H.B. 42 Enrolled

             1     

CONSTRUCTION LIENS AMENDMENTS

             2     
2014 GENERAL SESSION

             3     
STATE OF UTAH

             4     
Chief Sponsor: R. Curt Webb

             5     
Senate Sponsor: Scott K. Jenkins

             6     
             7      LONG TITLE
             8      General Description:
             9          This bill amends provisions relating to preconstruction and construction liens.
             10      Highlighted Provisions:
             11          This bill:
             12          .    clarifies the claims available under Title 14, Chapter 1, Public Contracts, and Title
             13      14, Chapter 2, Private Contracts;
             14          .    defines and modifies terms in Title 38, Chapter 1a, Preconstruction and
             15      Construction Liens;
             16          .    provides that a person who files a preliminary notice that links to a preliminary
             17      notice filed by an original contractor has substantially complied with the provisions
             18      of Title 38, Chapter 1a, Preconstruction and Construction Liens;
             19          .    modifies the procedure by which a mortgage or a trust deed gains priority over an
             20      earlier-filed preliminary notice; and
             21          .    makes technical and conforming changes.
             22      Money Appropriated in this Bill:
             23          None
             24      Other Special Clauses:
             25          None
             26      Utah Code Sections Affected:
             27      AMENDS:
             28           14-1-20 , as last amended by Laws of Utah 2012, Chapters 278 and 330
             29           14-2-5 , as last amended by Laws of Utah 2012, Chapters 278 and 330


             30           38-1a-102 , as last amended by Laws of Utah 2013, Chapter 464
             31           38-1a-501 , as renumbered and amended by Laws of Utah 2012, Chapter 278
             32           38-1a-503 , as renumbered and amended by Laws of Utah 2012, Chapter 278
             33     
             34      Be it enacted by the Legislature of the state of Utah:
             35          Section 1. Section 14-1-20 is amended to read:
             36           14-1-20. Preliminary notice requirement.
             37          (1) Any person [furnishing] who furnishes labor, service, equipment, or material for
             38      which a [payment bond] claim may be made under this chapter shall provide preliminary notice
             39      to the designated agent as prescribed by Section 38-1b-202 , except that this section does not
             40      apply:
             41          (a) to an individual performing labor for wages; or
             42          (b) if a notice of commencement is not filed as prescribed in Section 38-1b-201 for the
             43      project or improvement for which labor, service, equipment, or material is furnished.
             44          (2) Any person who fails to provide the preliminary notice required by Subsection (1)
             45      may not make a [payment bond] claim under this chapter.
             46          (3) The preliminary notice required by Subsection (1) shall be provided prior to
             47      commencement of any action on the payment bond.
             48          (4) Subsection (1)(a) does not exempt the following from complying with the
             49      requirements of this section:
             50          (a) a temporary labor service company or organization;
             51          (b) a professional employer company or organization; or
             52          (c) any other entity that provides labor.
             53          Section 2. Section 14-2-5 is amended to read:
             54           14-2-5. Preliminary notice requirement.
             55          (1) Any person [furnishing] who furnishes labor, service, equipment, or material for
             56      which a [payment bond] claim may be made under this chapter shall provide preliminary notice
             57      to the designated agent as prescribed by Section 38-1a-501 , except that this section does not


             58      apply to an individual performing labor for wages.
             59          (2) Any person who fails to provide the preliminary notice required by Subsection (1)
             60      may not make a [payment bond] claim under this chapter.
             61          (3) The preliminary notice required by Subsection (1) shall be provided prior to
             62      commencement of any action on the payment bond.
             63          (4) Subsection (1) does not exempt the following from complying with the
             64      requirements of this section:
             65          (a) a temporary labor service company or organization;
             66          (b) a professional employer company or organization; or
             67          (c) any other entity that provides labor.
             68          Section 3. Section 38-1a-102 is amended to read:
             69           38-1a-102. Definitions.
             70          As used in this chapter:
             71          (1) "Alternate means" means a method of filing a legible and complete notice or other
             72      document with the registry other than electronically, as established by the division by rule.
             73          (2) "Anticipated improvement" means the improvement:
             74          (a) for which preconstruction service is performed; and
             75          (b) that is anticipated to follow the performing of preconstruction service.
             76          (3) "Applicable county recorder" means the office of the recorder of each county in
             77      which any part of the property on which a claimant claims or intends to claim a preconstruction
             78      or construction lien is located.
             79          (4) "Bona fide loan" means a loan to an owner or owner-builder by a lender in which
             80      the owner or owner-builder has no financial or beneficial interest greater than 5% of the voting
             81      shares or other ownership interest.
             82          (5) "Claimant" means a person entitled to claim a preconstruction or construction lien.
             83          (6) "Compensation" means the payment of money for a service rendered or an expense
             84      incurred, whether based on:
             85          (a) time and expense, lump sum, stipulated sum, percentage of cost, cost plus fixed or


             86      percentage fee, or commission; or
             87          (b) a combination of the bases listed in Subsection (6)(a).
             88          (7) "Construction lender" means a person who makes a construction loan.
             89          [(7)] (8) "Construction lien" means a lien under this chapter for construction work.
             90          [(8)] (9) "Construction loan" does not include a consumer loan secured by the equity in
             91      the consumer's home.
             92          [(9)] (10) "Construction project" means [construction work provided under] an
             93      improvement that is constructed pursuant to an original contract.
             94          [(10)] (11) "Construction work":
             95          (a) means labor, service, material, or equipment provided for the purpose and during
             96      the process of constructing, altering, or repairing an improvement; and
             97          (b) includes scheduling, estimating, staking, supervising, managing, materials testing,
             98      inspection, observation, and quality control or assurance involved in constructing, altering, or
             99      repairing an improvement.
             100          [(11)] (12) "Contestable notice" means a notice of preconstruction service under
             101      Section 38-1a-401 , a preliminary notice under Section 38-1a-501 , or a notice of completion
             102      under Section 38-1a-506 .
             103          [(12)] (13) "Contesting person" means an owner, original contractor, subcontractor, or
             104      other interested person.
             105          [(13)] (14) "Designated agent" means the third party the division contracts with as
             106      provided in Section 38-1a-202 to create and maintain the registry.
             107          [(14)] (15) "Division" means the Division of Occupational and Professional Licensing
             108      created in Section 58-1-103 .
             109          [(15)] (16) "Entry number" means the reference number that:
             110          (a) the designated agent assigns to each notice or other document filed with the
             111      registry; and
             112          (b) is unique for each notice or other document.
             113          [(16)] (17) "Final completion" means:


             114          (a) the date of issuance of a permanent certificate of occupancy by the local
             115      government entity having jurisdiction over the construction project, if a permanent certificate
             116      of occupancy is required;
             117          (b) the date of the final inspection of the construction work by the local government
             118      entity having jurisdiction over the construction project, if an inspection is required under a
             119      state-adopted building code applicable to the construction work, but no certificate of occupancy
             120      is required;
             121          (c) unless the owner is holding payment to ensure completion of construction work, the
             122      date on which there remains no substantial work to be completed to finish the construction
             123      work under the original contract, if a certificate of occupancy is not required and a final
             124      inspection is not required under an applicable state-adopted building code; or
             125          (d) the last date on which substantial work was performed under the original contract,
             126      if, because the original contract is terminated before completion of the construction work
             127      defined by the original contract, the local government entity having jurisdiction over the
             128      construction project does not issue a certificate of occupancy or perform a final inspection.
             129          [(17)] (18) "First preliminary notice filing" means [the filing of] a preliminary notice
             130      that [is]:
             131          (a) is the earliest preliminary notice filed on the construction project for which the
             132      preliminary notice is filed;
             133          (b) is filed on a construction project that, at the time the preliminary notice is filed, has
             134      not reached final completion; and
             135          [(a) the earliest preliminary notice filed on a construction project;]
             136          [(b) filed on or after August 1, 2011;]
             137          [(c) not filed on a project that, according to the law in effect before August 1, 2011,
             138      commenced before August 1, 2011;]
             139          [(d) not canceled under Section 38-1a-307 ; and]
             140          [(e) not withdrawn under Subsection 38-1a-501 (5).]
             141          (c) is not cancelled under Section 38-1a-307 .


             142          [(18)] (19) "Government project-identifying information" has the same meaning as
             143      defined in Section 38-1b-102 .
             144          [(19)] (20) "Improvement" means:
             145          (a) a building, infrastructure, utility, or other human-made structure or object
             146      constructed on or for and affixed to real property; or
             147          (b) a repair, modification, or alteration of a building, infrastructure, utility, or object
             148      referred to in Subsection (19)(a).
             149          [(20)] (21) "Interested person" means a person that may be affected by a construction
             150      project.
             151          [(21)] (22) "Notice of commencement" means a notice required under Section
             152      38-1b-201 for a government project, as defined in Section 38-1b-102 .
             153          [(22)] (23) "Original contract":
             154          (a) means a contract between an owner and an original contractor for preconstruction
             155      service or construction work; and
             156          (b) does not include a contract between an owner-builder and another person.
             157          [(23)] (24) "Original contractor" means a person, including an owner-builder, that
             158      contracts with an owner[, other than an owner-builder,] to provide preconstruction service or
             159      construction work.
             160          [(24)] (25) "Owner" means the person that owns the project property.
             161          [(25)] (26) "Owner-builder" means an owner, including an owner who is also an
             162      original contractor, who:
             163          (a) contracts with one or more other persons for preconstruction service or construction
             164      work for an improvement on the owner's real property; and
             165          (b) obtains a building permit for the improvement.
             166          (27) "Preconstruction lien" means a lien under this chapter for a preconstruction
             167      service.
             168          [(26)] (28) "Preconstruction service":
             169          (a) means to plan or design, or to assist in the planning or design of, an improvement or


             170      a proposed improvement:
             171          (i) before construction of the improvement commences; and
             172          (ii) for compensation separate from any compensation paid or to be paid for
             173      construction work for the improvement; and
             174          (b) includes consulting, conducting a site investigation or assessment, programming,
             175      preconstruction cost or quantity estimating, preconstruction scheduling, performing a
             176      preconstruction construction feasibility review, procuring construction services, and preparing
             177      a study, report, rendering, model, boundary or topographic survey, plat, map, design, plan,
             178      drawing, specification, or contract document.
             179          [(28) "Prelender claimant" means a person whose construction lien is made subject to a
             180      construction lender's mortgage or trust deed, as provided in Section 38-1a-503 , by the person's
             181      acceptance of payment in full and the person's withdrawal of the person's preliminary notice.]
             182          (29) "Private project" means a construction project that is not a government project.
             183          (30) "Project property" means the real property on or for which preconstruction service
             184      or construction work is or will be provided.
             185          [(31) "Refiled preliminary notice" means a preliminary notice that a prelender claimant
             186      files with the registry on a construction project after withdrawing a preliminary notice that the
             187      claimant previously filed for the same project.]
             188          [(32)] (31) "Registry" means the State Construction Registry under Part 2, State
             189      Construction Registry.
             190          [(33)] (32) "Required notice" means:
             191          (a) a notice of preconstruction service under Section 38-1a-401 ;
             192          (b) a preliminary notice under Section 38-1a-501 or Section 38-1b-202 ;
             193          (c) a notice of commencement;
             194          (d) a notice of construction loan under Section 38-1a-601 ;
             195          (e) a notice under Section 38-1a-602 concerning a construction loan default;
             196          (f) a notice of intent to obtain final completion under Section 38-1a-506 ; or
             197          (g) a notice of completion under Section 38-1a-507 .


             198          [(34)] (33) "Subcontractor" means a person that contracts to provide preconstruction
             199      service or construction work to:
             200          (a) a person other than the owner; or
             201          (b) the owner, if the owner is an owner-builder.
             202          [(35)] (34) "Substantial work" does not include repair work or warranty work.
             203          [(36)] (35) "Supervisory subcontractor" means a person that:
             204          (a) is a subcontractor under contract to provide preconstruction service or construction
             205      work; and
             206          (b) contracts with one or more other subcontractors for the other subcontractor or
             207      subcontractors to provide preconstruction service or construction work that the person is under
             208      contract to provide.
             209          Section 4. Section 38-1a-501 is amended to read:
             210           38-1a-501. Preliminary notice.
             211          (1) (a) [(i)] A person who desires to claim a construction lien on real property shall file
             212      a preliminary notice with the registry no later than 20 days after the day on which the person
             213      commences providing construction work on the real property.
             214          [(ii) A prelender claimant who provides construction work to a construction project
             215      after the recording of a construction lender's mortgage or trust deed on the project property and
             216      who desires to claim a construction lien for that construction work shall file a preliminary
             217      notice with the registry no later than 20 days after the recording of the mortgage or trust deed.]
             218          (b) Subject to Subsection (1)(c), a preliminary notice is effective as to all construction
             219      work that the person filing the notice provides to the construction project under a single
             220      original contract, including construction work that the person provides to more than one
             221      supervisory subcontractor under that original contract.
             222          (c) (i) A person who desires to claim a construction lien on real property but fails to
             223      file a timely preliminary notice within the period specified in Subsection (1)(a) may, subject to
             224      Subsection (1)(d), file a preliminary notice with the registry after the period specified in
             225      Subsection (1)(a).


             226          (ii) A person who files a preliminary notice under Subsection (1)(c)(i) may not claim a
             227      construction lien for construction work the person provides to the construction project before
             228      the date that is five days after the preliminary notice is filed.
             229          (d) Notwithstanding Subsections (1)(a) and (c), a preliminary notice has no effect if it
             230      is filed more than 10 days after the filing of a notice of completion under Section 38-1a-507 for
             231      the construction project for which the preliminary notice is filed.
             232          (e) A person who fails to file a preliminary notice as required in this section may not
             233      claim a construction lien.
             234          (f) [(i) Except as provided in Subsection (1)(f)(ii), a] A preliminary notice that is filed
             235      with the registry as provided in this section is considered to be filed at the time of the first
             236      preliminary notice filing.
             237          [(ii) A timely filed preliminary notice that is a refiled preliminary notice is considered
             238      to be filed immediately after the recording of a mortgage or trust deed of the construction
             239      lender that paid the pre-lender claimant in full for construction work the claimant provided
             240      before the recording of the mortgage or trust deed.]
             241          (g) If a preliminary notice filed with the registry includes the tax parcel identification
             242      number of a parcel not previously associated in the registry with a construction project, the
             243      designated agent shall promptly notify the person who filed the preliminary notice that:
             244          (i) the preliminary notice includes a tax parcel identification number of a parcel not
             245      previously associated in the registry with a construction project; and
             246          (ii) the likely explanation is that:
             247          (A) the preliminary notice is the first filing for the project; or
             248          (B) the tax parcel identification number is incorrectly stated in the preliminary notice.
             249          (h) A preliminary notice shall include:
             250          (i) the name, address, telephone number, and email address of the person providing the
             251      construction work for which the preliminary notice is filed;
             252          (ii) the name and address of the person who contracted with the claimant for the
             253      construction work;


             254          (iii) the name of the record or reputed owner;
             255          (iv) the name of the original contractor for construction work under which the claimant
             256      is providing or will provide construction work;
             257          (v) the address of the project property or a description of the location of the project;
             258          (vi) the name of the county in which the project property is located; and
             259          (vii) (A) the tax parcel identification number of each parcel included in the project
             260      property;
             261          (B) the entry number of a previously filed notice of construction loan under Section
             262      38-1a-601 on the same project;
             263          (C) the entry number of a previously filed preliminary notice on the same project that
             264      includes the tax parcel identification number of each parcel included in the project property; or
             265          (D) the entry number of the building permit issued for the project.
             266          (i) A preliminary notice may include:
             267          (i) the subdivision, development, or other project name applicable to the construction
             268      project for which the preliminary notice is filed; and
             269          (ii) the lot or parcel number of each lot or parcel that is included in the project
             270      property.
             271          (2) (a) [The] Except as provided in Subsection (2)(b), the burden is upon the person
             272      filing the preliminary notice to prove that the person has substantially complied with the
             273      requirements of this section.
             274          (b) A person has substantially complied with the requirements of this section if the
             275      person files a preliminary notice that links, within the registry, to a preliminary notice filed by
             276      an original contractor for the same construction project, using the entry number assigned to the
             277      original contractor's preliminary notice.
             278          [(b)] (c) Substantial compliance with the requirements of Subsections (1)(h)(iii)
             279      through (vii) may be established by a person's reasonable reliance on information in the registry
             280      provided by a previously filed:
             281          (i) notice of construction loan under Section 38-1a-601 ;


             282          (ii) preliminary notice; or
             283          (iii) building permit.
             284          (3) (a) Subject to Subsection (3)(b), a person required by this section to give
             285      preliminary notice is required to give only one notice for each construction project.
             286          (b) If the construction work is provided pursuant to contracts under more than one
             287      original contract for construction work, the notice requirements shall be met with respect to the
             288      construction work provided under each original contract.
             289          (4) A person filing a preliminary notice by alternate means is responsible for verifying
             290      and changing any incorrect information in the preliminary notice before the expiration of the
             291      time period during which the notice is required to be filed.
             292          [(5) (a) A person who files a preliminary notice before the recording of a construction
             293      lender's mortgage or trust deed may withdraw the preliminary notice by filing with the registry
             294      a notice of withdrawal as provided in Subsection (5)(b).]
             295          [(b) A notice of withdrawal shall include:]
             296          [(i) the information required for a preliminary notice under Subsection (1)(g); and]
             297          [(ii) the entry number of the preliminary notice being withdrawn.]
             298          [(6)] (5) A person who files a preliminary notice that contains inaccurate or incomplete
             299      information may not be held liable for damages suffered by any other person who relies on the
             300      inaccurate or incomplete information in filing a preliminary notice.
             301          Section 5. Section 38-1a-503 is amended to read:
             302           38-1a-503. Relation back and priority of liens.
             303          (1) A construction lien relates back to, and takes effect as of, the time of the first
             304      preliminary notice filing.
             305          (2) (a) Subject to Subsection (2)(b), a construction lien has priority over:
             306          (i) any lien, mortgage, or other encumbrance that attaches after the first preliminary
             307      notice filing; and
             308          (ii) any lien, mortgage, or other encumbrance of which the claimant had no notice and
             309      which was unrecorded at the time of the first preliminary notice filing.


             310          [(b) A recorded mortgage or trust deed of a construction lender has priority over a
             311      construction lien of a claimant who files a preliminary notice in accordance with Section
             312      38-1a-501 before the mortgage or trust deed is recorded if the claimant:]
             313          [(i) accepts payment in full for construction work that the claimant provides to the
             314      construction project before the mortgage or trust deed is recorded; and]
             315          [(ii) withdraws the claimant's preliminary notice by filing a notice of withdrawal under
             316      Subsection 38-1a-501 (5).]
             317          (b) A recorded mortgage or trust deed that secures a construction loan attaches
             318      immediately before the first preliminary notice filing for the construction project if each
             319      claimant that has a preliminary notice on file on the construction project before the mortgage or
             320      trust deed was recorded receives full payment for all construction work the claimant performed
             321      before the mortgage or trust deed was recorded, regardless of whether the claimant receives full
             322      payment before or after the day on which the mortgage or trust deed is recorded.


[Bill Documents][Bills Directory]