Agency: Transportation Line Item: Safe Sidewalk Construction Function The purpose of the Safe Sidewalk Construction Program of the Department of Transportation is to fund the cost of correcting pedestrian hazards and other safety projects on State highways.
The Department of Transportation has been appropriated funds annually for its sidewalk safety program. These funds are then obligated for pedestrian safety projects when matched with funding from local governments. The current formula for distribution of appropriated Sidewalk Program Funds is based on three areas of criteria. Population estimates make up 25 percent of the formula. School enrollments for the previous school year making up another 25 percent, while pedestrian accidents on state highways make up the remaining 50 percent of the criteria. Statutory Authority The Safe Sidewalk Construction program of the Department of Transportation is governed by Title 72 Chapter 8 of the Utah Code. Intent Language The Legislature intends that the funds appropriated from the Transportation Fund for pedestrian safety projects be used specifically to correct pedestrian hazards on State highways.
The Legislature also intends that local authorities be encouraged to participate in the construction of pedestrian safety devices. The appropriated funds are to be used according to the criteria set forth in Section 72-8-104, Utah code Annotated, 1953. The funds appropriated for sidewalk construction shall not lapse. If local governments cannot use their allocation of Sidewalk Safety Funds in two years, these funds will be available for other governmental entities which are prepared to use the resources. It is the intent of the Legislature that local participation in the Sidewalk Construction Program is on a 75% state and 25% local match basis. Funding Detail For more detail about a particular source of finance or organizational unit, click a linked entry in the left column of the table(s) below. 2010 Actual | 2011 Actual | 2012 Actual | 2013 Actual | 2014 Approp | 2014 Change | 2014 Revised | 2015 Change | 2015 Approp |
---|
$500,000 | $500,000 | $500,000 | $500,000 | $500,000 | $0 | $500,000 | $0 | $500,000 |
---|
$78,900 | $407,600 | $520,300 | $447,200 | $0 | $459,000 | $459,000 | ($459,000) | $0 |
---|
($407,600) | ($520,300) | ($447,200) | ($459,000) | $0 | $0 | $0 | $0 | $0 |
---|
$171,300 | $387,300 | $573,100 | $488,200 | $500,000 | $459,000 | $959,000 | ($459,000) | $500,000 |
---|
Programs: (click linked program name to drill-down) |
---|
Sidewalk Construction | Total |
---|
2010 Actual | 2011 Actual | 2012 Actual | 2013 Actual | 2014 Approp | 2014 Change | 2014 Revised | 2015 Change | 2015 Approp |
---|
$171,300 | $387,300 | $573,100 | $488,200 | $500,000 | $459,000 | $959,000 | ($459,000) | $500,000 |
---|
$171,300 | $387,300 | $573,100 | $488,200 | $500,000 | $459,000 | $959,000 | ($459,000) | $500,000 |
---|
Categories of Expenditure (mouse-over category name for definition) |
---|
Capital Outlay | Total |
---|
2010 Actual | 2011 Actual | 2012 Actual | 2013 Actual | 2014 Approp | 2014 Change | 2014 Revised | 2015 Change | 2015 Approp |
---|
$171,300 | $387,300 | $573,100 | $488,200 | $500,000 | $459,000 | $959,000 | ($459,000) | $500,000 |
---|
$171,300 | $387,300 | $573,100 | $488,200 | $500,000 | $459,000 | $959,000 | ($459,000) | $500,000 |
---|
|