (a) means an interlocal entity described in Subsection 11-13-203 (2); and
122 (b) includes a separate legal or administrative entity created under Laws of Utah 1977,
123 Chapter 47, Section 3, as amended.
124 [
125 (b).
126 Section 2. Section 11-13-301 is amended to read:
127 11-13-301. Project entity and generation output requirements.
128 (1) Each project entity:
129 (a) shall:
130 [
131 before undertaking the construction of a project [
132 facilities to provide additional project capacity, offer to sell or make available at least 50% of
133 the generation output of or electric energy produced by the project or additional project
134 capacity, respectively;
135 [
136 provide at least 60 days for a prospective power purchaser to accept the offer before the offer is
137 considered rejected; and
138 [
139 [
140 participation interest, a power sales agreement, or otherwise; and
141 [
142 wholesale or retail[
143 (b) may undertake construction of facilities to provide replacement project capacity for
144 its project.
145 (2) (a) The generation output or electric energy production available to power
146 purchasers in the state from a project shall be at least 5% of the total generation output or
147 electric energy production of the project.
148 (b) (i) Subject to Subsection (2)(b)(ii)(B), at least a majority of the generation capacity,
149 generation output, or electric energy production facilities providing additional project capacity
150 shall be:
151 (A) made available as needed to meet the estimated electric requirements of entities or
152 consumers within the state; and
153 (B) owned, purchased, or consumed by entities or consumers within the state.
154 (ii) (A) As used in this Subsection (2)(b)(ii), "default provision" means a provision
155 authorizing a nondefaulting party to succeed to or require the disposition of the rights and
156 interests of a defaulting party.
157 (B) The requirements of Subsection (2)(b)(i) do not apply to the extent that those
158 requirements are not met due to the operation of a default provision in an agreement providing
159 for ownership or other interests in facilities providing additional project capacity.
160 Section 3. Section 11-13-304 is amended to read:
161 11-13-304. Certificate of public convenience and necessity required -- Exceptions.
162 (1) Before proceeding with the construction of any electrical generating plant or
163 transmission line, each interlocal entity and each out-of-state public agency shall first obtain
164 from the public service commission a certificate, after hearing, that public convenience and
165 necessity requires such construction and in addition that such construction will in no way
166 impair the public convenience and necessity of electrical consumers of the state of Utah at the
167 present time or in the future.
168 (2) The requirement to obtain a certificate of public convenience and necessity applies
169 to each project initiated after the section's effective date but does not apply to:
170 (a) a project for which a feasibility study was initiated prior to the effective date;
171 (b) any facilities providing additional project capacity; [
172 (c) any facilities providing replacement project capacity; or
173 [
174 described in Subsection (2)(a) or facilities providing additional project capacity or replacement
175 project capacity within the corridor of a transmission line, with reasonable deviation, of a
176 project producing as of April 21, 1987.
177 Section 4. Section 54-9-102 is amended to read:
178 54-9-102. Definitions.
179 As used in this chapter:
180 (1) "Common facilities" means all works and facilities:
181 (a) owned or used by two or more public power entities or power utilities; and
182 (b) necessary to the generation, transmission, or distribution of electric power and
183 energy.
184 (2) "Interlocal entity" has the same meaning as provided in Section 11-13-103 .
185 (3) "Power utility":
186 (a) means a public agency, as defined in Section 11-13-103 , or other person engaged in
187 generating, transmitting, distributing, or marketing electric power and energy; and
188 (b) does not include a public power entity.
189 (4) "Public power entity" means:
190 (a) a city or town that owns a system for the generation, transmission, or distribution of
191 electric power and energy for public or private use; and
192 (b) an interlocal entity.
193 Section 5. Section 54-9-108 is enacted to read:
194 54-9-108. Scope -- Ownership or use of works or facilities.
195 (1) Nothing in this chapter may be construed as imposing on an interlocal entity, as
196 defined in Section 11-13-101 , created on or before January 1, 1981, under Laws of Utah 1977,
197 Chapter 47, Section 3, as amended, or in an agreement to which an interlocal entity is a party,
198 any duty, requirement, or restriction other than those imposed by Title 11, Chapter 13,
199 Interlocal Cooperation Act.
200 (2) For purposes of this chapter, a person does not own or use works or facilities if the
201 person is a party to a power sales contract to purchase output generated by, the capacity of, or
202 an entitlement in the works or facilities.
Legislative Review Note
as of 11-21-11 10:56 AM